The City of Rock Island requires a $10,000 continuous bond on file with the Engineering Division before it will issue an excavation permit in the public right-of-way. Ours is $100 flat — the price you see at checkout is the price you pay, the same for every contractor.
















A municipal permit bond is among the simplest bonds we issue. Here is the whole process:
Business details and an effective date — that is the application. No financials to gather up front.
Permit bonds like this are among the thousands of bond types that issue right after purchase. At most, 1–2 business days.
Your executed bond and power of attorney arrive by email, ready to file with the Engineering Division so it can confirm your bond is current before issuing an excavation permit number. Wet-ink original mailed on request.
The City of Rock Island’s Public Works Department, Engineering Division requires a $10,000 continuous license/permit bond on file before it issues an excavation permit for work in the public right-of-way — utility installation, boring, or any dig affecting city streets or sidewalks.
It’s a three-party arrangement: you (the principal), the surety carrier, and the City of Rock Island (the obligee). The bond guarantees your excavation work complies with the City’s construction standards and is properly restored — so Rock Island isn’t left absorbing the cost of a dig left unrepaired or out of code.
It is not insurance for you. If the City makes a valid claim and the surety pays, you repay the surety. Because the Engineering Division checks bond status before issuing each permit number, keeping this bond current is what keeps your excavation permits flowing without delay.
These are the actual issuing fields — the application is short, and there’s no hard credit pull on this bond.
Start the application →$100 flat, soft pull only, bond often issued in the same sitting. Free until issued.