(1): Job JSE0036 Route M MADISON County. Bridge Replacement over Shetley Creek northeast of Buckhorn, the total length of improvement being 0.17 miles.
(2): Job JSE0037 Route M MADISON County. Bridge replacement over Big Creek northeast of Buckhorn, the total length of improvement being 0.2 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
For JSE0036 replace the Route M bridge over Shetley Creek and for JSE0037 replace the Route M bridge over Big Creek, including removal of existing bridges, earthwork, aggregate base and optional pavement, drainage pipes and flared end sections, rock blanket, guardrail and end terminals, signing, pavement marking, erosion control, bridge piling, concrete substructure, prestressed concrete beams/girders, barriers, approach slabs, drains and bearings, with combination bids and staged construction so both bridges are not closed simultaneously.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-H05), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.