- User
- 430479
- Title
- Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam
- Value
- 11,200,000.00
- Zones
- 1, 2, 3, 4, 5
- Opt Out
- Yes
- Status
- 1
- Created
- 8/17/2026 3:44 pm
- Approved
- Yes
- Nigp Codes
- 90775-Site Assessment And Site Field Observation;
91104-C.I.P., Architect/Engineer Extra Services;
91107-C.I.P., Architectural and Engineering Services;
92500-Engineering Services, Professional;
92523-Dam Engineering;
92534-Energy Management Engineering;
92535-Environmental Engineering;
92538-Field Engineering;
92540-Fisheries; Fish Ladders - Engineering;
92544-General Construction: Management, Scheduling, Cost Estimation - Engineering;
92550-Hydroelectric Engineering;
92555-Inspecting, General/Engineering;
92556-Inspecting, Structural/Engineering;
92558-Irrigation; Drainage; Flood Control/Engineering;
92561-Land Development And Planning/Engineering;
92517-Civil Engineering;
92546-Geotechnical Engineering;
92588-Structural Engineering;
- Zones List
- Zone
- 1
- Selected
- Yes
- Internalid
- 1
- Zone
- 2
- Selected
- Yes
- Internalid
- 2
- Zone
- 3
- Selected
- Yes
- Internalid
- 3
- Zone
- 4
- Selected
- Yes
- Internalid
- 4
- Zone
- 5
- Selected
- Yes
- Internalid
- 5
- Agency Name
- Brazos River Authority - K4600
- Internalid
- 549765
- Opt Out Flag
- Yes
- Plan Repost
- No
- Status Name
- Posted
- Attachments
- Id
- 549765
- File Id
- 33628022
- File URL
- /core/media/media.nl?id=33628022&c=852252&h=c9WL6o3qWM1KseHmiSpZfbaKoTz9Ulzb_m0aQ1oDzZeNRARX&_xt=.pdf
- File Name
- ESBD_549765_1786999801381_RFP 26-1385 - LL HPRS_FINALtoPOST.pdf
- File Description
- PDF of RFP No. 26-1385 solicitation and Attachment A
- Contact Name
- Allison Sheeler
- Ctcd Cert Num
- 1900041027
- Description
- <p>This Request for Proposal (RFP) solicits information from engineering firms as to their qualifications to conduct an engineering investigation to assess the following: 1) the condition and functionality of the HPRS and recommend remedial improvements (as needed) for all HPRS components and instruments in the West Embankment, Service Spillway, and East Embankment; 2) the structural condition of the stilling basin concrete components (i.e., slab, baffle blocks, end sill, walls, clean-out drains, etc.) in order to determine any necessary structural repairs, and 3) the downstream river channel and river banks to determine the recommended erosion protection system alternatives that will fully remediate the existing scouring and erosion present, prevent future destabilization that can lead to undermining the safety and stability of the dam; in order to achieve an additional minimum service life of 40 years for all assessed components. In addition, if applicable, to design and oversee the construction of the required improvements or rehabilitation efforts in accordance to applicable current USACE and TCEQ requirements for large high hazard dams.</p>
- Posting Date
- 8/17/2026
- Response Due
- 10/14/2026
- User Follows
- No
- Agency Number
- K4600
- Contact Email
- Allison.Sheeler@Brazos.org
- Last Modified
- 8/17/2026 3:50 pm
- Response Time
- 10:00 AM
- Contact Number
- (254) 761-3153
- Created From POD
- No
- Solicitation Id
- RFP_No._26-1385
- State Agency Cert
- 2
- Highway Districts
- 1, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 2, 20, 21, 22, 23, 24, 25, 3, 4, 5, 6, 7, 8, 9
- Posting Requirement
- 3
- Highway District List
- District
- 1
- Selected
- Yes
- Internalid
- 1
- District Name
- Paris
- District
- 2
- Selected
- Yes
- Internalid
- 2
- District Name
- Fort Worth
- District
- 3
- Selected
- Yes
- Internalid
- 3
- District Name
- Wichita Falls
- District
- 4
- Selected
- Yes
- Internalid
- 4
- District Name
- Amarillo
- District
- 5
- Selected
- Yes
- Internalid
- 5
- District Name
- Lubbock
- District
- 6
- Selected
- Yes
- Internalid
- 6
- District Name
- Odessa
- District
- 7
- Selected
- Yes
- Internalid
- 7
- District Name
- San Angelo
- District
- 8
- Selected
- Yes
- Internalid
- 8
- District Name
- Abilene
- District
- 9
- Selected
- Yes
- Internalid
- 9
- District Name
- Waco
- District
- 10
- Selected
- Yes
- Internalid
- 10
- District Name
- Tyler
- District
- 11
- Selected
- Yes
- Internalid
- 11
- District Name
- Lufkin
- District
- 12
- Selected
- Yes
- Internalid
- 12
- District Name
- Houston
- District
- 13
- Selected
- Yes
- Internalid
- 13
- District Name
- Yoakum
- District
- 14
- Selected
- Yes
- Internalid
- 14
- District Name
- Austin
- District
- 15
- Selected
- Yes
- Internalid
- 15
- District Name
- San Antonio
- District
- 16
- Selected
- Yes
- Internalid
- 16
- District Name
- Corpus Christi
- District
- 17
- Selected
- Yes
- Internalid
- 17
- District Name
- Bryan
- District
- 18
- Selected
- Yes
- Internalid
- 18
- District Name
- Dallas
- District
- 19
- Selected
- Yes
- Internalid
- 19
- District Name
- Atlanta
- District
- 20
- Selected
- Yes
- Internalid
- 20
- District Name
- Beaumont
- District
- 21
- Selected
- Yes
- Internalid
- 21
- District Name
- Pharr
- District
- 22
- Selected
- Yes
- Internalid
- 22
- District Name
- Laredo
- District
- 23
- Selected
- Yes
- Internalid
- 23
- District Name
- Brownwood
- District
- 24
- Selected
- Yes
- Internalid
- 24
- District Name
- El Paso
- District
- 25
- Selected
- Yes
- Internalid
- 25
- District Name
- Childress
- State Agency Cert Text
- Dual CTCD/CTCM certification
- Posting Requirement Text
- 21+ Days for Solicitation Notice