In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 19,861 total cubic yards of earthwork, 835 linear feet of pipe installation, 29 tons of riprap, installation of a Modified SW-513 concrete outlet structure, lift station consisting of a SW-401 concrete structure, solar pump system and 2.4 acres of seeding.
The estimated construction cost range for this project is $150,000 to $250,000. Completion Dates: Construction September 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications)
We post new plumbing opportunities in Iowa as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Iowa DAS Procurement (bid 26-10 Car833409A (Carroll) Wetland), retrieved via Iowa Department of Administrative Services. View the official posting, and always confirm requirements and deadlines with the issuing agency.