BRIDGE REHABILITATION
I-40: OVER LITTLE SKIN BAYOU CREEK, 3.3 MILES
WEST OF OLD US-64 NEAR MULDROW.
PROJECT LENGTH = 0.056 MILES
The work includes roadway items such as clearing and grubbing, unclassified excavation, salvaged topsoil, temporary silt fence, temporary silt dike, temporary inlet sediment filter, solid slab sodding, vegetative mulching, mowing, aggregate base type A, woven geosynthetic reinforcement fabric, traffic bound surface course type E, tack coat, prime coat, Superpave asphalt, dowel jointed PCC pavement, PC concrete for pavement, class C concrete, inlets, RCP pipe, prefabricated culvert end section, PVC pipe, removal of structures and obstructions, removal of concrete and asphalt pavement, removal of guardrail, removal of existing pipe, sawing pavement, guardrail curbing, beam guardrail, guardrail end treatment, and guardrail bridge connection. Bridge A and Bridge B each include structural excavation, CLSM backfill, approach slab, saw-cut grooving, 42" F-shaped parapet, structural steel, stainless steel fixed and expansion bearing assemblies, class AA and class C concrete, epoxy coated reinforcing steel, water repellent, elastomeric coating, sealed expansion joints, crack preparation and epoxy resin, pneumatically placed mortar, sealer crack preparation and sealer resin, carbon fiber-reinforced polymer, corrosion inhibitor, and removal of bridge items. Traffic signing and striping includes rumble strip, remove and reset existing signs, and traffic stripe. Traffic barriers include class AA concrete, removal of cable barrier, installation of cable barrier system, and end anchors. Traffic control includes construction traffic stripe, pavement marking removal, construction zone impact attenuator, delivery and relocation of portable longitudinal barrier, arrow display, construction signs, construction barricades, warning lights, drums, channelizer cones, and portable changeable message sign. Staking includes construction staking level II. Construction items include SWPPP documentation and management and mobilization.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260298), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.