In accordance with 15 U.S.C 644 , this project is a competitive small business set aside. The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the FY27 NRM Brooklyn Upgrade Life Safety/ Critical Branch Electrical Distribution Construction 630A4-16-430, in accordance with attached drawings and specifications.
The project is located at: the Brooklyn VA Medical Center, 800 Poly Place, Brooklyn New York 11209.
Please see attachments for additional details on this procurement.
The contractor shall provide all tools, equipment, materials, labor, supervision and personnel to complete the FY27 NRM Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction in Building 1 in accordance with drawings and specifications. Task Nos. 1, 2 and 3 install a dedicated life safety branch with automatic transfer switches and electrical distribution equipment on each floor, Task No. 5 upgrades or replaces distribution equipment for fault current capacity, and Task Nos. 6 through 26 correct equipment code violations, including transformers, switchboards, panelboards, branch circuits, lighting, disconnect switches and fire-rated penetrations, with only Base Item 0001 applicable.
We post new electrical opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""36C77626B0020 - 9-30-26.pdf"692546"file"".pdf""1""2026-09-30T22:48:06.809+00:00""26e6de24301145869de633ef0bd59191""public""0""public""34050a7f1bd64853897a76c6e498fc0a""0"8"0""Attachment G - RFI TRACKING SHEET.xlsx"13550"file"".xlsx""1""2026-09-30T22:48:06.809+00:00""f3077511933d44a68c9d8c4ec07859ca""public""0""public""de5d057c521641ce927dc6eb3f5d4633""0"7"0""Attachment F - Site Visit Instructions.pdf"49135"file"".pdf""1""2026-09-30T22:48:06.809+00:00""23d84a5d684b41369953c2429598cab3""public""0""public""5e7b29449bd049928f131c5f77beb5aa""0"6"0""Attachment E - Wages Rates - King County 5-26-26.pdf"6578059"file"".pdf""1""2026-09-30T22:48:06.809+00:00""c628a149fd8e4cd895daf514170bb57e""public""0""public""c823d73e82294ea8b6a0358e47abc0eb""0"5"0""Attachment D - Drawings.pdf"11763917"file"".pdf""1""2026-09-30T22:48:06.809+00:00""6ac20b5b27e04f9bb43591269849a171""public""0""public""8cbc496c551e4b609e175d751e2e877f""0"4"0""Attachment C - Drawings.pdf"18034623"file"".pdf""1""2026-09-30T22:48:06.809+00:00""883863757a50470ab8e80ca43d67cd2b""public""0""public""940e4ac10eff4c43a7d3e883160f93ba""0"3"0""Attachment B - Drawings.pdf"12289301"file"".pdf""1""2026-09-30T22:48:06.809+00:00""dcd278f27ca34bf09239aaf91e1643b6""public""0""public""f0659d79150d4eef97dd2744e9b95781""0"2"0""Attachment A - Specifications - 3-11-26.pdf"7764540"file"".pdf""1""2026-09-30T22:48:06.809+00:00""f74662173eb3459db05daeec69289c44""public""0""public""84de811abba143a89d1ea0c681a46786""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 74c80b0820d245be9731f8f27d23314b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.