Project Description: Replacement of two culverts. Culvert 1 will replace a stone culvert with a 6-foot wide x 5-foot deep (72" x 60") box culvert lined with a 2-foot deep stone infill. Culvert 2 will replace a 24" corrugated metal pipe with a 3-foot wide x 2-foot deep (36" x 24") box culvert lined with no stone infill. Both culverts on SWSC property at the Springfield Reservoir, 1149 Center Street, Ludlow, Massachusetts.
The Project is estimated not to exceed $220,000.
Pre-Bid Conference: An optional pre-bid meeting will be held onsite at 1149 Center Street in Ludlow, MA on October 6, 2026 at 10:00AM. Bidders are strongly encouraged to attend the pre-bid meeting. Pre-bid Contact: Edward J. Sweeney, edward.sweeney@waterandsewer.org
Culvert 1 will replace a stone culvert with a 6-foot wide x 5-foot deep (72" x 60") box culvert lined with a 2-foot deep stone infill. Culvert 2 will replace a 24" corrugated metal pipe with a 3-foot wide x 2-foot deep (36" x 24") box culvert lined with no stone infill. Both culverts are on SWSC property at the Springfield Reservoir, 1149 Center Street, Ludlow, Massachusetts.
We post new plumbing opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1531-SWSPD-SWSPD-133651), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.