Culvert Rehabilitation- Tutorials and instructions for Project # 262088 are available online at www.projectdoc.com
The work includes cleaning, preparation, and structural glass fiber reinforced slip lining of the existing 11.5'x7.5' reinforced concrete box culvert under Eldon B. Keith Field, including all required culvert grouting and sideline drain connections reinstatement. The work also includes all restoration, bypass pumping, miscellaneous work and cleanup, and all required work as shown on the Drawings and as specified. Additionally, the work includes culvert outlet headwall replacement as Bid Alternate No. 1.
We post new plumbing opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1143-PRO15-PRO15-133833), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.