(1): Job JCD0137 Route 240 HOWARD County. Bridge replacement over Salt Creek near Fayette, the total length of improvement being 0.095 miles.
(2): Job JCD0165 Route W HOWARD County. Scour repair at Dry Creek near Fayette, the total length of improvement being 0.004 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes Job JCD0137 bridge replacement over Salt Creek for 0.095 miles including roadway excavation, optional pavement, rock blanket, MGS guardrail, new Bridge A9370 with galvanized steel piles, substructure concrete, structural steel, slab on steel and Type D barrier, and Job JCD0165 scour repair at Dry Creek for 0.004 miles including excavation, rock blanket, temporary traffic control, mobilization, seeding and erosion control, with detour traffic handling and lump sum temporary traffic control.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-D04), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.