BRIDGE AND APPROACHES
COUNTY ROAD (EW 15): OVER OSAGE CREEK,
2.75 MILES WEST OF THE US-81 JUNCTION NEAR MEDFORD.
PROJECT LENGTH = 0.321 MILES
Work includes roadway clearing and grubbing, unclassified excavation and borrow, salvaged topsoil, silt fence and dike, solid slab sodding, vegetative mulching, aggregate base Type A, Class C concrete, 18-inch corrugated steel pipe and culvert end sections, removal of structures, and guardrail anchor units; bridge substructure excavation, granular backfill, concrete rail, structural steel, weathering steel fixed and expansion bearings, Class AA and Class A concrete, reinforcing steel, HP piles, 48-inch drilled shafts, elastomeric coating, sealed expansion joints, haul and erect steel beams, riprap and underdrains; plus signs, barricades and warning lights, construction staking, SWPPP documentation and management, and mobilization.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260291), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.