4 miles of patching, resurfacing, concrete curb and gutter installation, storm sewer, culvert extensions, earthwork, and drainage improvements on IL 104 from 0.8 miles southwest of CH 1 (Woodson/Franklin Road) to 0.7 miles west of IL 111.
Item: 099
Contract: 72K00
Region/District: 4 / 6
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STPNDFU(489)
Key Routes: FAP 753
Marked Routes: IL 104
Sections: 128RS-5,CLV
State Jobs: C-96-064-17
Contract specifics:
The work includes 4 miles of patching, resurfacing, concrete curb and gutter installation, storm sewer, culvert extensions, earthwork, and drainage improvements on IL 104 from 0.8 miles southwest of CH 1 (Woodson/Franklin Road) to 0.7 miles west of IL 111. Specific pay items include tree removal, earth excavation, trench backfill, topsoil furnish and place, grading and shaping ditches, seeding, fertilization, mulching, erosion control, aggregate subgrade improvement, Portland cement concrete base course widening, hot-mix asphalt base and surface courses, pavement removal, driveway pavement removal, gutter removal, pavement patching, aggregate shoulders, hot-mix asphalt shoulders, concrete removal, pipe culvert removal, structure excavation, reinforcement bars, box culvert end sections, concrete box culverts, precast concrete box culverts, precast reinforced concrete flared end sections, reinforced concrete pipe tee, concrete collar, pipe culverts, storm sewers, storm sewer removal, geocomposite wall drain, concrete headwalls, pipe underdrains, manholes, inlets, median inlets, removing inlets, combination concrete curb and gutter, steel plate beam guardrail, long-span guardrail, traffic barrier terminals, guardrail removal, sinusoidal rumble strips, furnishing and erecting right of way markers, engineer's field office, mobilization, traffic control and protection, temporary bridge traffic signals, temporary rumble strips, changeable message sign, short term pavement marking, short term pavement marking removal, remove sign panel assembly, remove sign panel, relocate sign panel assembly, relocate sign panel, terminal marker, telescoping steel sign support, modified urethane pavement marking, raised reflective pavement marker, guardrail reflectors, raised reflective pavement marker removal, pavement marking removal - grinding, tree removal (acres), riprap slurry, temporary access (private entrance), temporary access (field entrance), granular culvert backfill, membrane waterproofing system for buried structures, plug existing pipe, filling existing culverts, class SI concrete (outlet), concrete gutter type A, woven wire fence removal, traffic control and protection (special), traffic control and protection standard BLR 21, width restriction signing, construction layout, trainees, and trainees training program graduate.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 72K00), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.