SOW
565-22-500 Correct Electrical Deficiencies
Fayetteville VAMC
Intent
The project consists of correcting electrical deficiencies as noted from previous VA facility assessments. Improvements include; New electrical entrance building, medium voltage loop replacement, replace electrical distribution equipment, ground conductor corrections, incidental electrical equipment cleanup throughout the Fayetteville VAMC, and minor HVAC and Plumbing improvements. Period of performance 1,174 calendar days.
Medium Voltage
VA owned medium voltage loop and entrance equipment will be modified or replaced with the following scope:
Replace existing medium voltage entrance equipment with new at campus entrance.
Provide new building:
Slab on grade, brick on CMU wall, Slate roof tile (to match existing facility)
Provide new VA owned medium voltage cables in concrete encased duct bank for medium voltage loop. Approximately 300 .
Demo and remove old VA owned medium voltage entrance metal shack.
Replace medium voltage sectionalized switch.
Provide new metal-clad switchgear with draw-out vacuum circuit breakers.
Replace medium voltage oil filled transformer (1)
Panel Replacement and Branch Circuit Improvements
Correct deficiencies to electrical panels and branch circuit wiring which are not correctly sized, protected, or are at end of useful life, as identified through various inspections over the years. o
All work will be phased. All replacements to existing equipment will require the contractor to filled-out a phasing plan for VA approval. All replacements to existing equipment will require a temporary power solution to minimize electrical outage to existing areas. Such deficiencies include:
Replace-in-same-room building entrance and large distribution equipment:
Normal (service entrance) Switchboards: approx. 2
Generator switchboards: approx. 2
Automatic transfer switch: approx. 7
Replace-in-place distribution panels and panelboards distribution equipment
Distribution Panels: approx. 5
Panelboards: approx. 68
Replace undersized feeders
Redundant Gound
Provide redundant equipment grounding conductor to a portion of the facility.
Approx. 100,000 square feet of existing electrical branch circuit distribution in occupied space.
HVAC And Plumbing
Reroute (vertically & horizontally) Sewer piping and hot water piping to avoid electrical room.
Provide exhaust fan to new Medium Voltage building.
Incidental Electrical Equipment Cleanup
Provide Identification tag to new and existing equipment throughout the facility: approx. 100 tags
Clean debris from existing electrical enclosures throughout the facility: approx. 30 enclosures.
Correct panel grounding, terminate cable directly to existing panel s ground bar: approx. 30 panels.
ALTERNATE NO.1: BASE BID except delete Bldg 1, Floor 1 and Floor 3 of deficiency item 134 which directs the contractor to provide ground conductors in existing conduit. Which is noted on Sheet B01-E200.
The project corrects electrical deficiencies at the Fayetteville VAMC including a new electrical entrance building, medium-voltage loop replacement, replacement of electrical distribution equipment, ground conductor corrections, incidental electrical equipment cleanup, and minor HVAC and plumbing improvements. Medium-voltage work modifies or replaces VA-owned loop and entrance equipment, provides a new brick-on-CMU building with slate tile, new cables in concrete-encased duct bank, new metal-clad switchgear with draw-out vacuum breakers, sectionalizing switch replacement, and one oil-filled transformer replacement with demolition of the old metal shack. Interior work replaces switchboards, generator switchboards, automatic transfer switches, distribution panels and panelboards in place with phasing and temporary power, replaces undersized feeders, provides redundant grounding conductor, reroutes piping away from electrical rooms, provides exhaust ventilation, and performs tagging, cleaning and grounding corrections, plus Alternate No.1 deleting Bldg 1 Floor 1 and Floor 3 of deficiency item 134.
We post new electrical opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""565-22-500 Combined Set 20251118.pdf"43575149"file"".pdf""1""2026-11-05T13:39:42.298+00:00""5f10e13588614e73b8d6093cc7ecfab1""public""0""public""d34a213f632e40ee943fbdd629b39098""0"4"0""36C24627B0001.docx"277133"file"".docx""1""2026-11-05T00:14:33.917+00:00""fce44ccd7d284764aaab7b95b2f6f0be""public""0""public""11cd42147155492b934a9dd2d85f686c""0"3"0""Correct Electrical Deficiencies Specifications.pdf"3378030"file"".pdf""1""2026-11-05T00:14:33.917+00:00""dfdec00c876c4ccdae3c51b3e1f7129f""public""0""public""fc00eaf065c94cf99d2568b5de80ecfc""0"2"0""ATTACHMENT - BAA TAA COMPLIANCE CERTIFICATION.docx"21409"file"".docx""1""2026-11-05T00:14:33.917+00:00""29e6d67e83804f3882e43b6615220efd""public""0""public""bceea2c366d24ea5bfb9379fc7f14e99""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.