CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 51-0348-163 Letting Date: September 29, 2026
Call Order: 001
Proposal Work Type: PPCB REPAIR
DBE Goal: 0.0%
Contracting Authority: IOWA DEPARTMENT OF TRANSPORTATION
Proposal Guaranty: $4,000.00
This proposal includes the following project(s):
Project Number: NHSN-034-8(163)--2R-51 County: JEFFERSON
Project Work Type: PPCB REPAIR Route: U.S. 34
Location: Old US 34 Interchange 3.9 mi W of IA 1 (EB/WB)
Road System: PRIMARY ROAD (on NHS)
Federal Aid - Wages: Non-Federal Aid - Predetermined Wages are not in Effect
Contracts and Specifications Bureau
9/1/2026 12:53 PM
Contract Time
Proposal ID: 51-0348-163 Call Order: 001 Letting Date: September 29, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 10/19/2026 10 WORK DAYS $1,000.00
.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
9/1/2026 12:53 PM
Proposal ID: 51-0348-163 Call Order: 001 Letting Date: September 29, 2026
Notes
Notes :
There are no notes for this proposal.
Contracts and Specifications Bureau
9/1/2026 12:53 PM
Proposal Specifications List
Proposal ID: 51-0348-163 Call Order: 001 Letting Date: September 29, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
500.11 *** EXPEDITE START OF WORK ***
Bid winner should be prepared to file the contract bond and certificate of insurance as
soon after the letting as possible to facilitate the starting of construction.
DS-23013 DEVELOPMENTAL SPECIFICATIONS FOR FIBER REINFORCED POLYMER
REPAIR FOR CONCRETE CONTAINMENT OF COLLISION DAMAGED
PRETENSIONED PRESTRESSED CONCRETE BEAMS
GS-23006 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION
Contracts and Specifications Bureau
9/1/2026 12:53 PM
Proposal Schedule of Items
Proposal ID: 51-0348-163 Call Order: 001 Letting Date: September 29, 2026
SECTION: 0001
DESIGN NO. 0127 REPAIRS TO A 228'-0 X 40'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2426-6772010
BEAM REPAIR, AS PER PLAN LUMP SUM LUMP SUM _________._____
0020 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
Section: 0001 Total: _________._____
SECTION: 0002
DESIGN NO. 0127 REPAIRS TO A 228'-0 X 40'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0030 2426-6772010
BEAM REPAIR, AS PER PLAN LUMP SUM LUMP SUM _________._____
0040 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
Section: 0002 Total: _________._____
SECTION: 0003
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0050 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0060 2528-8445113 10.000
FLAGGERS EACH 660.00000 6,600.00
Section: 0003 Total: _________._____
Total Bid: _________._____
DS-23013
(New)
DEVELOPMENTAL SPECIFICATIONS
FOR
FIBER REINFORCED POLYMER REPAIR FOR CONCRETE CONTAINMENT OF COLLISION
DAMAGED PRETENSIONED PRESTRESSED CONCRETE BEAMS
Effective Date
October 17, 2023
THE STANDARD SPECIFICATIONS, SERIES OF 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23013.01 DESCRIPTION.
These specifications describe a Fiber Reinforced Polymer (FRP) repair system which comprises the:
• Materials system specified, including the fiber material, physical form of the fiber material, resin,
primer, and adhesive as applicable,
• Installation process,
• System manufacturer,
• Supplier, and
• Installer.
23013.02 MATERIALS.
A. Comply with the following requirements:
Table DS-23013.02-1: Tests and Requirements for FRP Laminate Systems
PROPERTIES AT 72°F ± 2°F MINIMUM VALUES ASTM TEST
METHOD
Ultimate Tensile Strength in Primary Fiber Direction 500 pounds per inch of width D 3039
Ultimate Tensile Strength at 90 degrees to Primary
Fibers 500 pounds per inch of width D 3039
Tensile Modulus of Elasticity 2000 ksi D 3039
B. FRP Laminate Systems shall be in accordance with Materials I.M. 491.25, Appendix A.
C. Store and handle materials according to the manufacturer’s recommendations, except as
modified by this specification. Protect materials from dirt, moisture, chemicals, extreme
temperatures, and physical damage. Do not use components exceeding their shelf life. In case of
conflict between manufacturer’s recommendations and the requirements listed in this
specification, the Engineer will determine which governs.
DS-23013, Page 2 of 4
23013.03 CONSTRUCTION.
A. Surface Preparation.
1. Ensure that, where shown on the plans, corners are rounded and smoothed to a surface
finish in compliance with these specifications prior to the application of fibers. Surface finish
consists of finishing the surfaces of the structure to produce smooth even surfaces of uniform
texture and appearance that are free of unsightly bulges, depressions, and other
imperfections. Use power sanders or other approved abrasive means to achieve a smooth
even surface of uniform texture and appearance. Repair defects in the base concrete, such
as spalls, chips, and hollow areas as shown in the contract documents.
2. Ensure surfaces to receive FRP laminate are free from fins, sharp edges, and protrusions
that will cause voids or depressions behind or within the installed FRP laminate, or that in the
opinion of the Engineer will damage the fibers. Voids or depressions are defined as volumes
greater than 0.5 inch in diameter by 0.125 inches deep. Fill existing uneven surfaces to
receive FRP laminate, including voids or depressions, with an FRP system compatible epoxy
or epoxy-based filler.
B. Application Conditions.
1. Ensure the contact surfaces at any stage of installation are completely dry and free of dust
and other contaminants at the time of application of the FRP laminate. Mix and apply the
epoxy resin components only when their temperatures and the ambient temperature are
between 45ºF and 95ºF. Apply the FRP laminate when the relative humidity is less than 90%
at the site and the surface temperature is more than 5ºF above dew point.
2. Replace or repair FRP laminate damage caused by the elements at no additional cost to the
Contracting Authority.
3. With the Engineer’s written approval, the Contractor may provide suitable enclosures to
permit application and curing of the FRP laminate during inclement weather. Control
atmospheric conditions artificially inside the enclosures within limits specified for application
and curing of the FRP laminate.
4. During application of the FRP system, maintain a Daily Installation Log. Make this log
available to the Engineer for review. Provide the Engineer a copy at the completion of each
day's work. In the log provide materials certification data and application records for each
installation. Include, at a minimum, the following information:
a. Installation identification with beam number, construction and installation requirements,
including plans and drawings, or references thereto.
b. Materials information including product description, date of manufacture, and lot or batch
numbers.
c. Fabrication, inspection, and verification data for the manufacturing and construction
operations including:
• A list of materials and quantities used during each work shift.
• Number of layer counts.
• FRP laminate thickness measurements.
• Installation time per beam.
• Ambient temperature and humidity readings at beginning, middle, and end of each
work shift.
• Curing processes including full documentation of time and temperature relationship
for curing and at final curing temperature.
• Thickness measurements of any protective coating applied to the completed FRP
laminate following installation.
DS-23013, Page 3 of 4
C. Application of System.
1. Use automated equipment to proportion and thoroughly mix the components of epoxy resin to
within 5% of the specified mix ratio. Check the accuracy of proportions and mixing.
2. Apply the resin within one hour after a batch has been mixed, or as recommended by the
FRP manufacturer. Measure and uniformly apply both epoxy resin and fiber sheet at the rates
shown on the approved working drawings.
3. Apply the fiber sheet to the surface using methods that produce a uniform tensile force
distributed across the entire width of fiber sheet.
4. Place successive layers of FRP laminate materials before complete cure of the previous layer
of epoxy to achieve complete bond between layers. After seven calendar days, or complete
cure, a light surface sand blasting, cleaning with fresh water, and drying is required prior to
placing additional layers.
5. Maintain an epoxy application rate for each layer of FRP laminate such that the fiber sheet is
completely saturated.
6. Undulations in the surfaces are not to exceed 0.25 inches per foot in any direction. The cured
FRP laminate is to have a uniform thickness, density, and bond between layers and to lack
porosity.
7. Except as specified otherwise, roll or squeegee out entrapped air beneath each layer before
the epoxy sets. Firmly bed and adhere each individual layer and ending of the FRP laminate
to the preceding layer.
8. An overlap length of 4 inches or that recommended by the FRP manufacturer is required for
splices in the fiber direction of individual layers. No horizontal overlap is required when
placing parallel sheets.
9. Ensure the cured FRP laminate system has uniform thickness, density, and bond between
layers. Protect the system from exposure to rainfall or submersion for a period of at least 48
hours. Inspect the cured FRP systems for defects consisting of external abrasions or
blemishes, delaminations, voids, external cracks, chips, cuts, loose fibers, foreign inclusions,
depressible raised areas, or fabric wrinkles. Apply the following criteria:
• Each layer is to have full contact with the concrete surface or subsequent layers subject
to the following tolerances. Repair or replace all defects or voids with a dimension greater
than 1.5 inches, defect areas greater than 1 square inch, or defect areas with any
dimension greater than 1 inch within 1 foot from another defect area of similar size, as
determined by the Engineer.
• Surfaces of butted joints are to be flush with adjacent surfaces.
• Prior to preparing surfaces for painting, obtain the Engineer’s approval for all repairs
completed and cured.
D. Painting FRP Laminates.
1. Clean and paint exposed surfaces of FRP laminates according to this specification and the
FRP manufacturer’s recommendations.
2. Lightly roughen surfaces to be cleaned and painted by uniform abrasive blasting using an
abrasive no larger than 80 mesh. Do not allow the air pressure at the nozzle used for
abrasive blasting to exceed 80 psi. Use abrasive of appropriate hardness to roughen the
surface without damaging the fiber portion of the FRP laminate. Do not expose the fiber
portion of the FRP laminate by the abrasive blasting operation. Abrasive blasting will not be
DS-23013, Page 4 of 4
required if the first coat of paint is applied within 48 hours after mixing the components for the
final resin coating.
3. Remove dust and blast residue from all surfaces by flushing with clean water before painting.
4. Ensure all surfaces of the FRP laminate are completely dry before applying a minimum of two
finish coats of an exterior grade paint that is formulated to be system-compatible with the
FRP in compliance with the requirements in ASTM D 3359, Method A, with a minimum rating
of 4A.
5. Apply the first finish coat in a minimum of two applications. Verify the total dry film thickness
of all applications of the first finish coat is no less than 2 mils.
6. Successive applications of paint are to be of such a shade as to contrast with the paint being
covered.
7. Unless the Engineer approves otherwise, allow a minimum drying time of 12 hours between
finish coats.
8. The second finish coat color is to match Federal Standard 595B No. 26408. The total dry film
thickness of all applications of the second finish coat is to be no less than 2 mils.
9. Apply the two finish coats in three or more applications to a total dry film thickness of no less
than 4 mils or more than 8 mils.
23013.04 METHOD OF MEASUREMENT.
None.
23013.05 BASIS OF PAYMENT.
A. Payment for Beam Repair, as per plan, will be the lump sum contract price.
B. Payment is full compensation for furnishing all material, labor, and equipment required to
complete the work according to the contract documents.
- Package Files
- Name
- 29SEP001\Plan\51-0348-163\51-0348-163_C.pdf
- Bytes
- 37832983
- Name
- 29SEP001\Plan\51-0348-163\SRP\tc001.pdf
- Bytes
- 89076
- Name
- 29SEP001\Plan\51-0348-163\SRP\tc212.pdf
- Bytes
- 1244141
- Name
- 29SEP001\Plan\51-0348-163\SRP\tc402.pdf
- Bytes
- 151599
- Name
- 29SEP001\Prop\DS-23013.pdf
- Bytes
- 43205
- Name
- 29SEP001\Prop\estprop001.pdf
- Bytes
- 189231
- Package Pages
- 10
- Categorized By
- llm
- Package Scope Docs
- 2
- Package Manifest Only
- No