(1): Job JCD0258 Route B COLE County. Bridge rehabilitation over the Osage River south of Wardsville, the total length of improvement being 0.212 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes removal of existing expansion joint seals and bearings, installation of Type N PTFE bearings and strip seal joints, epoxy polymer wearing surface, substructure repair, girder strengthening with cover plates, cleaning and recoating of structural steel and bearings, epoxy protective coating of bents and piers, expansion device drainage troughs, and roadway items including work zone traffic control, pavement marking and mobilization.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-D07), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.