To obtain access to the controlled documents in SAM.gov, complete Attachment 11, Non-Disclosure Agreement and return to the Contracting Officer (Brett Zeigler, brett.zeigler@fletc.dhs.gov) then request access to the controlled documents in SAM.gov
**Amendment 0002: **The purpose of this amendment is to provide responses to questions submitted, post the site-visit sign-in sheet, provide photos, provide drawings, and update the statement of work and specifcations.
**Amendment 0001: **The purpose of this amendment is to clarify the date of the site visit (October 22, 2026), period of performance, and due date for submitting questions.
This Request for Proposal will result in a Single Firm Fixed Price Contract Award for Building 262 Renovation on the Federal Law Enforcement Training Center Glynco, GA.
This acquisition is a 100% Small Business Set-Aside, under North American Industry Classification Systems (NAICS) Code 236220, Commercial and Institutional Building Construction.
A site visit is scheduled for October 22, 2026, at 9:00am at FLETC Glynco Building 200. Upon arrival, attendees should report to the commercial gate a minimum of 30 minutes prior to the application screening process, then proceed to Building 200. All personnel who are not currently badged will need to complete and return Day Pass applications for all attendees no later than October 20, 2026, at 5:00pm to the attention of Project Manager, Richard Love at richard.love@fletc.dhs.gov. Please coordinate receipt of badge applications and submission with Mr. Love.
Complete Attachment 11, Non-Disclosure Agreement and return to the attention of the Contracting Officer. The completed NDA is requierd to obtain access to controlled documents in SAM.
The contractor shall provide all labor, materials, equipment and supervision to renovate Building 262 at FLETC Glynco, Georgia in accordance with the statement of work, specifications, drawings and contract terms, including verifying field quantities, dimensions and site conditions, with line items for general requirements, existing conditions, thermal and moisture protection, openings, finishings, special construction, electrical, and heating ventilation and air conditioning, with completion ready for use 425 days after notice to proceed.
We post new general contractors opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""31524""GLYNCO""GA""USA""1131 CHAPEL CROSSING ROAD""CADD and PDF Drawings AMD 0002.zip"1045360"file"".zip""1""2026-10-23T19:21:45.49+00:00""70e69728de4d496ca937bc5cb6bc0191""private""0""controlled""75a63e084dc942bb93d345c45b2690ad""1"158"0""Building 262 Photos 70LGLY27RSSB00001.pdf"12607622"file"".pdf""1""2026-10-23T19:21:45.49+00:00""1ff4ba32225e44c791ea4d9f1db6df0e""private""0""controlled""8968e7498010442992baaa1677e5816e""1"157"0""Site Visit Sign-In Sheet 70LGLY27RSSB00001 Building 262 Renovation.pdf"1272699"file"".pdf""1""2026-10-23T19:21:45.49+00:00""a4cda118e02b4ff09e5101d3c512dad4""public""0""public""414ad4781af343c6b2adf756ab025f8d""0"156"0""Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001 AMD 0002.pdf"3096095"file"".pdf""1""2026-10-23T19:21:45.49+00:00""919b76a914ff43a893beb6c0b81661b1""private""0""controlled""eab69c5ab80949e79ba0dc345ae12352""1"155"0""RFI 01 70LGLY27RSSB00001 Building 262 Renovation.pdf"187842"file"".pdf""1""2026-10-23T19:21:45.49+00:00""f86a2da1e19a4804882252ed9d2dad59""private""0""controlled""dfb89c2486b34fcea5df7d37addbe6a1""1"154"0""Exhibit A - Proposal Breakdown.xls"40448"file"".xls""1""2026-10-23T19:21:45.49+00:00""ca9be1ccacb549a09ef1c0a4812da24f""private""0""controlled""caf9e6efaa664655b94bc54b67a5a5ac""1"153"0""70LGLY27RSSB00001 Amendment 0002 Request for Proposal Building 262 Renovation.pdf"789544"file"".pdf""1""2026-10-23T19:21:45.49+00:00""aefb533c72f941e3b89d5b802b1a7273""public""0""public""93395d4d144c4c34bf7c6f25136ffcc1""0"152"0""70LGLY27RSSB00001 Amendment 0001 Request for Proposal Building 262 Renovation.pdf"797328"file"".pdf""1""2026-10-14T16:23:41.64+00:00""0f3879c8e453429a9e1698bab573a7e9""public""0""public""45f438a6b33e46c48d98ecbb9c1c4007""0"151"0""70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf"846628"file"".pdf""1""2026-10-09T15:41:20.545+00:00""e15793e2495c4202b0929de50a872ab9""public""0""public""5f181038ed844407b58b6e7d481f35e9""0"150"0""Building 262 Drawings.zip"114896857"file"".zip""1""2026-10-09T15:56:18.851+00:00""3fcb86a6a3284710a78efffd193b823c""public""0""public""a965211e06db44e4a61bc594e122f8b0""0"149"0""Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001.pdf"3922549"file"".pdf""1""2026-10-09T15:41:20.545+00:00""ada055226a604831b09c0416238badef""private""0""controlled""fa10f7e023ee4d09965b2d00866ce573""1"148"0""Att 002 SF25 Performance Bonds.pdf"726819"file"".pdf""1""2026-10-09T15:41:20.545+00:00""ea1a3ef61670496cad40004cd423dd49""private""0""controlled""bd11c5576db44ebf99dcf52590cdfabf""1"145"0""Att 003 SF 25A Payment bonds -.pdf"716931"file"".pdf""1""2026-10-09T15:41:20.545+00:00""ada377951c0c4ff8bfe9d543de23d998""private""0""controlled""3a8e91e4077845519b3027eee6954cc6""1"142"0""Att 004 SF28 Affidavit of Individual Surety - Copy - Copy.pdf"707780"file"".pdf""1""2026-10-09T15:41:20.545+00:00""bbb471079d6248fc9528b411bbfa6344""private""0""controlled""ed92533601e74ff3bafbf1825219f48b""1"140"0""Att 005 Format ILC -.pdf"476189"file"".pdf""1""2026-10-09T15:41:20.545+00:00""7b9de21d02a94cfeb6872c0ea57ab3bf""private""0""controlled""b51e92f8aaf04cbdb28d73522c1a7ef1""1"136"0""Att 006 Format FIN INST ILC CONFIRM - Copy.pdf"537598"file"".pdf""1""2026-10-09T15:41:20.545+00:00""81ebbbc0621c47b9957c1f944d39d44f""private""0""controlled""3161a1d8fc3543d1a0af0a7d5b443968""1"134"0""Att 007 FMD_70 - Copy.pdf"50678"file"".pdf""1""2026-10-09T15:41:20.545+00:00""31ff5ccfba3341bd913f5fccbd803ffd""private""0""controlled""2a94875f5def4f6e8f34a3b6fee88c40""1"132"0""Att 008 Instructions for Completing WH-347 - Copy.pdf"621491"file"".pdf""1""2026-10-09T15:41:20.545+00:00""0f4f6035481048fba3624fa7805c70be""private""0""controlled""4b80e59b4d9341be84046a7ff82e4cdb""1"130"0""Att 009 WH 347 Wage and Hour Division - Copy.pdf"304738"file"".pdf""1""2026-10-09T15:41:20.545+00:00""b94eb3d5e9b549c3896df76c3db14326""private""0""controlled""8ec38b17c4a14b3aaeaac8f7e888bf0b""1"128"0""Att 010 FMD_42 - Copy.pdf"31200"file"".pdf""1""2026-10-09T15:41:20.545+00:00""d94afceac91a454ca426247e639b0e11""private""0""controlled""d5e85bb514574dc9ac1b30b46ddc8047""1"126"0""Att 011 DHS 11000-6 Non-Disclosure Agreement - Copy.pdf"115202"file"".pdf""1""2026-10-09T15:41:20.545+00:00""43edb671c02b44ee9c1ff7f6a0c0da11""public""0""public""1ed52f12cb9540ff9445da3506878233""0"124"0""Att 013 USCIS Form I-9 Instructions for Employment.pdf"297017"file"".pdf""1""2026-10-09T15:41:20.545+00:00""49cdec1b21024763a2c06e37a11cfb3c""private""0""controlled""4f2b248aa1bb43ad901352afdc83f080""1"122"0""Att 014 Eligibility Verification Form.pdf"524095"file"".pdf""1""2026-10-09T15:41:20.545+00:00""179c460e37b546e0b7b2dfb1bcdab076""private""0""controlled""507f57d3e0b547b2975575e0c2706e5a""1"120"0""Att 015 Questionnaire for Non-Sensitive Positions.pdf"209833"file"".pdf""1""2026-10-09T15:41:20.545+00:00""16c20bf8052740cf945a65c17f5929a8""private""0""controlled""f1e6de4e00b24920afbc021fd1d6a3a2""1"118"0""Att 016 Security Handout.pdf"241484"file"".pdf""1""2026-10-09T15:41:20.545+00:00""2b253c278cda4ed19cfbc370575abd56""private""0""controlled""42e37dea2ab5407fa427555c38738311""1"116"0""Att 017 Security Training List.pdf"514486"file"".pdf""1""2026-10-09T15:41:20.545+00:00""354cf099525d4f8b94a8666e275af51c""private""0""controlled""9a9dac8c18514c278a4b1881766af207""1"114"0""Att 018 Wage Determination GA20260315 05182026.pdf"72379"file"".pdf""1""2026-10-09T15:41:20.545+00:00""fe660275355447c2917b71b9e757fc23""public""0""public""c7085c63fa7c4f1db11fd43cc5aee58d""0"113"0""Att 019 Statement and Acknowledgment.pdf"703768"file"".pdf""1""2026-10-09T15:41:20.545+00:00""5eed20f4117d41c5a2123f5e6136c586""private""0""controlled""a0b3779bb7ad4f86a38e63658759ec18""1"112"0""Att 020 SF1444 Request for Authorization of Additional Classification and Rate.pdf"715166"file"".pdf""1""2026-10-09T15:41:20.545+00:00""2a490db8d32345c6a30afa4b72346cf2""private""0""controlled""ea5e8a16547347909818cd896c3061f4""1"111"0""Att 021 Bid Bond.pdf"720305"file"".pdf""1""2026-10-09T15:41:20.545+00:00""d98df1245fbe41b48b593e359888a9e0""private""2026-10-23T19:21:45.49+00:00""1""controlled""d9d83fe997db4012a003cb5484013ded""1"92"0""2026-10-23T19:21:45.49+00:00""Att 022 SF LLL Disclosure of Lobbying Activities.pdf"2239480"file"".pdf""1""2026-10-09T15:41:20.545+00:00""4d516e199486422eaa8129964c19d546""private""0""controlled""5178d6fe21ba400cb41f5ff420cb9bff""1"75"0""Att 023 Financial Questionnaire.pdf"146500"file"".pdf""1""2026-10-09T15:41:20.545+00:00""dd651b42907d4ec7befd6dd3d093e8e2""private""0""controlled""ccffe28b521b4189848eb641c07b0f48""1"53"0""Att 024 700-3 Contractor Release Form.pdf"651419"file"".pdf""1""2026-10-09T15:41:20.545+00:00""a27cdf12e9cb4a7a933c20dac91e87ad""private""0""controlled""87ac6ac7a5bb4604bc60d0464f0d81a2""1"52"0""Att 025 WH DOL Poster.pdf"221629"file"".pdf""1""2026-10-09T15:41:20.545+00:00""5a9d9bb86b8f44698e4ceb0b30b81e3e""private""0""controlled""2af16f31d2164b6597aeb3a11a586a06""1"15"0""Att 026 Past Performance Questionnaire.pdf"128579"file"".pdf""1""2026-10-09T15:41:20.545+00:00""1633c14e8ba44a1890b89f78b3eea2ff""private""0""controlled""f3a1457f15c3483ebea78e993f597f2e""1"6"0""Exhibit A - Proposal breakdown 70LGLY26RSSB00022 Flood Mitigation and Site Improvements.xls"40448"file"".xls""1""2026-10-09T15:41:20.545+00:00""abf34e2d42d446b0a52950f8f4c0c33a""private""2026-10-23T19:21:45.49+00:00""1""controlled""659afa73d45a41efbb8bbff80a3c238f""1"1"0""2026-10-23T19:21:45.49+00:00"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 65f66615f3ec4ae3924ac43a67abe1b6), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.