SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS (ITD Major highways project, Key No. 25120).
Location: Boise County, Idaho (ITD District 3). Funding: State.
Bid opening: November 17, 2026.
The work includes partnering, removal of sign assemblies, sign faces, bituminous surface, pavement markings; excavation, borrow, shoulder aggregate; fiber wattle, inlet protection; aggregate base, tack coat, miscellaneous pavement; 18-inch storm sewer pipe, minor structures; sidewalk, driveway, curb ramp, curb and gutter; signs (Type B-1, Type E), steel and wood sign posts, reinstall sign faces, special install signs; mileposts; illumination; long pavement marking (waterborne); subgrade separation geotextile; signal housing, electrical service pedestal, intersection signal structure, pedestrian system, signal cabinet, pedestrian and traffic control signal head frangible poles, combined cabinet and service pedestal foundation, additional electrical items; temporary traffic control; drain rock; and mobilization.
We post new excavating opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Idaho Transportation Department (solicitation 25120), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.