INTERSECTION MODIFICATION AND TRAFFIC SIGNALS
CITY STREET (S DOUGLAS BOULEVARD): AT THE INTERSECTION
OF SE 29TH ST, 0.23 MILES NORTH OF I-40 IN THE CITY OF MIDWEST CITY.
PROJECT LENGTH= 0.602 MILES
Modify the intersection of S Douglas Boulevard and SE 29th Street 0.23 miles north of I-40, including roadway excavation, stabilized subgrade, asphalt and concrete pavement, cold milling, curb and gutter, sidewalks, driveways, storm drainage structures and pipe, water meter and hydrant work, traffic signals with poles, mast arms, controllers, video detection and pedestrian equipment, signing and plural-component striping, roadway lighting, construction traffic control, construction staking, SWPPP documentation and mobilization.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260256), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.