Pre-Solicitation - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation Completion Days: 365 Consecutive Calendar Days NAICS 237310 8(a) Competitive IFB The project includes, but is not limited to mobilization and demobilization; demolition to include removal of asphalt and concrete pavements, curbs and gutters, sidewalks and slabs, water main, valve and hydrant, storm sewer inlets, manholes and pipe, chain-link and ornamental fencing and gates, and flagpole; earthwork to include stripping, excavation, placement of backfill, compaction, and grading; water main and storm sewer work; aggregate work; asphalt paving; concrete paving, sidewalks, steps and light pole bases; installation of new metal handrail; installation of new ornamental fencing and electric pivot gate; electrical work to include installation of new conductors, new utility rack, new electric gate controls with keypad, intercom, camera and monitoring station, and new exterior pole lighting; installation of new pipe bollards;installation of new flag pole; pavement markings; damaged turf repair; seeding; and site restoration. ETA for IFB is within 30-60 days.
The project includes mobilization and demobilization; demolition to include removal of asphalt and concrete pavements, curbs and gutters, sidewalks and slabs, water main, valve and hydrant, storm sewer inlets, manholes and pipe, chain-link and ornamental fencing and gates, and flagpole; earthwork to include stripping, excavation, placement of backfill, compaction, and grading; water main and storm sewer work; aggregate work; asphalt paving; concrete paving, sidewalks, steps and light pole bases; installation of new metal handrail; installation of new ornamental fencing and electric pivot gate; electrical work to include installation of new conductors, new utility rack, new electric gate controls with keypad, intercom, camera and monitoring station, and new exterior pole lighting; installation of new pipe bollards; installation of new flag pole; pavement markings; damaged turf repair; seeding; and site restoration.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-5001""ROCK ISLAND""IL""USA""KO CONTRACTING DIVISION""1 ROCK ISLAND ARSENAL""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EK27BA003¬iceType=Presolicitation"0"link""1""2026-10-07T18:51:36.794+00:00""5e3839b83ca844bdad0a66c4af6887c6""public""0""PIEE Solicitation Module Link for W912EK27BA003""public""f7cc12820f6746eca96036e85c39092f""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-07T18:51:36.794+00:00""661658d55c2541a19fb07ec5130ee8b8""public""0""Web Based Training for the PIEE Solicitation Module""public""a842d738137d4843bbf6080b1d353c49""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-07T18:51:36.794+00:00""c828936206a24775ad30d5b52d98062b""public""0""Registration Instructions for the PIEE Solicitation Module""public""aa155ac3a02f4a01925eb7c69def0658""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-07T18:51:36.794+00:00""05c571a69b9f4358a0da2230f81fd7a6""public""0""Department of Defense Procurement Toolbox""public""82da17e355f7470eac205cefba48736e""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c45fd3f122574310b55bca1fb46014ff), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.