This solicitation #36C77626B0020 is related to the Sources Sought notice # 36C77626Q0137 which serves as the presolicitation.
In accordance with 15 USC 644, this project is a competitive small business set aside.
This project is located at:
Brooklyn VA Medical Center
800 Poly Place
Brooklyn, NY 11209
Please see attachements for additional details on this procurement.
The contractor shall provide all tools, equipment, materials, labor, supervision, and personnel necessary to complete the FY27 NRM Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction. The project tasks are broken into three categories: (1) install a dedicated life safety branch in Building 1 including automatic transfer switches and electrical distribution equipment for compliance with NFPA 70, NFPA 99, NFPA 110, and VA electrical design requirements; (2) upgrade and/or replace electrical distribution equipment to exceed expected three-phase asymmetrical fault current as determined by a previous SEL electrical study; (3) address equipment code violations determined during a previous SEL electrical study. The contractor shall complete the entire project no later than 540 calendar days after receiving the Notice to Proceed.
We post new electrical opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""Brooklyn VAMC Map.pdf"146585"file"".pdf""1""2026-10-06T19:04:32.713+00:00""850b802f62514ad3844d6e2822d948af""public""0""public""ee931a2215d64e7e80bb7b097d49146f""0"9"0""36C77626B0020 Brooklyn VAMC Construction.pdf"692546"file"".pdf""1""2026-10-06T19:04:32.713+00:00""27b726c7f6344ec6bd7e19a7850b2320""public""0""public""6e6c425ec77d444eb393bfbf32097129""0"8"0""Attachment G - RFI TRACKING SHEET.xlsx"13550"file"".xlsx""1""2026-10-06T19:04:32.713+00:00""4cda4dd9d44e48d1810b9ae211d3e845""public""0""public""9808f9099cdc4e65841248af7c9cbaac""0"7"0""Attachment F - Site Visit Instructions.pdf"49135"file"".pdf""1""2026-10-06T19:04:32.713+00:00""dc2f2c4b75b6410e9472bb0eba05df04""public""0""public""b305b2aacab74fcda5874f8944f822ea""0"6"0""Attachment E - Wages Rates - King County 5-26-26.pdf"6578059"file"".pdf""1""2026-10-06T19:04:32.713+00:00""c96c2bff24874bd78b504e8dd8393146""public""0""public""9eccca975a684987a1e671b854c0824f""0"5"0""Attachment D - Drawings.pdf"11763917"file"".pdf""1""2026-10-06T19:04:32.713+00:00""1d8ed78166214c3fa3152d7efa43b761""public""0""public""a642e5322cef44b098d2951f8ffa0c54""0"4"0""Attachment C - Drawings.pdf"18034623"file"".pdf""1""2026-10-06T19:04:32.713+00:00""b3d29a7a0bfa42b7b0314886fe2deddd""public""0""public""c094908ee85d4c568beb5dcf90d01b0f""0"3"0""Attachment B - Drawings.pdf"12289301"file"".pdf""1""2026-10-06T19:04:32.713+00:00""e888942ce763414d9cc74f0d70ca7cb9""public""0""public""d30749b11b2b40bba609bbfc74b669a9""0"2"0""Attachment A - Specifications - 3-11-26.pdf"7764540"file"".pdf""1""2026-10-06T19:04:32.713+00:00""465dd4d5530c48b6bd9ae7c2498a241c""public""0""public""ec3a951268a042a5a1eaaf60c663ab2d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice a584783e088d4591905ad29e8e5dbaff), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.