The Mann-Grandstaff VA Medical Center, Spokane, WA requires labor, materials, and equipment for the repair of sanitary waste piping in Building 1 (Main Hospital) for Project 668-24-108. Please review attached Solication # 36C26027R0021 for full details and proposal submission requirements.
This project will repair and replace the vertical piping riser that serves the Building 1 drinking fountain drains. Access to the multi-story drinking fountain piping chase will be through existing access panels, removal of existing drinking fountain and water coolers, and penetration of walls where new fixtures are to be mounted. The project will remove Asbestos Containing Materials (ACM) piping and fitting wrap insulation that interferes with demolishing piping and remediate friable ACM from accessible surfaces. Lead containing paint and glazed block will need to be remediated or removed. Replace soil piping, fittings, and branches to fixtures. Pipe replacement includes new piping, connections, and any other new components/details necessary to provide service to new ADA/ABAAS compliant bottle-fill semi-recessed water cooler fixtures. Provide new electrical circuits needed to power new refrigerated water cooler fixtures. Repair wall finishes as necessary to restore existing wall surfaces. Contractor shall provide all supervision, labor, tools and materials, installation, programming, startup, training, O&M documentation and one-year warranty of materials and installation.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""98662""VANCOUVER""WA""USA""5115NE 82ND AVE""SUITE 102""Solicitation 36C26027R0021.docx"296677"file"".docx""1""2026-11-02T20:43:38.265+00:00""8fda0463d75f4779b174ed446d549b59""public""0""public""7c332c4f05ba4f9785934ef3c36336d9""0"75"0""Attachment 1 - 668-24-108 Construction SOW R2.docx"46605"file"".docx""1""2026-11-02T20:43:38.265+00:00""df83f317b1124422ac1a711b613de72c""public""0""public""5a8e37fea9134831af6b69ab3997a1fc""0"73"0""Attachment 2.1 668-24-108 Drawings.pdf"4133393"file"".pdf""1""2026-11-02T20:43:38.265+00:00""159c92ff1bfa4149816e4dc907921297""public""0""public""3a1cbd08ef6d40fab5c64dc6df36d57f""0"68"0""Attachment 2.2 668-24-108 Drawings.pdf"22097907"file"".pdf""1""2026-11-02T20:43:38.265+00:00""34af3621862b44218278b7f83aeb5708""public""0""public""d8561c5f3df847e2820d07bc5054ee6f""0"67"0""Attachment 2.3 668-24-108 Drawings.pdf"24901092"file"".pdf""1""2026-11-02T20:43:38.265+00:00""d3c59622ebc1487ba3e212faf33ea67f""public""0""public""95d6a4ea4ec74186996246a46c0499d4""0"64"0""Attachment 3 668-24-108 Bid Set Specifications.pdf"6411086"file"".pdf""1""2026-11-02T20:43:38.265+00:00""f633ce817ea744eeac9fb4bc50368d18""public""0""public""b7841fa0ec20479a8ea0a4a76e7f45c8""0"59"0""Attachment 4 668-24-108 PCRA.pdf"1206662"file"".pdf""1""2026-11-02T20:43:38.265+00:00""821ea57bc4f14d17877eeecad0bd2cb2""public""0""public""dc6e4a056180487aa44e7be701900e90""0"58"0""Attachment 5 668-24-108 DESIGN NARRATIVE.pdf"505461"file"".pdf""1""2026-11-02T20:43:38.265+00:00""9ab4b38ee7dc4f7686571c406dce859e""public""0""public""f0346733b54e42629fea94fe926a08a2""0"57"0""Attachment 6 - 668-24-108 - Limitations on Subcontracting-Construction.pdf"182012"file"".pdf""1""2026-11-02T20:43:38.265+00:00""febf95a78ff049bd86e9d80faedcd198""public""0""public""70a6bb66530f4815815a8cc91397bd83""0"56"0""Attachment 7 - 668-24-108 - Contractor Rules of Behavior.pdf"183302"file"".pdf""1""2026-11-02T20:43:38.265+00:00""ac3f81057a9e4d40a7868c3adf6e5a99""public""0""public""b821b07d0c3946319ab44dcf3e0b1bd9""0"55"0""Attachment 8 - 668-24-108 - Past Performance Questionnaire.docx"124791"file"".docx""1""2026-11-02T20:43:38.265+00:00""9e5a9633c5744d28818af20676cc1af9""public""0""public""8488d8ce4e40403ab9b294bf8de0c072""0"46"0""Attachment 9 668-24-108 Wage Determination.pdf"42486"file"".pdf""1""2026-11-02T20:43:38.265+00:00""51bbc3dde18548ab94821dfaf8e45249""public""0""public""eef083a814064c11b5c4dbeed03c4cc9""0"45"0""Attachment 10 - 668-24-108 - Site Visit Area Map.pdf"173996"file"".pdf""1""2026-11-02T20:43:38.265+00:00""5163cf8ed42348f2b05b317ab9b32c44""public""0""public""47cfd0d69ce149ea889da5e7fd537f5b""0"44"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 24aad4a8414941e9935ad2c61f4e1dae), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.