BRIDGE AND APPROACHES
SH-142: OVER THE BNSF RAILROAD, 0.5 MILES NORTH
OF THE SH-199 INTERSECTION IN THE CITY OF ARDMORE.
PROJECT LENGTH = 0.306 MILES
The project covers 0.306 miles and includes removal of the existing bridge structure, new drilled shaft foundations and H-pile driving, structural steel superstructure, Class AA and Class A concrete placement, approach slabs, parapets, and slope wall, along with roadway grading, aggregate base and Superpave asphalt paving, cold milling, culvert and underdrain installation, guardrail and fencing installation, erosion and sediment control measures, and traffic control including portable signals, signage, striping, and flagging during construction.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260288), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.