1. Project Summary: The U.S. General Services Administration (GSA), intends to procure construction services for a design-bid-build project for the development of a Joint Cyber Facility (JCF) for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) at the Denver Federal Center in Lakewood, Colorado.
This requirement for a new turnkey JCF consists of approximately 23,688 square feet of combined office and support space, including approximately 16,000 square feet of finished office workspace and 7,688 square feet of existing mechanical and electrical rooms supporting the space. The project includes integration of existing equipment from a prior data center installation. The finished space includes a reception area, offices, conference rooms, hoteling cubicles, pantry, server room, and a large video conferencing room.
Construction and tenant build-out will occur within an occupied facility, necessitating careful coordination with active surrounding tenants. Work includes, demolition, architectural, mechanical, electrical, plumbing, fire protection, telecommunications, audio visual system infrastructure, security infrastructure, equipment, and coordinating installation of system furniture components, all of which must strictly adhere to accreditation requirements and standards.
2. Solicitation Documents and Access Requirements
NOTICE: Project-related documents, including drawings, specifications, and other supporting technical information, are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Request for Controlled Unclassified Information (CUI)) and any required Business License Form and submit the completed/signed forms to the Contracting Officer at jamie.potter@gsa.gov**.**
After submitting the required forms, offerors must request access to the controlled documents through SAM.gov**. Access will be granted through** SAM.gov to offerors that have submitted properly completed forms and requested access to the controlled documents.
3. Pre-Proposal Conference / Site Visit
Date: Thursday, November 12, 2026
Location: Building 810 Lobby, Denver Federal Center, Lakewood, Colorado
RSVP Deadline: Tuesday, November 10, 2026, at 11:00 a.m. (Mountain Time)
RSVP Registration Link: https://forms.gle/SL5GCKVBnby2Bb7j6
Interested offerors planning to attend the site visit must RSVP using the registration link provided above no later than the specified deadline.
All questions regarding the solicitation shall be submitted in writing via email to the Contracting Officer no later than Thursday, November 19, 2026, at 11:00 a.m. Mountain Time.
Questions received after the deadline may not be considered. The Government anticipates issuing responses to timely submitted questions through a solicitation amendment.
5. Proposal Submission
Proposal Due Date: Monday, December 7, 2026
Proposal Due Time: 11:00 a.m. Mountain Time
Offerors shall submit proposals in accordance with the instructions and requirements identified in the solicitation documents.
6. Additional Information
The solicitation and its associated documents establish the complete requirements, terms, conditions, evaluation criteria, and proposal submission instructions for this procurement.
Offerors are responsible for monitoring SAM.gov for solicitation amendments and other official updates.
The contractor shall provide all management, supervision, labor, materials, equipment and other resources to complete the turnkey Joint Cyber Facility of approximately 23,688 square feet in Building 810/Suite 7000, including demolition of existing data center interior, architectural, mechanical, electrical, plumbing, fire protection, telecommunications, audio-visual and security infrastructure, equipment, and coordination of system furniture installation to ICD/ICS 705 standards within an occupied facility, with commissioning, BIM/COBie, quality control, safety, scheduling, and closeout requirements.
We post new general contractors opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"01_Solicitation Department Of Energy - National Nuclear Security Administration Joint Cyber Facility.pdf"633534"file"".pdf""1""2026-11-02T23:44:25.915+00:00""d648e82f6c044051825f30762cbebdd4""public""0""public""ed1dafd231cf4b3f84fdfe9dad6530d5""0"740"0""02_47PB5427R0003.pdf"1338220"file"".pdf""1""2026-11-02T23:44:25.915+00:00""8f86200b9c594f07849c5203cd89d604""public""0""public""e59224b02863437a824218fed4327676""0"738"0""03_Draft Agreement.docx"56263"file"".docx""1""2026-11-02T23:44:25.915+00:00""bdd270c8d11b4fdf86e04297f86f6432""public""0""public""25a7d14828b1494ebf6944ef64b52d73""0"733"0""04_CUI Building Information Request Form.pdf"93203"file"".pdf""1""2026-11-02T23:44:25.915+00:00""24150f4456c24856a7ea2c1a2f7a460f""public""0""public""741cf7b7e8444acaa7d34408002e598e""0"665"0""05_Sample Proprietary Information Agreement.docx"8555"file"".docx""1""2026-11-02T23:44:25.915+00:00""743d85ae654245b7a343fed6164e3e3e""public""0""public""6e5cd22bcd6b49e692c78a2a86a59f87""0"652"0""06_Department Of Energy - National Nuclear Security Administration Joint Cyber Facility SOW_20261029.pdf"637870"file"".pdf""1""2026-11-02T23:44:25.915+00:00""ec4478977bcd484bbe179572e5737347""public""0""public""12fcd2ebe3864ef080d0a8bcab4d3a7f""0"620"0""07_Price Proposal Form.xlsx"119969"file"".xlsx""1""2026-11-02T23:44:25.915+00:00""624ff3bbeac041a68f8560a25be982a8""public""0""public""4b6390543f5b43e48a782bf2f3d35ec3""0"557"0""Wage Determination Davis-Bacon Act WD CO20260023.pdf"41452"file"".pdf""1""2026-11-02T23:44:25.915+00:00""f4aae8d62cff48468ccaee8f10727dd8""public""0""public""49ac6216f6cd41e6840e3e45b8850c89""0"545"0""06.1_1_DOE NNSA JCF_Narrative Memo_20261023.pdf"2323290"file"".pdf""1""2026-11-02T23:44:25.915+00:00""6eadcfdb64d44b6c971bae1793fe6fa6""private""0""controlled""ed84d3ec0a6440a6ac7082debc9e27bd""1"516"0""06.1_2_DOE NNSA JCF_CD-100% IFC Combined Set_20261023_.pdf"109841070"file"".pdf""1""2026-11-02T23:44:25.915+00:00""7352e4dded9c4b9fa1ba8470f12503ff""private""0""controlled""7f789a34dbf7499abd553dca770bfe74""1"477"0""06.1_3_DOE NNSA JCF_Project Manual Volume 1_20261023.pdf"12353725"file"".pdf""1""2026-11-02T23:44:25.915+00:00""b8c2c10de617438e88c6317f9fb15c76""private""0""controlled""2ba0f1840dcc40d1b8a8aa3647d8c769""1"452"0""06.1_4_DOE NNSA JCF_Project Manual Volume 2_20261023.pdf"9492753"file"".pdf""1""2026-11-02T23:44:25.915+00:00""def9e9abfa0849a38496a8f69338936e""private""0""controlled""ba729fae634c47b98fb221cd27a1a5ae""1"441"0""06.1_5_DOE NNSA JCF_APPENDIX A - BUILDING 810 SOUTHWATCH.pdf"1711935"file"".pdf""1""2026-11-02T23:44:25.915+00:00""364d9aa544da46db87d7ef88ed22c088""private""0""controlled""79df9f91d16c424e8e41a5198ae5d787""1"405"0""06.1_6_DOE NNSA JCF_APPENDIX B - Graphics_Signage_CD-100 IFC.pdf"9543717"file"".pdf""1""2026-11-02T23:44:25.915+00:00""974b1b9e825945c09029d912b7c647da""private""0""controlled""ac2cbc4c4bec49739fa9478a1432fbfc""1"388"0""06.1_7_DOE NNSA JCF_APPENDIX C - ARCH-03GSAA-IA_LIGHTING CALCULATION REPORT_20261023.pdf"823440"file"".pdf""1""2026-11-02T23:44:25.915+00:00""05e2fb87c1a444e583ac639571901e96""private""0""controlled""761a4787b4514e9bbbd37ccab2b58a34""1"345"0""06.1_8_DOE NNSA JCF_APPENDIX D - FP Calculations_CD-100 IFC_20261023.pdf"1713578"file"".pdf""1""2026-11-02T23:44:25.915+00:00""ad954e6cbe5641bd83668d3f5184b712""private""0""controlled""49beee3520d84964b8a0e71b6818fbd4""1"332"0""06.1_9_APPENDIX E - Mechanical Calculations_CD-100 IFC_20261023.pdf"326075"file"".pdf""1""2026-11-02T23:44:25.915+00:00""09b0a45050ba4e1fb2309dbfab4ae44a""private""0""controlled""2184ffae766e47fa9c8f5610f108b079""1"280"0""06.1_10_DOE NNSA JCF_Final Existing Conditions Survey_Hazardous Materials Survey_260723.pdf"77380323"file"".pdf""1""2026-11-02T23:44:25.915+00:00""4ba73df8861d407482b24998e74e830a""private""0""controlled""2ab32a84d82e43dfa56682cc2073a5fb""1"269"0""06.1_11_DOE NNSA JCF_BIM Execution Plan BEP & COBIE Integrated Design Process IDP_20.xlsx"48322"file"".xlsx""1""2026-11-02T23:44:25.915+00:00""ca2159459692488a8ba909b582af3b00""private""0""controlled""4b1fe9e87d8a48cf8077c6779a9c279c""1"258"0""06.1_12_DOE NNSA JCF_COBie Spreadsheet_IA & CMTA_20261023.xlsx"1553055"file"".xlsx""1""2026-11-02T23:44:25.915+00:00""115102ae67a44b48ad217a83cbbd59e6""private""0""controlled""8cd839c79a3246618183c83f4df82658""1"226"0""06.2_1_ICD-ICS-705_v1.5.1_20210726.pdf"1858757"file"".pdf""1""2026-11-02T23:44:25.915+00:00""bbd4c3073c4446b29421c7318184d265""private""0""controlled""6aac4b5763b448e3a083f400368b54b6""1"213"0""06.2_2_ICS-705-1_Construction Security Plan (CSP)_20261026.pdf"188669"file"".pdf""1""2026-11-02T23:44:25.915+00:00""ba97e9984d3649f8bc9d20f26ec2b45a""private""0""controlled""66284645736541b59103ca86d13407ae""1"196"0""06.2_3_Watch Floor Furniture Design_Rev D_20260617.pdf"4925803"file"".pdf""1""2026-11-02T23:44:25.915+00:00""74f8f8582ed94011ae238d75148ef458""private""0""controlled""fd92eb863087495b8876683408c5a594""1"182"0""06.2_3a_Watch Floor Furniture Power Whip_PowerLinc Brochure 2024-LR.pdf"970235"file"".pdf""1""2026-11-02T23:44:25.915+00:00""fdeae8e9c7ec40de8fc01bc7a97152bb""private""0""controlled""8d1f92f79f71479f8a285a251b4e4128""1"153"0""06.2_4_Watch Floor_Planar Video Wall Design_20260806.pdf"1088446"file"".pdf""1""2026-11-02T23:44:25.915+00:00""93828a60aeae49c3947b8b1cada2d579""private""0""controlled""cf3d2b6ae71d417fbff3b479b4ae99be""1"152"0""06.2_5_Conference Rooms_GDIT AV Design_Rev 7_20261023.pdf"2217154"file"".pdf""1""2026-11-02T23:44:25.915+00:00""6bc2cd0553984bc4967cab1ef6f708b9""private""0""controlled""f7e25ad086a5498ab613ff611f143d87""1"131"0""06.3_1_Commissioning Plan_20261023.pdf"2516768"file"".pdf""1""2026-11-02T23:44:25.915+00:00""b14615f1f1eb4bf78c9cfd3419e46851""private""0""controlled""1f722e3070c94d13a9b9e2853b45ba1f""1"116"0""06.3_2_Owners Project Requirements_20261027.pdf"284619"file"".pdf""1""2026-11-02T23:44:25.915+00:00""e7bd905dd1334360b4cf9a6c611171f6""private""0""controlled""12d307c7203f47abae4303ed124f3022""1"102"0""06.3_3_FFE Responsibility Matrix_20261027.pdf"482714"file"".pdf""1""2026-11-02T23:44:25.915+00:00""ae8b87e573914355adc0c2dd9a0223c8""private""0""controlled""7e882f4ab1fc46aeb2c867708b3fcea1""1"89"0""06.3_4_Site Logistics Plan_20261028.pdf"4612049"file"".pdf""1""2026-11-02T23:44:25.915+00:00""2bdb26cd5a8547749988aa22a877b4e9""private""0""controlled""98473fd62a9f4183bac6fd10c92ec6ca""1"77"0""06.4_1_GSA BIM, CDX & COBie Standard_v2025.1.pdf"4390775"file"".pdf""1""2026-11-02T23:44:25.915+00:00""4e0d71ec588047aca4a4333af88bba40""private""0""controlled""773fa9b1b4294e13b7d28c490143c3bc""1"75"0""06.4_2_ CDX Implementation Guide_V2025.1.pdf"6097991"file"".pdf""1""2026-11-02T23:44:25.915+00:00""ea27af426cf04d07b300fa1099ce87a7""private""0""controlled""097bbc68c582407e937ebf9ef8a24976""1"55"0""06.4_3_DOE NNSA JCF_Security ROCAL_YYYYMMDD.xlsx"27495"file"".xlsx""1""2026-11-02T23:44:25.915+00:00""2016df248fc245cc9a056a8d5509c1f7""private""0""controlled""2ab1ad5a2ae2491d8fd43bc19b2d8280""1"46"0""06.4_4_CD_Waste_Management_Plan__Reporting_Template.xlsx"366393"file"".xlsx""1""2026-11-02T23:44:25.915+00:00""806d12fb3ce8459ca58a43a58dbcb4b8""private""0""controlled""36ae655004af495baeb289075ac313a0""1"45"0""06.4_5_NDA_Document_Security.pdf"109660"file"".pdf""1""2026-11-02T23:44:25.915+00:00""46655f259fa64610a215a9172df3b3a6""private""0""controlled""4d34448887424ed590468c028b03dc08""1"43"0""06.4_6_GSA Data Normalization for Building Automation Systems_v25.pdf"1629134"file"".pdf""1""2026-11-02T23:44:25.915+00:00""50ec51bf66d1490d9dabbc5332c621f5""private""0""controlled""825fa9e73cf64f9bbb3f62cab4710409""1"42"0""06.4_7_2022-0017-Niagara-Information-and-Conformation-Statement-NICS.pdf"859901"file"".pdf""1""2026-11-02T23:44:25.915+00:00""793dac41dc3744f6a20499d5c3ccb2db""private""0""controlled""9f973dd086d74ef49291dcfbd215e123""1"40"0""06.4_8_BAS Graphic Guideline Rev A.pdf"146940"file"".pdf""1""2026-11-02T23:44:25.915+00:00""edd748f727b84d1fbe821d8a18fe7125""private""0""controlled""e026e5d734a04e3b9d18fecf5739692c""1"37"0""06.4_9_FPS_Escort-After-Hours-Form_20260430.pdf"337694"file"".pdf""1""2026-11-02T23:44:25.915+00:00""d140e66a2a294d4fa4833b5e0b22487c""private""0""controlled""7638414ff04d43c69a12991713ab69f7""1"36"0""https://forms.gle/9fbwYr6X81t4CqXe6""Department Of Energy - National Nuclear Security Administration Joint Cyber Facility, Past Performance Questionnaire Google Form [GC]"0"link""1""2026-11-02T23:44:25.915+00:00""cea45c697b2942dcbccdb27a2dfd0b45""public""0""Department Of Energy - National Nuclear Security Administration Joint Cyber Facility, Past Performance Questionnaire Google Form [GC]""public""20ca85b619e74c1fabd690d18aa8a53a""0"2"0""https://forms.gle/vnfSewXzraLFHkKV9""Pre-Proposal Conference / Site Visit"0"link""1""2026-11-02T23:44:25.915+00:00""b16de559f225419eb6dbdb2f59851214""public""0""Pre-Proposal Conference / Site Visit""public""a96bf71ba9024806aa7ab0ad390a6fe4""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e87be19f02de482e99c7ad4ca3402fa8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.