See attached for details.
Amendment 0001 - 10/29/2026
The contractor shall furnish all labor, materials, equipment, supervision, project management, quality control, and coordination to upgrade electrical and plumbing in Building 18B. The electrical work includes demolition of existing overbed lights, wall sconces, and TV wiring; installation of new ceiling-mounted office lighting; modification and relocation of electrical outlets; and installation of new CAT6A data cabling, patch panels, and terminations. The plumbing work includes replacing the 4-inch sanitary pipe between toilets in rooms 18-138 and 18-118, including demolition of existing tile flooring, cutting the concrete slab, removing old piping, installing new piping, pouring new concrete, and restoring flooring to match existing finishes. The contractor must also perform all required patching, surface repairs, and painting to restore affected areas.
We post new electrical opportunities in New Jersey as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""36C24227B0003 0001.pdf"246022"file"".pdf""1""2026-10-29T19:56:18.705+00:00""790c9dbb3846476ca7ac241545c09fae""public""0""public""b745f44d7a57434b81914bed77b7a814""0"7"0""9_561-26-103 Upgrade Electrical in Building 18B Specifications..pdf"58129936"file"".pdf""1""2026-10-29T15:49:12.608+00:00""7065494a81c5411e9022042b27ed5c25""public""0""public""11febf0342bc402b9fb4ef2cc263f8d7""0"6"0""G-101 General Notes and Infection Control ICRA..pdf"299016"file"".pdf""1""2026-10-29T15:49:12.608+00:00""ff5124541b63432781c887c5e68ec743""public""0""public""0b5bcea296534c62af2f70b577d16a1c""0"5"0""P-101 Building 18B Plumbing Sanitary Line Upgrades..pdf"393048"file"".pdf""1""2026-10-29T15:49:12.608+00:00""3fcf5caf5aef4f73a984bf3c9a11298c""public""0""public""afd76469c2f747fcae19fa48908f26c1""0"5"0""E-101 Building 18B Electric and Data Upgrades and Demolition.pdf"846384"file"".pdf""1""2026-10-29T15:49:12.608+00:00""2334c1b848bd47688e590913e4294bbf""public""0""public""62bb0b2bcc2e423e946f1f9c15742ce5""0"5"0""P07 Wage Determination.pdf"3254172"file"".pdf""1""2026-10-29T15:49:12.608+00:00""c5f91922e61c40d7a7ee039bd2ae8e9a""public""0""public""109bf041ff264030bd041ff3e8d7d4cb""0"4"0""S02 852.219-75 Limitation on Subcontracting.pdf"130541"file"".pdf""1""2026-10-29T15:49:12.608+00:00""58e42cf2de874a6ea689b184f2be63e4""public""0""public""c8116fc341054762b17800aeea57b588""0"3"0""Buy American Certificate 52.225-9.pdf"129844"file"".pdf""1""2026-10-29T15:49:12.608+00:00""c3dd6843a0974556b83aa81e6f208044""public""0""public""06d23a6e3352426db89238439313171a""0"2"0""36C24227B0003_1.pdf"3992046"file"".pdf""1""2026-10-29T15:49:12.608+00:00""5b827684b98f43758f392e30d7990235""public""0""public""35c3981a9d7341b887e29b878c7d6d5b""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e53c26f62de2461f996e6874c5c71028), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.