There will be a pre-bid meeting for this proposal.
GRADE, DRAIN, BRIDGE, AND SURFACE
TURNER TURNPIKE (OTA ACCESS): INTERCHANGE AT SH-16, SH-48,
AND FRONTAGE ROADS NEAR BRISTOW.
PROJECT LENGTH=5.337 MILES
The work includes clearing and grubbing, unclassified excavation, borrow, settlement plates, test rolling, salvaged topsoil, machine grading, temporary silt fence, reinforced silt fence, temporary silt dike, temporary rock filter dam, temporary fiber log, temporary inlet sediment filter, inlet protection, solid slab sodding, hydromulch, mowing, stabilized construction exit, aggregate base, stabilized subgrade, separator fabric, traffic bound surface course, tack coat, prime coat, Superpave asphalt, cold milling pavement, substructure excavation, CLSM backfill, class A, AA, and C concrete, epoxy coated reinforcing steel, temporary sheet piling, riprap, filter fabric, combined curb and gutter, concrete sidewalk, concrete dividing strip, tactile warning devices, manholes, inlets, reinforced concrete pipe, perforated pipe underdrain, edge drain conduit, edge drain outlet lateral, prefabricated culvert end sections, culvert end treatments, outlet lateral headwalls, removal of structures, headwalls, fence, asphalt pavement, drainage inlets, manholes, concrete driveway, asphalt driveway, sawing pavement, fence, prestressed concrete beams, approach slabs, saw-cut grooving, F-shaped parapet, structural steel, stainless steel bearings, slope walls, mechanical splices, piles, water repellent, drilled shafts, crosshole sonic logging, elastomeric coating, expansion joint systems, sealer crack preparation, sealer resin, removal of existing bridge structures, beam guardrail, guardrail end treatments, guardrail bridge connections, traffic signal conduit, pull boxes, signal poles, roadway luminaires, electrical conductors, traffic signal controller assembly, detection system, signal heads, backplates, traffic signal cable, optical detectors, phase selectors, mast arm mounted signs, galvanized steel conduit, junction boxes, breakaway bases, service poles, sheet aluminum signs, extruded aluminum panel signs, delineators, traffic stripe, pavement marking removal, barricades, warning lights, impact attenuators, portable traffic signal systems, construction traffic stripe, construction zone pavement markers, construction zone impact attenuators, truck mounted attenuators, portable longitudinal barrier, construction signs, wing barricades, vertical panels, drums, flaggers, traffic surveillance, portable changeable message signs, ITS infrastructure, construction staking, SWPPP documentation and management, field office, mobilization, tolling structural steel, drilled shafts, electric service, electrical equipment, conduit, cabinets, overhead sign structures, and toll gantries.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260227), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.