Solicitation number 1240BE27Q0018 is issued as a Request for Quotation (RFQ) for the replacement of an existing 3-ton packaged heat pump system with a new, high efficiency ENERGY STAR certified unit that also satisfies FEMP federal purchasing requirements for energy consuming products. The unit serves the Laboratory at the Santee Experimental Forest located at 3734 SC-402, Cordesville, SC 29434.
Please see attached solicitation and supporting documents for a full description of the requirement.
The contractor furnishes all labor, materials, equipment, tools, supervision and incidentals to demolish and remove the existing packaged unit, thermostat and related wiring and condensate while recovering refrigerant, install one new 3-ton ENERGY STAR-certified single packaged heat pump with disconnect, pad, programmable thermostat and condensate management, commission and verify performance, and provide owner training with O&M, warranty and as-built documents.
We post new hvac opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""97601""KLAMATH FALLS""OR""USA""FREMONT WINEMA NF KLAMATH FALLS""2819 DAHLIA STREET""C04_Sol_1240BE27Q0018_CSS_Commerical Products and Services_Final.pdf"335570"file"".pdf""1""2026-11-09T21:20:46.879+00:00""3be6bb4fc5394c8fa8747f7cc9b8fa08""public""0""public""ef278a5b1d264d30afecfd4f970621c2""0"7"0""C04_Statement of Work.pdf"854216"file"".pdf""1""2026-11-09T21:20:46.879+00:00""f8e3ce6bde5448e3960b7d4303c10f0a""public""0""public""783eaa46a2184012a763b104f63de48d""0"6"0""C04_Schedule of Items.pdf"45114"file"".pdf""1""2026-11-09T21:20:46.879+00:00""0edf7b3761dd41b28286a0e56ee115a1""public""0""public""dac95b43faa549b3b786d0ceda98c084""0"3"0""C04_Wage Determination 2015-4427 Rev 35.pdf"4462731"file"".pdf""1""2026-11-09T21:20:46.879+00:00""c2368531e7814164a17d6434f43ef7dc""public""0""public""2327ae2a87ce4153a24cf86fa4631400""0"2"0"Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ee094a05a75441fe83f1ae98416fd98a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.