NGWSP Turnout Buildings
The work consists of constructing a potable water delivery turnout building and associated improvements at each of seven sites (Sanostee, Newcomb, Naschitti, BBN9, Coyote Canyon, Rock Springs, and Window Rock). Scope includes sitework with buried piping, valves, and accessories; access roads at Coyote Canyon and Window Rock; steel fencing with gate; gravel surfacing; drainage; steel piping connections to existing lateral and distribution pipes; buried thrust blocks; fiberoptic cable infrastructure; precast concrete building and foundation including geotechnical investigation and foundation design; interior exposed piping, valves, and accessories; building mechanical, electrical, controls, instrumentation, and security; controls integration with the existing San Juan Lateral SCADA system; and flushing, testing, and disinfecting installed piping.
We post new general contractors opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140R4026B0002_Amd_0005.pdf"326460"file"".pdf""1""2026-11-04T23:30:32.299+00:00""8df12eb1a1904b06bec356522ca2dfea""public""0""public""ef7ebaa794cb401bb182c58bb621ca7c""0"22"0""Sol_140R4026B0002_Amd_0004.pdf"206833"file"".pdf""1""2026-10-27T20:53:23.163+00:00""563ff486e1644e2fa0245eef6bf97d09""public""0""public""672adc2ab3a74fd9a45b8b2a7ac39d1d""0"21"0""Sol_140R4026B0002_Amd_0003.pdf"206243"file"".pdf""1""2026-10-13T20:11:06.466+00:00""bc451c03cbc648df97eb698aedc4031e""public""0""public""d0c0f7fb6f8a44fa9c450074f8e38b07""0"20"0""Sol_140R4026B0002_Amd_0002.pdf"569066"file"".pdf""1""2026-10-13T19:34:33.255+00:00""fc664d45fadc4e0aae5ab509b9bcacc8""public""0""public""a3514513d70c4e3bb6c245a5ab5355ef""0"19"0""Attachment__8_WD_NM20260024_Building_-_McKinley_County__NM_0002.pdf"64058"file"".pdf""1""2026-10-13T19:34:33.255+00:00""eebcf6a2e7594c00a3da8ae4ecf6b05e""public""0""public""b1d0ba6bec554749b695ad7e532b2864""0"18"0""140R4026B0002_-_Attachment_2_1_00_00_02_-Drawings_-20261009_0002.pdf"21352562"file"".pdf""1""2026-10-13T19:34:33.255+00:00""1d1d29868fe2444ba4634d649b20d707""public""0""public""14d61ea7461148ff806db3830415dd28""0"17"0""Attachment__7_WD_NM20260011_Heavy_-_McKinley_County__NM_0002.pdf"61393"file"".pdf""1""2026-10-13T19:34:33.255+00:00""91ac275d9bde4b718fa5ea7e46a3bf58""public""0""public""23ea07bff88a40f283ba1f78479c35b5""0"16"0""Questions___Answers_0002.pdf"146510"file"".pdf""1""2026-10-13T19:34:33.255+00:00""45c027313c4e4123a24d284cf2b28210""public""0""public""f46b518c8d314c2993d233a577a1cd6c""0"15"0""140R4026B0002_-_Attachment_1_1_00_00_01__Specifications__20261009_0002.pdf"1161895"file"".pdf""1""2026-10-13T19:34:33.255+00:00""096db9c86d71418c8a62cc49ddd6f123""public""0""public""9acd12a9ad0e4d58ab28a10dbef4e757""0"14"0""140R4026B0002_-_Attachment_3_1_00_00_02B_Corrosivity_Report_NGWSP_Turnout_Bldgs_20261009_0002.pdf"1861869"file"".pdf""1""2026-10-13T19:34:33.255+00:00""c188a151caa84d8e8cc611d1d89fcda8""public""0""public""a3c65477dd0447a6b8a665560e7441b7""0"13"0""140R4026B0002_-__Attachment_3_1_00_00_02A_Test_Pit_Log_TPTB-25-2_20261008_0002.pdf"177792"file"".pdf""1""2026-10-13T19:34:33.255+00:00""5aa682a0a42349ba91645eb41d9e174f""public""0""public""6376ab1668a44b05af63586cdb5c71fc""0"12"0""Sol_140R4026B0002_Amd_0001.pdf"206610"file"".pdf""1""2026-08-31T14:46:48.207+00:00""7c0c046590574026a93eb47d5fd2e0e2""public""0""public""49c39445e20e4ff7b5ac6ca587c864cd""0"11"0""Turnout_Site_Tour_Sign-in_Sheet_26_AUG_2026_0001.pdf"143384"file"".pdf""1""2026-08-31T14:46:48.207+00:00""ccff8455846848a7ae38e0cf43da8b56""public""0""public""36e12b67332242a091cfd6e1630cd409""0"10"0""NGWSP_-_FCWR_Turnout_Buildings_Prebid__Site_Visit_-26_AUG_2026_0001.pdf"3881471"file"".pdf""1""2026-08-31T14:46:48.207+00:00""18fef51c23f447038548acbdaf3bf589""public""0""public""0562e576dca6455f9c9936f8bc4cb3b8""0"9"0""Sol_140R4026B0002.pdf"298033"file"".pdf""1""2026-08-13T20:28:03.417+00:00""4d76d096fc8e458ebd2db76b979e0fd5""public""0""public""2a55a88f121d45588f1317b9d6a43dc3""0"8"0""_1_Attachment_00_00_01_NGWSP_TURNOUT_BLDGS_Specifications_20260707.pdf"8463144"file"".pdf""1""2026-08-13T20:28:03.417+00:00""7cfdb2e216264b19a8c4b224883121a3""public""0""public""64e6aca7ac0f4dbeabbca4dcd33db97a""0"7"0""_4_Attachment_Small_Business_Subcontracting_Plan.docx"57369"file"".docx""1""2026-08-13T20:28:03.417+00:00""55c60942a33645498639f8e971c8f2a0""public""0""public""6a2f6778b3e54e26b798c9ac5f65280d""0"6"0""_2_Attachment_00_00_02_Drawings_Combined_34x22_20260707.pdf"71527666"file"".pdf""1""2026-08-13T20:28:03.417+00:00""d4bb26bdcc0d481c9c204c8df032d71e""public""0""public""79c8320cef4e4e46b07f609084043402""0"5"0""_3_Attachment_00_00_02A_-_Geology_Drawings_04032026.pdf"13150315"file"".pdf""1""2026-08-13T20:28:03.417+00:00""2272d768fb0949f0b9a5e70cb1b2a668""public""0""public""0a88f72cefc74badb7a7b38511ba7b74""0"4"0""IFB_140R4026B0002_NGWSP_Turnout_Buildings.pdf"1316642"file"".pdf""1""2026-08-13T20:28:03.417+00:00""b891988f3afc4e528a5697da068020cb""public""0""public""3b36bce3a26445a0bcfbe0b07c7d000c""0"3"0""_5_Attachment_WD_NM20260040_Heavy_-_San_Juan_County__NM.pdf"60887"file"".pdf""1""2026-08-13T20:28:03.417+00:00""0977fe3721a743e197dbf28bbb5453fc""public""0""public""ca018c0ee0f846d885a45569f95ac8e8""0"2"0""_6_Attachment_WD_NM20260046_Building_-_San_Juan_County__NM.pdf"61413"file"".pdf""1""2026-08-13T20:28:03.417+00:00""e8afcb5cbab44c38a6900913f2e336fc""public""0""public""e7ea04531ab945c6b3c9bb2628a0725f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f2b4c55c9c9547878f7b6b1f8fd0d549), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.