The scope of work shall include furnishing the necessary labor and equipment for the Construction of the Gibson Grove Subdivision 15 kV Underground Electrical Distribution Line for the Commission of Public Works of Laurens, South Carolina as shown on the construction drawings. All material shall be furnished by the Owner, and all construction shall be labor only with the contractor furnishing the necessary labor and equipment, unless otherwise specified, to complete the proposed project.
Delivery Method: Other
Documents: LCPW Website
The scope of work includes furnishing the necessary labor and equipment for the construction of the Gibson Grove Subdivision 15 kV Underground Electrical Distribution Line as shown on the construction drawings. All material shall be furnished by the Owner, and all construction shall be labor only with the contractor furnishing the necessary labor and equipment, unless otherwise specified, to complete the proposed project. The work includes installation of conductor units, padmounted transformers, padmounted switchgear, primary enclosures, box pads, ground sleeves, load-break and dead-break elbows, fault indicators, protective caps, inserts, insulators, primary splices, surge arresters, cable route warning signs, grounding assemblies, trenching, bore and pull back, conduit, current transformers, insect treatment, marker tape, meter bases, rock excavation, secondary connector blocks, street lights, fiberglass street light poles, secondary cable terminals, street light pole wiring, and secondary dip pole wiring. The contractor must also perform patching or replacing pavement or concrete in public right-of-way and on private property, and backfill trenches with an eight-inch ABC stone base and three inches of asphalt.
We post new electrical opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Laurens Commission of Public Works, retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.