This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 12444627Q0003 is issued as a Request for Quotation (RFQ) for the repair/replacement of a fire hydrant.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110. The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor must supply and install one fire hydrant and valve to replace the damaged existing hydrant, supply CA-7 stone around the base and shoe for proper drainage, supply required pedestrian traffic control for work in a public way, supply trench protection to comply with OSHA standards, and supply backfill in the green area to match existing surrounding grades. The contractor must also dispose or recycle off-site all removed hydrant, valve, and pipe materials, provide adequate water for the work, and minimize dust. Equipment must be modern, in good condition, with a qualified operator, and all heavy equipment must be washed down and inspected for invasive plant species before entering the prairie.
We post new plumbing opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""12444627Q0003 RFQ Hydrant Replacement MDW.pdf"339508"file"".pdf""1""2026-10-29T18:18:47.591+00:00""69cbaed846ba4675b1efc1ee0247db8e""public""0""public""e392087310a44febaef6261d6856c977""0"7"0""Attachment A Statement of Work.pdf"99724"file"".pdf""1""2026-10-29T18:18:47.591+00:00""16317897627848939b97901ae6b80ae7""public""0""public""4d1a2cbbf3c14e5e92ac70a1e4f8a3e8""0"5"0""Attachment B Submission Package.docx"23381"file"".docx""1""2026-10-29T18:18:47.591+00:00""28bfd6f9e1054d63859b67c255132a34""public""0""public""6ebf8082b7fc4a928911cb56885c4897""0"3"0""Attachment C Wage Determination.pdf"352811"file"".pdf""1""2026-10-29T18:18:47.591+00:00""2f23dfbb6f6d49b194a45f20be4b4226""public""0""public""acb7499aca0b44ef841ddbeb83fb70f5""0"2"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e4e143949bed4bb49e51387e0016d16d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.