(1): Job JSE0107 Route ZZ NEW MADRID County. Bridge replacement over Drainage Ditch No. 52 north of Portageville, the total length of improvement being 0.125 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
The work replaces existing WF Girder Bridge T0783 with a 16-foot by 8-foot concrete box culvert at Station 15+37.70, including roadway grading, 7-inch optional pavement with aggregate base, rock ditch liner and rock blanket, 24-inch and 36-inch Group B pipe culverts with 24-inch and 36-inch flap gates, construction signing, pavement marking removal and marking, seeding and mulching, temporary erosion control, dewatering, traffic control with bridge closure and detour, and stormwater and quality-control compliance.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-H06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.