(1): Job JSR0138 Route N POLK County. Bridge replacement over Sadler Branch, the total length of improvement being 0.161 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes bridge replacement over Sadler Branch, with provisions to minimize traffic interference, prevent debris from falling into the waterway, and prevent damage to existing utilities. The bridge closure must be scheduled for the absolute minimum time, and material must be available for continuous construction before closure.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Missouri work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-G07), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.