The work consists of: Installation of approximately 6.49 miles of water main along Inner Perimeter Road and South Patterson Street including 24,693 linear feet of PVC water line ranging from 12" to 20" by excavation and 7,400 linear feet of Fusible PVC water line of similar size by directional bore, 2,162 of push-on or restrained joint ductile iron water line ranging from 12" to 20", and 1,436 linear feet of steel casing ranging from 24" to 36" by jack and bore, 28 fire hydrants complete, 22 resilient seated gate valves and valve boxes ranging from 8" to 20", pavement removal and replacement, soil erosion and sediment control best management practices, storm water monitoring, and appurtenances
The work consists of installation of approximately 6.49 miles of water main along Inner Perimeter Road and South Patterson Street including 24,693 linear feet of PVC water line ranging from 12" to 20" by excavation and 7,400 linear feet of Fusible PVC water line of similar size by directional bore, 2,162 of push-on or restrained joint ductile iron water line ranging from 12" to 20", and 1,436 linear feet of steel casing ranging from 24" to 36" by jack and bore, 28 fire hydrants complete, 22 resilient seated gate valves and valve boxes ranging from 8" to 20", pavement removal and replacement, soil erosion and sediment control best management practices, storm water monitoring, and appurtenances.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-66249-NONST-2027-000000119), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.