BRIDGE AND APPROACHES
COUNTY ROAD (EW-094): OVER CROOKED CREEK, 7 MILES
EAST OF THE SH-34 JUNCTION NEAR BUTLER.
PROJECT LENGTH = 0.217 MILES
Work includes roadway items such as clearing and grubbing, earthwork, temporary silt fence and dike, solid slab sodding, vegetative mulching, traffic bound surface course Type E, Class C concrete, reinforced concrete pipe arch and corrugated galvanized steel pipe arch with Type B3 and C3 culvert end treatments, and fencing; bridge items such as substructure excavation, unclassified backfill, concrete rail TR4, structural steel and reinforcing steel, painting existing structures with collection and handling of waste, HP 10x42 furnished and driven piles, furnished and driven sheet piling, haul and erect steel beams, plain riprap with filter blanket, removal of existing bridge structure, and guardrail anchor units Type II; traffic items including construction signs, barricades and warning lights; plus Level II construction staking and mobilization.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260290), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.