TITLE OF PROJECT: Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs (W912EK27BA012) The work includes, but is not limited to, excavation of earthen levee, inspection and replacement of existing toe drain piping, backfill of excavation, inspection and repair of existing flap gate, replacement of concrete joint sealants, surveying, and site restoration. The work is located in the Mississippi River Basin, within the city of Bettendorf, Scott County, Iowa, and as indicated.
All solicitation documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK27BA012."
The work includes, but is not limited to, excavation of earthen levee, inspection and replacement of existing toe drain piping, backfill of excavation, inspection and repair of existing flap gate, replacement of concrete joint sealants, surveying, and site restoration. The work is located in the Mississippi River Basin, within the city of Bettendorf, Scott County, Iowa.
We post new excavating opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-5001""ROCK ISLAND""IL""USA""KO CONTRACTING DIVISION""1 ROCK ISLAND ARSENAL""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EK27BA012¬iceType=SolicitationNotice"0"link""1""2026-11-03T19:53:24.162+00:00""cd347459237d4c77b686904d30e9340a""public""0""PIEE Solicitation Module Link for W912EK27BA012""public""c3e37df343e0492eb45f1f8e512263ff""0"5"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-03T19:53:24.162+00:00""b20efd1852ba4ebd979edb14da173089""public""0""Web Based Training for the PIEE Solicitation Module""public""e96b6fa153e8406c892941085ed05565""0"4"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-03T19:53:24.162+00:00""52f90392e2144ab3ae8b6c29f99a2ab9""public""0""Registration Instructions for the PIEE Solicitation Module""public""e98812cd301749459a007878acb2d929""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-03T19:53:24.162+00:00""e29d9c23337f4f489f43d7e586cc8960""public""0""Department of Defense Procurement Toolbox""public""240d34b06d1841e4bf5cec014896604c""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice a4815038c6884fb7896567ddd1bb74d9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.