MUSC is seeking Mechanical, Electrical, and Structural engineering services to replace the HVAC system at its Arco Lane warehouse in North Charleston, SC.
Resumes are due 2026-12-01 at 2:00 PM, and the solicitation was posted 2026-11-09.
The anticipated construction cost range is $1,000,000 to $2,000,000.
The project is expected to replace one air-cooled chiller and six rooftop air handling units.
The anticipated delivery method is Design-Bid-Build.
Submittals may be delivered by hand or mail to Mark Lanning at 43 Sabin St, Charleston, SC 29425, or by email as a PDF no larger than 10MB.
Interested firms must submit a current Standard Federal Form 330, primary contact information, a South Carolina residency certification, and a response to the selection criteria in SC Code § 11-35-3220.
Questions go to Agency Project Coordinator Wade Gatlin at gatlin@musc.edu or (843) 792-2233.
Requirement: Persons or firms must be properly licensed in accordance with Title 40 of the SC Code of Laws at the time of resume submission.
Licence
Properly licensed in accordance with Title 40…
Est. value
$1,000,000 to…
Method
Design-Bid-Build
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Bidding this one? Get the bid bond — free.The documents here don’t name one, so read them yourself — but public work almost always wants a bid bond with the bid.
Provide Mechanical, Electrical, and Structural engineering services for the Arco Lane HVAC replacement.
Submit a Standard Federal Form 330, primary contact details, a SC residency certification, and a response to the selection criteria.
Deliver the resume by 2:00 PM on 12/01/2026.
Requirements
From the documents
Licence
Properly licensed in accordance with Title 40 of the SC Code of Laws
Estimated value
$1,000,000 to $2,000,000
Posted Scope of Work
This project will replace the HVAC system at MUSC's Arco Lane warehouse. It is anticipated that one air-cooled chiller and six rooftop air handling units will require replacement.
Delivery Method: Design-Bid-Build
Scope, read from the documentsAI-generated
Mechanical, Electrical, and Structural engineering services for a project replacing the HVAC system at MUSC's Arco Lane warehouse, anticipated to include replacing one air-cooled chiller and six rooftop air handling units.
More hvac bids in South Carolina, weekly.
We post new hvac opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
A current Standard Federal Form 330, the name and contact information of a primary contact, a certification of South Carolina residency, and a response to the selection criteria in SC Code § 11-35-3220.
Can submittals be emailed?
The notice indicates the agency will accept submittals via email as a PDF file no larger than 10MB; printed copies can also be hand-delivered or mailed to Mark Lanning, 43 Sabin St, Charleston, SC 29425.
This project will replace the HVAC system at MUSC's Arco Lane warehouse. It is anticipated that one air-cooled chiller and six rooftop air handling units will require replacement.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? The bid bond is free.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
You can have the bid bond before the deadline — one form, soft credit pull, A-rated surety. Prequalify instead and you skip the application on every bond after this one.Get the bid bond — free →Prequalify once instead (free) →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: Medical University of South Carolina (solicitation H51-N386-JR), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.