For constructing the Bridge Replacement (Resurfacing, Grading, Drainage, Pavement, and Bridge) on SR-6 (Eastbound Roadway) from a point 0.200 mile east of the junction of Hargrove Church Road (MP 23.797) over Bear Creek northwest of Gordo. Length 0.801 mi.
County: Pickens County, Alabama
Contract Time: 150 Working Days
Bracket Estimate: $4,816,800 to $5,887,200
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
For constructing the Bridge Replacement (Resurfacing, Grading, Drainage, Pavement, and Bridge) on SR-6 (Eastbound Roadway) from a point 0.200 mile east of the junction of Hargrove Church Road (MP 23.797) over Bear Creek northwest of Gordo. Length 0.801 mi. The principal items of work include clearing and grubbing, removal of old bridge, removing concrete slope paving, removing pipe, removing guardrail, removing headwalls, unclassified excavation, borrow excavation, roadbed stabilizing material, geosynthetic reinforcement, crushed aggregate base courses, permeable asphalt treated base, bituminous treatments, planing existing pavement, superpave bituminous concrete layers, reinforced cement concrete bridge end slab, steel reinforcement, steel test piles, dynamic loading tests, steel piling, structural steel, bridge substructure and superstructure concrete, grooving concrete bridge decks, bridge barrier rail, elastomeric bearings, pretensioned-prestressed concrete girders, roadway pipe, mobilization, pavement edge drain, underdrain pipe, loose riprap, filter blanket, slope paving, side drain pipe end treatment, minor structure concrete, inlets, steel beam guardrail, guardrail end anchors, topsoil, seeding, solid sodding, mulching, erosion control products, temporary seeding and mulching, polyethylene, sand bags, temporary riprap, silt fence, temporary coarse aggregate, inlet protection, wattle, pest control treatment, geometric controls, construction fuel, traffic stripes, traffic control markings, pavement markers, truck mounted impact attenuator units, construction signs, channelizing drums, barricades, portable sequential arrow and chevron sign units, and portable changeable message signs.
We post new asphalt opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261106-CALL001), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.