There will be a pre-bid meeting for this proposal.
BRIDGE AND APPROACHES
TOBY KEITH EXPRESSWAY (OTA ACCESS): OVER SE 104TH STREET,
1.5 MILES SOUTH OF THE I-40 INTERCHANGE IN THE CITY OF OKLAHOMA CITY.
PROJECT LENGTH = 0.340 MILES
Provide bridge and approaches construction including roadway clearing, unclassified excavation and borrow, salvaged topsoil, silt fence and dike, rock filter dams, sodding, hydromulch, concrete drainage structures, pipe and inlets, fence and removals; construct Bridge BB and Bridge CC with substructure excavation, CLSM backfill, prestressed Type IV beams, approach slabs, parapets, structural and reinforcing steel, bearings, piles, drilled shafts, logging, coatings, joints and underdrains; plus traffic control devices, construction staking Level II, SWPPP management and mobilization.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260286), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.