CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 02-0343-039 Letting Date: October 20, 2026
Call Order: 001
Proposal Work Type: BRIDGE REPLACEMENT - CCS
DBE Goal: 0.0%
Contracting Authority: IOWA DEPARTMENT OF TRANSPORTATION
Proposal Guaranty: $125,000.00
This proposal includes the following project(s):
Project Number: BRF-034-3(039)--38-02 County: ADAMS
Project Work Type: BRIDGE REPLACEMENT - CCS Route: U.S. 34
Location: Metz Creek 2.3 mi. W of W Jct. IA 25
Road System: PRIMARY ROAD (on NHS)
Federal Aid - Wages: Federal Aid - Predetermined Wages are in Effect
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Contract Time
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 04/19/2027 120 WORK DAYS $1,000.00
.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Notes
Notes :
There are no notes for this proposal.
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Specifications List
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Specifications List
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Note Description
005.1107.02 *** Revisions to Article 1107.02 ***
Article 1107.02, Insurance, is amended by the following modifications and additions.
This proposal note becomes null and void January 1, 2027.
A. It shall be the Contractor's responsibility to have liability insurance covering all
of the construction operations incident to contract completion and the Contractor must
have on file with the Contracting Authority a current "Certificate of Insurance" prior to
award of contract. The certificate shall identify the insurance company firm name and
address, Contractor firm name, policy period, type of policy, limits of coverage, and
scope of work covered (single contract or statewide). This requirement shall apply with
equal force, whether the work is performed by persons employed directly by the
Contractor including a subcontractor, persons employed by a subcontractor, or by an
independent contractor.
B. In addition to the above, the Contracting Authority shall be included as an
insured party, or a separate owner's protective policy shall be filed showing the
Contracting Authority as an insured party.
C. The liability insurance shall be written by an insurance company (or
companies) qualified to do business in Iowa. For independent contractors engaged
solely in the transportation of materials, the minimum coverage provided by such
insurance shall be not less than that required by Chapter 325A, Code of Iowa, for such
truck operators or contract carriers as defined therein. For all other contractors,
subcontractors, independent contractors, and the Contracting Authority, the minimum
coverage by such insurance shall be as follows:
General Liability, Including: BODILY INJURY
Independent Contractors $500,000 Each Occurrence
Contractual Liability, $500,000 Aggregate
Products and Completed PROPERTY DAMAGE
Operations $250,000 Each Occurrence
$250,000 Aggregate
or
BODILY INJURY AND PROPERTY DAMAGE
- COMBINED SINGLE LIMIT*
$750,000 Each Occurrence
$750,000 Aggregate
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Specifications List
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Note Description
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
D. Failure on the part of the Contractor to comply with the requirements of this
article will be considered sufficient cause to suspend the work, withhold estimates, and
to deny the Contractor from receiving further contract awards, as provided in Article
1103.01.
410.11 *** STORM WATER POLLUTION PREVENTION PLAN ***
A Storm Water Pollution Prevention Plan has been developed by the Contracting
Authority for one or more projects on this contract. See the project plans (or other
contract document) for specific Storm Water Pollution Prevention Plan details.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
720.121 *** POINT 25 Utility Data ***
This Estimating Proposal has an attachment of the "POINT 25 Utility Data". This
attachment is a part of the proposal form.
DS-23011 DEVELOPMENTAL SPECIFICATIONS FOR FLOATING SILT CURTAIN
DS-23032 DEVELOPMENTAL SPECIFICATIONS FOR ELECTRONIC TICKETING
DS-23083 DEVELOPMENTAL SPECIFICATIONS FOR FIBER REINFORCEMENT FOR
STRUCTURAL CONCRETE
FHWA-1273.09 FHWA-1273: REQUIRED CONTRACT PROVISIONS FEDERAL-AID
CONSTRUCTION CONTRACTS -- REVISED OCTOBER 23, 2023
23 U.S.C. 133(i) requires application of Davis Bacon predetermined wages on certain
projects on roads functionally classified as a local road or a rural minor collector. This
supersedes the applicability described in FHWA-1273 Section IV.
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Specifications List
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Note Description
GS-23007 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION, OCTOBER 20, 2026 RELEASE
IA26-28.4A PREDETERMINED WAGE RATE - GENERAL DECISION NUMBER IA20260028
FOR HEAVY AND HIGHWAY CONSTRUCTION -- STATEWIDE (EXCEPT SCOTT
COUNTY)
Note: The Contractor shall review the contract documents and
is responsible for identifying which zone(s), as defined
in the Predetermined Wage Rate specification, apply to
the work on the contract.
*** Additional Requirement ***
Contracts where the Department is the Contracting Authority:
The Prime Contractor and each approved Subcontractor shall submit certified payrolls
weekly to the Project Engineer. Each Contractor shall use the AASHTOWare Project
Civil Rights and Labor (AWP CRL) software to electronically submit Certified Payroll
Reports. The Contractor shall list the craft for each employee covered by the
Predetermined Wage Rates. The Prime Contractor shall review and approve each
Subcontractor’s payroll within AWP CRL.
Contracts where the Department is not the Contracting Authority:
The Prime Contractor shall submit certified payrolls for itself and each approved
Subcontractor weekly to the Project Engineer. The Contractor may use the Iowa D.O.T.
Certified Payroll form or other approved form. The Contractor shall list the craft for
each employee covered by the Predetermined Wage Rates. The Prime Contractor
shall sign each of the Subcontractor's payrolls to acknowledge the submittal of the
Certified Payroll.
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0001
DESIGN NO. 0127; A 110'-0 X 44'-0 CONTINUOUS CONCRETE SLAB BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2104-2710020 788.800
EXCAVATION, CLASS 10, CHANNEL CY _________._____ _________._____
0020 2401-6745625
REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____
0030 2402-2720000 210.000
EXCAVATION, CLASS 20 CY _________._____ _________._____
0040 2402-2721000 109.000
EXCAVATION, CLASS 21 CY _________._____ _________._____
0050 2403-0100010 391.200
STRUCTURAL CONCRETE (BRIDGE) CY _________._____ _________._____
0060 2403-1000005 359.800
FIBER REINFORCEMENT FOR
STRUCTURAL CONCRETE
CY _________._____ _________._____
0070 2403-1000010
TRIAL BATCH AND TEST PLACEMENT
(FIBER REINFORCED CONCRETE)
LUMP SUM LUMP SUM _________._____
0080 2404-7775005 62,720.000
REINFORCING STEEL, EPOXY
COATED
LB _________._____ _________._____
0090 2404-7775009 23,288.000
REINFORCING STEEL, STAINLESS
STEEL
LB _________._____ _________._____
0100 2414-6424110 242.000
CONCRETE BARRIER RAILING LF _________._____ _________._____
0110 2501-0201042 1,050.000
PILES, STEEL, HP 10 X 42 LF _________._____ _________._____
0120 2501-0201253 1,705.000
PILES, STEEL, HP 12 X 53 LF _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0001
DESIGN NO. 0127; A 110'-0 X 44'-0 CONTINUOUS CONCRETE SLAB BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0130 2501-5478053 374.000
CONCRETE ENCASEMENT OF STEEL
H PILES, HP 12 X 53 (P10L TYPE 3)
LF _________._____ _________._____
0140 2501-8400172
TEMPORARY SHORING LUMP SUM LUMP SUM _________._____
0150 2507-2638650 12.600
BRIDGE WING ARMORING - EROSION
STONE
SY _________._____ _________._____
0160 2507-3250005 1,112.200
ENGINEERING FABRIC SY _________._____ _________._____
0170 2507-6800061 1,242.500
REVETMENT, CLASS E TON _________._____ _________._____
0180 2507-8029000 19.800
EROSION STONE TON _________._____ _________._____
0190 2526-8285040
CONSTRUCTION SURVEY, LOCATION
SURVEY
LUMP SUM LUMP SUM _________._____
0200 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
Section: 0001 Total: _________._____
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0002
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0210 2102-0425070 251.200
SPECIAL BACKFILL TON _________._____ _________._____
0220 2102-2625000 140.000
EMBANKMENT-IN-PLACE CY _________._____ _________._____
0230 2102-2710070 904.000
EXCAVATION, CLASS 10, ROADWAY
AND BORROW
CY _________._____ _________._____
0240 2105-8425015 841.000
TOPSOIL, STRIP, SALVAGE AND
SPREAD
CY _________._____ _________._____
0250 2107-0875100 833.000
COMPACTION WITH MOISTURE
CONTROL
CY _________._____ _________._____
0260 2115-0100000 423.000
MODIFIED SUBBASE CY _________._____ _________._____
0270 2122-5190009 94.900
PAVED SHOULDER, P.C. CONCRETE,
9 IN.
SY _________._____ _________._____
0280 2122-5190012 480.500
PAVED SHOULDER, P.C. CONCRETE,
12 IN.
SY _________._____ _________._____
0290 2123-7450000 13.400
SHOULDER CONSTRUCTION, EARTH STA _________._____ _________._____
0300 2301-0690205 727.700
BRIDGE APPROACH, BR-205 SY _________._____ _________._____
0310 2301-1033120 576.600
STANDARD OR SLIP FORM
PORTLAND CEMENT CONCRETE
PAVEMENT, CLASS C, CLASS 3
DURABILITY, 12 IN.
SY _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0002
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0320 2304-0100000 357.200
DETOUR PAVEMENT SY _________._____ _________._____
0330 2412-0000100 1,119.900
LONGITUDINAL GROOVING IN
CONCRETE, BRIDGE DECK AND/OR
APPROACHES
SY _________._____ _________._____
0340 2502-8212034 2,154.300
SUBDRAIN, LONGITUDINAL,
(SHOULDER) 4 IN. DIA.
LF _________._____ _________._____
0350 2502-8221306 16.000
SUBDRAIN OUTLET, DR-306 EACH _________._____ _________._____
0360 2503-0500402 2.000
BRIDGE END DRAIN, DR-402 EACH _________._____ _________._____
0370 2505-4008120 328.300
REMOVAL OF STEEL BEAM
GUARDRAIL
LF _________._____ _________._____
0380 2505-4008300 175.000
STEEL BEAM GUARDRAIL LF _________._____ _________._____
0390 2505-4008415 4.000
STEEL BEAM GUARDRAIL BARRIER
TRANSITION SECTION, BA-209
EACH _________._____ _________._____
0400 2505-4021010 4.000
STEEL BEAM GUARDRAIL END
ANCHOR, BOLTED
EACH _________._____ _________._____
0410 2505-4021720 4.000
STEEL BEAM GUARDRAIL TANGENT
END TERMINAL, BA-205
EACH _________._____ _________._____
0420 2510-6745850 2,249.800
REMOVAL OF PAVEMENT SY _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0002
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0430 2520-3350015 1.000
FIELD OFFICE EACH _________._____ _________._____
0440 2527-9263181 39.640
PAVEMENT MARKINGS REMOVED STA _________._____ _________._____
0450 2527-9263209 39.640
PAINTED PAVEMENT MARKINGS,
WATERBORNE OR SOLVENT-BASED
STA _________._____ _________._____
0460 2527-9263231 42.200
REMOVABLE TAPE MARKINGS, WET
RETROREFLECTIVE
STA _________._____ _________._____
0470 2527-9270112 26.990
GROOVES CUT FOR PAVEMENT
MARKINGS
STA _________._____ _________._____
0480 2528-8400048 1,276.200
TEMPORARY BARRIER RAIL,
CONCRETE
LF _________._____ _________._____
0490 2528-8400256 1.000
TEMPORARY TRAFFIC SIGNALS EACH _________._____ _________._____
0500 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0510 2548-0000200 13.700
MILLED SHOULDER RUMBLE STRIPS,
PCC SURFACE
STA _________._____ _________._____
0520 2548-0000320 2.160
MILLED CENTERLINE RUMBLE
STRIPS, PCC SURFACE
STA _________._____ _________._____
0530 2551-0000110 4.000
TEMP CRASH CUSHION EACH _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0002
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0540 2599-9999018 997.600
('SQUARE YARDS' ITEM) PAVED
SHOULDER, P.C. CONCRETE, 13 IN.
SY _________._____ _________._____
Section: 0002 Total: _________._____
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
SECTION: 0003
ROADSIDE ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0550 2601-2638352 36.500
SLOPE PROTECTION, WOOD
EXCELSIOR MAT
SQ _________._____ _________._____
0560 2601-2643110 7.300
WATERING FOR SOD, SPECIAL DITCH
CONTROL, OR SLOPE PROTECTION
MGAL 75.00000 547.50
0570 2601-2643300 3.000
MOBILIZATION FOR WATERING EACH 450.00000 1,350.00
0580 2602-0000150 200.000
STABILIZED CONSTRUCTION
ENTRANCE, EC-303
LF _________._____ _________._____
0590 2602-0000212 300.000
FLOATING SILT CURTAIN (HANGING) LF _________._____ _________._____
0600 2602-0000240 150.000
MAINTENANCE OF FLOATING SILT
CURTAIN
LF _________._____ _________._____
0610 2602-0000312 2,200.000
PERIMETER AND SLOPE SEDIMENT
CONTROL DEVICE, 12 IN. DIA.
LF _________._____ _________._____
0620 2602-0000320 2,200.000
PERIMETER AND SLOPE SEDIMENT
CONTROL DEVICE, 20 IN. DIA.
LF _________._____ _________._____
0630 2602-0000351 4,400.000
REMOVAL OF PERIMETER AND
SLOPE OR DITCH CHECK SEDIMENT
CONTROL DEVICE
LF _________._____ _________._____
0640 2602-0010010 1.000
MOBILIZATIONS, EROSION CONTROL EACH 600.00000 600.00
0650 2602-0010020 1.000
MOBILIZATIONS, EMERGENCY
EROSION CONTROL
EACH 1,200.00000 1,200.00
Contracts and Specifications Bureau
9/8/2026 12:55 PM
Proposal Schedule of Items
Proposal ID: 02-0343-039 Call Order: 001 Letting Date: October 20, 2026
Section: 0003 Total: _________._____
Total Bid: _________._____
DS-23011
(New)
DEVELOPMENTAL SPECIFICATIONS
FOR
FLOATING SILT CURTAIN
Effective Date
October 17, 2023
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23011.01 DESCRIPTION.
Floating Silt Curtains are temporary control measures used for containing suspended sediment in an area
of open water. Open water is described as any perennial water course or water body with 6 inch (150
mm) or greater depth. Floating Silt Curtains consist of fabric fastened to a flotation carrier and weighted
along the bottom edge. Two types of Floating Silt Curtains may be utilized:
A. Floating Silt Curtain (Containment).
Floating Silt Curtain (Containment) is intended to capture all sediment entering the water during
construction activities and the sediment is to be removed with the floating silt curtain upon
completion of the work.
B. Floating Silt Curtain (Hanging).
Floating Silt Curtain (Hanging) is intended to create a static water area isolated from the water
course or water body. Sediment entering the static water area is isolated and settles out of
suspension within the area of the floating silt curtain.
23011.02 MATERIALS.
A. Floating Silt Curtains shall meet the following minimum requirements and manufacturer
recommendations:
Table DS-23011.02-1: Floating Silt Curtain Requirements
Property Value
Curtain Fabric Material Type Impermeable vinyl-coated nylon
Mass Per Square Yard 22 oz.
Grab Tensile Strength ASTM D 4632 * 500 lbs.
Flotation 8 inch diameter marine quality
expanded polystyrene
Net Buoyancy, Per Foot 20 lbs.
Top Load Carrying Components
Fabric plus 5/16 inch galvanized
steel cable 9100 lbs. minimum
break strength
Ballast, Lbs. Per Foot, Minimum 1.0 lbs./foot enclosed 5/16 inch
galvanized chain
Connection Between Sections Aluminum collar reinforced quick
disconnects
* Minimum average roll value.
DS-23011, Page 2 of 3
B. Design connecting devices to prevent silt from permeating through the connection and at
specified strength to prevent ripping out.
23011.03 CONSTRUCTION.
A. General.
1. Construct Floating Silt Curtain as shown in the contract documents and to the expected water
depth plus wave height.
2. On US Coast Guard regulated waters or other navigable waterways, furnish buoys to mark
the ends and special areas for visibility. Place buoys as required for navigational purposes.
3. Floating Silt Curtain shall be installed adjacent to planned work area prior to soil disturbance.
The curtain shall be installed along the complete work area which is planned to be disturbed
and to points 20 feet beyond the limits of the area of disturbance and tied into the existing soil
bank.
4. Floating Silt Curtain (Containment) installations will require both a containment floating silt
curtain and a hanging floating silt curtain. Install the two floating silt curtains as shown in the
contract documents with the containment silt curtain closest to shore and the hanging silt
curtain 10 feet outside the containment silt curtain.
5. Do not discharge water pumped from the work site into an area of unrestrained open water.
6. Control surface drainage prior to entry into the water by installation of appropriate erosion
control measures on land.
B. Floating Silt Curtain (Containment).
1. Install Floating Silt Curtain (hanging) prior to installation of Floating Silt curtain (Containment).
2. Shape water body soil bank to enable installation of Floating Silt Curtain (Containment) as
detailed in the contract documents.
3. Install Floating Silt Curtain (Containment).
4. Anchors shall include a chain having a minimum weight of 3.0 pounds per yard and anchor
weights as needed to hold curtain down.
5. Inspect the containment floating silt curtain after heavy winds or major rain storms (1 inch) to
check for damage and depth of silt on the bottom of the silt curtain. If 2 inches or more of silt
is present on top of the silt curtain, remove the silt curtain and silt as described below and
reinstall floating silt curtain.
6. Upon completion of the work or when clean-out of containment silt curtain is required, remove
containment silt curtain. Dispose of collected silt offsite at an upland, non-wetland location or
as approved by the Engineer. Following removal of containment curtain, the hanging curtain
shall remain in place for a minimum of 48 hours after which it can be removed, provided all
work in the area being protected is completed.
C. Floating Silt Curtain (Hanging).
1. Anchors shall be a minimum of 60 pounds and located at a maximum spacing of 50 feet
along curtain.
DS-23011, Page 3 of 3
2. Hanging silt curtain shall remain in place for a minimum of 48 hours after completion of work
activity to allow suspended sediment to settle out after which time the silt curtain can be
removed. Remove curtain in a manner that will prevent re-suspension of silt into the water.
23011.04 METHOD OF MEASUREMENT.
A. Floating Silt Curtain, of the type specified, will be measured by length in feet furnished and
installed.
B. Clean-out of Floating Silt Curtain (Containment) will be measured by length in feet removed,
cleaned, and reinstalled (if necessary) each time cleaning is required.
C. Maintenance of Floating Silt Curtain, when directed by the Engineer, will be measured in feet for
sections of curtain requiring maintenance (typically 50 foot sections).
23011.05 BASIS OF PAYMENT.
A. Payment for Floating Silt Curtain (Hanging) will be the contract unit price for the length in feet of
hanging silt curtain furnished and installed. Payment is full compensation for labor, equipment,
and materials necessary to construct, and remove hanging silt curtain. Upon satisfactory
installation of hanging silt curtain, the Engineer may authorize partial payment not exceeding 80%
of the quantity placed. Remaining quantity will be paid after Floating Silt Curtain is removed.
B. Payment for Floating Silt Curtain (Containment) will be the contract unit price for the length in feet
of containment silt curtain furnished and installed. Payment is full compensation for labor,
equipment, and materials necessary to construct containment silt curtain.
C. Payment for Clean-out of Floating Silt Curtain (Containment) will be the contract unit price for the
length in feet of the Containment Silt Curtain removed each time cleaning is required. Payment is
full compensation for labor and equipment necessary to remove and clean containment silt
curtain, remove and dispose of collected silt, and reinstall containment silt curtain (if necessary).
Clean-out of Floating Silt Curtain (Containment) will be paid to remove the containment silt curtain
at the completion of the project.
D. Payment for Maintenance of Floating Silt Curtain will be at the contract unit price per foot of
floating silt curtain requiring maintenance, as directed by the Engineer. Payment is full
compensation for labor, equipment, and materials necessary to maintain Floating Silt Curtain
(Hanging and Containment). Maintenance includes repairs and realignment of existing curtain
and labor cost when the Floating Silt Curtain is replaced due to loss or destruction. When Floating
Silt Curtain is lost or destroyed, Contactor will receive additional payment based on the material
invoice cost of the replacement curtain.
DS-23032
(New)
DEVELOPMENTAL SPECIFICATIONS
FOR
ELECTRONIC TICKETING
Effective Date
October 17, 2023
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
SHALL PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23032.01 DESCRIPTION.
A. This work shall consist of providing electronic material tickets for all loads of flexible paving
mixture or ready mixed PCC delivered to the project. Electronic ticketing will only be required for
the primary material supplied to the project, i.e. flexible paving mixture for an HMA resurfacing
project or PCC for a PCC paving project. Electronic tickets for other materials supplied to a
project may be submitted at the Contractor’s option. The Contractor/supplier can use the plant
ticketing system of their choice to create the material ticket data.
B. Ticket data shall include the following:
1. After each truck is loaded, ticket data must be electronically captured, and ticket information
uploaded via web service / Application Programming Interface (API) to the agency.
2. Material ticket data will be submitted to https://iowa.dot-portal.io via an HTTPS POST as
JSON documents. Include the API key specific to each customer in each request as an HTTP
header.
3. Material supplier must test to confirm that ticketing data can be shared from the originating
system no less than 30 days prior to project start. Topic shall be discussed at the pre-
construction meeting.
4. Ticket data must be available immediately upon project start so there are no delays to
viewing tickets.
5. Provide the same data that is currently accessible and viewed by agency users previously on
printed tickets specific to state projects.
6. Transmit ticket data before the truck leaves the plant and transmit any updates to the ticket
data within 5 minutes of a change.
DS-23032, Page 2 of 3
23032.02 CONSTRUCTION DATA.
Contractor shall submit material ticket data in accordance with the plant manufacturer’s system
recommendations to provide the following.
A. Net weight (or volume for ready mix concrete) of material being transported (to nearest 0.01 ton
or cubic yard).
B. Running daily total of net weight of material (or volume for ready mix concrete) being transported
(to the nearest 0.01 ton or cubic yard).
C. Each material ticket shall contain the following:
1. General Ticket information (All Material).
a. Date.
b. Iowa DOT Project Number.
c. Name of Contractor
d. Name of material supplier.
e. Unique truck ID.
f. Plant/scale name (source).
g. Truck Status Times:
1) Loaded time (time batched) shall be available.
2) Provided other truck status times as available.
a) Ticketed.
b) Load time.
c) Left plant.
d) Arrive at project.
e) Begin unload.
f) Finish unload.
g) Leave project.
2. Portland Cement Concrete.
a. Loaded time (water/cement time).
b. Wet and dry batch weights (if computer generated).
c. Water:
1) In aggregate.
2) Total water.
3) Water/cement ratio.
4) Max water/cement ratio.
5) Allowable water to add.
d. Admixtures (including brand names if available):
1) Retarder and weights.
2) Water reducer and weights.
3) Air entrainment and weights.
4) Special performance admixtures and weights.
5) Concrete fibers.
e. Cementitious material(s) and weights.
f. CPI Name and certificate number.
3. Flexible Pavement Mixture.
a. Type of material.
b. Gross weight (if not automatic weighed).
c. Tare weight (if not automatic weighed).
d. Net weight.
e. Mix design number.
DS-23032, Page 3 of 3
23032.03 METHOD OF MEASUREMENT.
None.
23032.04 BASIS OF PAYMENT.
Payment for electronic ticketing will be incidental to the material being provided.
- Package Files
- Name
- 20OCT001\Plan\02-0343-039\02-0343-039_C.pdf
- Bytes
- 31820346
- Name
- 20OCT001\Prop\DS-23011.pdf
- Bytes
- 47165
- Name
- 20OCT001\Prop\DS-23032.pdf
- Bytes
- 47943
- Name
- 20OCT001\Prop\DS-23083.pdf
- Bytes
- 140721
- Name
- 20OCT001\Prop\estprop001.pdf
- Bytes
- 302747
- Name
- 20OCT001\Prop\UTIL001.pdf
- Bytes
- 177163
- Package Pages
- 21
- Categorized By
- llm
- Package Scope Docs
- 3
- Package Manifest Only
- No