This is a pre-solicitation notice. Please note that all attached documents, including the Statement of Work, are preliminary versions and are subject to change. All detailed requirements, technical specifications, and submission instructions, once finalized, will be provided in the formal solicitation.
Interested vendors are encouraged to review these draft documents for a comprehensive understanding of the anticipated project scope. This project is a Design-Build requirement to construct a sustainable water supply and storage system at Bazum Village in Armenia. The scope includes the design and construction of a water collection system, water distribution infrastructure, along with a dedicated water storage system for the Bazum community.
The scope includes the design and construction of a water collection system, water distribution infrastructure, along with a dedicated water storage system for the Bazum community.
We post new plumbing opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=PANNAD26P0000028505¬iceType=Presolicitation"0"link""1""2026-06-08T08:45:25.689+00:00""bbba6fc985cc466d89e4107dc3e85e42""public""0""PIEE Solicitation Module Link for PANNAD26P0000028505""public""97f06441a4c44005bc47acb54dce00f6""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-06-08T08:45:25.689+00:00""8537944dd29b4385afc30d96d66636c1""public""0""Web Based Training for the PIEE Solicitation Module""public""0a2aa186a8dd4318a528220b5e2eeba4""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-06-08T08:45:25.689+00:00""e727c28b5d08451db84129fe38ceb431""public""0""Registration Instructions for the PIEE Solicitation Module""public""157a1ca40560493588a562cf8b94bda4""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-06-08T08:45:25.689+00:00""7ccee62114d147ad868bd2324cce47ac""public""0""Department of Defense Procurement Toolbox""public""8e73f14047e941cea1f9df072f4dd54e""0"1"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2502e4ecd45e48fa9dc079bc298fee2c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.