Rock Island concrete flatwork bonds.
$100 flat.

The City of Rock Island requires a $10,000 bond, filed with the director of public works, before it issues a concrete flatwork license for curb, driveway, and sidewalk work. Ours is $100 flat — the price you see at checkout is the price you pay, the same for every contractor.

Required by the City of Rock Island Engineering Division before it issues a concrete flatwork license
Fixed amount, fixed price — $10,000 bond, $100, no quote process
Filed as a continuous bond — stays in force until canceled, so lapses are your responsibility to watch
A-ratedA.M. Best carriersSoft pull onlynever a hard inquiry1–3 yrterms available
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Three steps. One sitting.

A municipal license bond is among the simplest bonds we issue. Here is the whole process:

NOW · ONLINE

Apply online

Business details and an effective date — that is the application. No financials to gather up front.

MINUTES, USUALLY

Pay & e-sign

License bonds like this are among the thousands of bond types that issue right after purchase. At most, 1–2 business days.

SAME DAY

File with the City of Rock Island

Your executed bond and power of attorney arrive by email, ready to file with the Engineering Division alongside your concrete flatwork license application. Wet-ink original mailed on request.

About this bond

What it is and who needs it.

What the bond actually guarantees

The City of Rock Island’s Public Works Department, Engineering Division licenses concrete flatwork contractors who pour curbs, driveway approaches, alleys, and sidewalks in the public right-of-way. Licensing is conditioned on a $10,000 surety bond filed with the director of public works.

It’s a three-party arrangement: you (the principal), the surety carrier, and the City of Rock Island (the obligee). The bond guarantees your flatwork complies with the City’s construction standards and permit conditions — so Rock Island isn’t left absorbing the cost of a curb cut or sidewalk poured out of spec.

It is not insurance for you. If the City makes a valid claim and the surety pays, you repay the surety. The City treats this as a continuous bond that stays in force until canceled — the surety can end it with 30 days’ written notice to the Engineering Division, so keep your filing current.

City of Rock Island Public Works Department — Engineering DivisionThe City of Rock Island requires a $10,000 continuous bond, filed with the director of public works, before issuing a concrete flatwork license for curb, driveway approach, alley, and sidewalk work performed under city permit. Confirm current license terms with the Engineering Division before filing.

You need this bond if you are

A concrete contractor applying for a new Rock Island concrete flatwork license
Renewing your annual license with an expiring or non-renewing city bond
A subcontractor pouring curb, driveway, or sidewalk work under a Rock Island permit
New to Rock Island and setting up your first concrete flatwork filing

One application, issued instantly.

These are the actual issuing fields — the application is short, and there’s no hard credit pull on this bond.

Start the application →
FAQ

Common questions.

How much is the Rock Island concrete flatwork bond?The premium is $100, flat — the price you see at checkout is the price you pay, the same for every contractor. The $10,000 amount is set by the City of Rock Island; the premium is set by our carrier’s rate book, so there is no quote process.
Do I pay the $10,000?No. You pay $100. The $10,000 is the surety’s maximum liability to the City of Rock Island if a valid claim is made — it is not a deposit, and nobody holds your money.
How fast will I have the bond?License bonds like this are among the thousands of bond types that issue right after purchase — many contractors finish the application and have the bond in the same sitting. At most, 1–2 business days.
Is there a credit check?The application includes a standard credit consent, but it authorizes a soft credit pull only — a soft inquiry that never affects your score. No hard inquiry ever runs on this bond.
Is this the same bond as the excavator’s bond?No. The concrete flatwork license and bond cover curb, driveway, and sidewalk pours; a separate $10,000 excavator’s bond covers general excavation permits in the right-of-way. Contractors who do both file each bond separately.
Related bonds

Other Illinois bonds.

Finish your Rock Island filing today.

$100 flat, soft pull only, bond often issued in the same sitting. Free until issued.

Your price$100
Apply now →