Oregon Parks and Recreation ITB #14564 Smith Rock State Park Visitor Improvement Project
Pre-Bid Conference: A voluntary pre-bid conference will be held on
The work consists of three base sub-projects and one additive alternate. SubProject 1 – Rim Rock Trail Improvements includes mobilization, survey, erosion control, traffic control, demolition, tree removal, asphalt sawcut and excavation, general excavation, rock excavation, base rock, pavement markings, concrete curb, concrete paving (vehicular and pedestrian), crushed rock paving, wheel stops, bollards, split rail fence, stone faced wall, boulder placement, bench installation, landscaping, and ADA signs. SubProject 2 – North Rim Rock Trail Extension includes mobilization, survey, erosion control, traffic control, demolition, general excavation, rock excavation, base rock, crushed rock paving, split rail fence, boulder placement, salvage log placement, bench installation, and landscaping. SubProject 3 – Overflow Parking Lot Improvements includes mobilization, survey, erosion control, traffic control, demolition, tree removal, general excavation, rock excavation, base rock, asphalt paving, pavement markings, concrete curb, concrete paving, crushed rock paving, wheel stops, gravity storm sewer (6", 8", 12"), cleanouts, outfall, overflow inlet, stormwater basin, electrical conduit, split rail fence, boulder placement, gate installation, salvage gate reinstall, pay station installation, landscaping, sign reinstallation, and mailbox reinstall. Additive Alternate SubProject 4 – Restroom Plaza includes mobilization, survey, erosion control, demolition, tree removal, general excavation, rock excavation, base rock, concrete paving, crushed rock paving, boulder placement, bench installation, information kiosk installation, bicycle rack installation, trash receptacle installation, and landscaping.
We post new general contractors opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OregonBuys (bid S-63400-00018081), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.