- VERMONT CA-96
Contract Number: C03303
Contract Name: NEWBURY WCRL(20)
VERMONT
AGENCY OF TRANSPORTATION
PROPOSAL
STANDARD SPECIFICATIONS FOR CONSTRUCTION
DATED 2024 SHALL APPLY TO THIS CONTRACT
SPECIAL PROVISIONS
SCHEDULE OF ITEMS
ELECTRONIC BID BOND to be submitted in the amount of 5% of the Contractor's bid.
BIDDING PROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregular if they are not in compliance with Agency specifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
System services.
VTrans Mission and Vision
Through excellent customer service, provide for the safe and efficient movement of people and goods.
A safe, reliable, and multimodal transportation system that grows the economy, is affordable to use and
operate, and serves vulnerable populations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
662-0001 TIMBER DECK AND BACKWALLS, RAILROAD BRIDGE ___________________ 17
404 Corps of Engineers Permit ____________________________________________________ 19
Impact Plans ___________________________________________________________________ 70
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 79
USDOL Davis Bacon Wage Rates 2026 - Orange County _______________________________ 91
Bidding Requirements and Conditions ______________________________________________ 95
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 107
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 112
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 122
Standard Federal EEO Construction Contract Specifications _____________________________ 125
Contractor EEO Certification Form - CA109 _________________________________________ 132
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 133
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 137
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 138
Proposal Schedule of Pay Items ____________________________________________________ 139
Newbury WCRL(20)
PIN Number(s): 15g170 Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS – CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 1, 2027.
2. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process.
3. NOTICE TO BIDDERS – ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://vtrans.vermont.gov/sites/aot/files/documents/VTrans%20Guidance%20for%20Contractor
s%20and%20Suppliers.pdf.
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
4. NOTICE TO BIDDERS – CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on
November 18, 2026. Inquiries received prior to this time will receive a response from the Agency.
Inquiries received after this time may receive a response at the Agency’s discretion.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 2
5. NOTICE TO BIDDERS – OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
404 Corps of Engineers Permit 15g170
Impact Plans
FHWA 1273 – Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements – CR-110
Attachment C – Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances – Appendices A and E
Standard Federal Equal Employment Opportunity Construction Contract Specifications – CA26
Contractor Equal Employment Opportunity Certification Form – CA109
Vermont Agency of Transportation Certificate of Compliance – CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates – CA101
Commodity Index Prices – CA170
Schedule of Pay Items
6. NOTICE TO BIDDERS – BIDDERS LIST FORM. The Contractor is hereby notified that the
Agency is required by the U.S. Department of Transportation to develop and maintain a list of
information about all firms that bid on federally funded Contracts in accordance with 49 C.F.R. §
26.11. The Agency has developed a new electronic form to collect this information. The Contractor
shall fill out this form as part of their project-specific prequalification for every Contract that they
bid on. A link to this form is provided in the prequalification form available through iCX and the
Agency’s website.
7. NOTICE TO BIDDERS – DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
8. NOTICE TO BIDDERS – GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
9. NOTICE TO BIDDERS – STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/user_files/cadd_help/WebFiles/Downloads/Standards/VAO
TconSTD_Owner.xml?_gl=1*1bgjbkk*_ga*MTE4ODI3MzMyMy4xNzcwOTA3Mzk4*_ga_V9
WQH77KLW*czE3OTAyMDEzNjYkbzEyOCRnMCR0MTc5MDIwMTM3MyRqNTMkbDAk
aDA.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 3
10. NOTICE TO BIDDERS – INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
11. NOTICE TO BIDDERS – SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. § 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
12. NOTICE TO BIDDERS – ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of the state and federal listed bats. No suitable bat habitat is present within the project
limits, and no Time-of-Year (TOY) restrictions are required for tree cutting.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees ≥ 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site
Activity Areas.
The Contractor is required to report any dead, injured bat(s) found during construction to
the resident engineer. The VTrans Highways-Technical Services Bureau- Environmental
Section Biologist shall be notified to complete the required coordination.
(b) Archaeology: Post Review Discoveries. If previously unidentified archaeological sites
are discovered during project construction, the Resident Engineer shall notify the VTrans
Archaeology Officer. No further construction shall proceed until the requirements for 36
CFR 800 have been satisfied.
Archaeology: Human Remains. If human remains or ceremonial objects are discovered
either during archaeological excavation or during construction, the project will stop
immediately, and procedures described in the Vermont Statutes including, but not limited
to, 13 V.S.A. § 3761, Unauthorized Removal of Human Remains, and 18 V.S.A. § 5212b,
Unmarked Burial Sites Special Fund and reporting of Unmarked Burial Sites, shall be
followed. Coordination between VTrans and the SHPO shall follow the Advisory
Council's Policy Statement on Treatment of Human Remains and Grave Goods, (1998).
All excavation in the vicinity will cease immediately. Remains shall be left in place and
protected and will follow the procedure below:
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 4
When an unmarked site is first discovered, the discovery shall be reported immediately to
a law enforcement agency. If, after completion of an investigation pursuant to section
5205 of this title, a law enforcement agency determines that the burial site does not
constitute evidence of a crime, the law enforcement agency shall immediately notify the
state archaeologist who may authorize appropriate action regarding the unmarked burial
site (18 VS.A. § 52l 2b(f)).
Historic/Above-Ground: none
(c) Urban Soils Background Area. The project is located within an Urban Soils Background
Area, as shown on the Vermont Agency of Natural Resources Natural Resources Atlas.
These areas may have high background levels of certain constituents, therefore the
Agency has determined that material generated from these areas should be disposed of
within an Urban Soil Background Area except for soils excavated within the railroad right-
of-way. Urban background soils shall be reused on-site to the maximum extent possible
within the Urban Soil Background Area portion of the project. Excess Urban Area soils
shall be disposed off-site by the Contractor within a designated Urban Soils Background
Area. The process for submittal and review of proposed disposal locations shall be in
accordance with Subsection 105.25 through Subsection 105.27.
If the Contractor elects to use an alternate location outside of an Urban Soil Background
Area, then soils must be disposed in accordance with the Investigation and Remediation
of Contaminated Properties Rule (IRule) at no additional expense to the Agency. The
alternate location must be reviewed and approved by the Agency and the Contractor must
secure all necessary permits and approvals from the Vermont Agency of Natural
Resources for the alternate disposal site.
(d) Railroad Right-of-Way Soils. Disturbed soils within the railroad right-of-way shall be
kept within the railroad right-of-way. The disturbed soils shall be either reused on-site
within the railroad right-of-way to the extent possible or disposed of within the railroad
right-of-way at the location provided in the Contract Plans, or as approved through an
offsite activity request submitted by the Contractor. If the Contractor elects to use a
location outside of the railroad right-of-way, then soils must be disposed of and/or
stockpiled in accordance with the Investigation and Remediation of Contaminated
Properties Rule (IRule) at no additional expense to the Agency. The locations must be
reviewed and approved by the Agency and the Contractor must secure all necessary
permits and approvals from the Vermont Agency of Natural Resources.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 5
13. NOTICE TO BIDDERS – UTILITIES. The Contractor is advised that exploratory excavation to
locate existing underground facilities may be necessary to protect these facilities from damage.
Where approved by the Engineer, these utilities shall be located and/or exposed by methods such
as air/vacuum excavation and/or hand digging to determine their exact location. This exploratory
work shall be classified as Trench Excavation of Earth, Exploratory and payment shall be through
Pay Item 204.2200, Trench Excavation of Earth, Exploratory (N.A.B.I.).
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures. The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
204.2200, “Trench Excavation of Earth, Exploratory, (N.A.B.I).”
The Contractor shall notify the aerial utility pole owner if excavation is within 10 feet of an existing
pole. That pole owner may choose to be onsite for this activity. There will be no excavation
allowed within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 (“Dig Safe”) requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays, and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency’s Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency’s underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor’s
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor’s Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 6
14. NOTICE TO BIDDERS – RAILROAD SPECIAL PROVISIONS.
(a) Indemnification; Railroad Protective Liability Insurance. All Contractors hired by the
State pursuant to this Agreement to indemnify and save harmless the Operating Railroad,
the State, their successors and assigns, and their agents and employees, against all loss,
cost, damage and expense, including (but not limited to) damage to Operating Railroad
property, or the property of others, injury or death to Operating Railroad employees or to
others due directly in any way to the work done by the Contractor while working within or
adjacent to the railroad right-of---way during the construction of this Project, as covered
by this Agreement. In this connection, the State will require its Contractors to secure poli-
cies of insurance in the name of the Operating Railroad and the State providing railroad
protective liability coverages of $2,000,000.00 per occurrence and $6,000,000.00 in the
aggregate, or such maximum amount as specified by 23 C.F.R. Part 646 (“Railroads”),
Subpart A(“Railroad-Highway Insurance Protection”) as specified in Subsection
103.04(d) of the latest edition of the Vermont Agency of Transportation’s Standard
Specifications for Construction in effect on the date of the advertisement for bids. Named
insured shall be the Operating Railroad and the State of Vermont.
(b) Additional Insurance. All Contractors hired by the State pursuant to this Agreement
shall secure Contractor’s Liability Protection Insurance providing bodily injury liability
coverage that meets or exceeds the minimum amounts as specified in Subsection
103.04(b) of the latest edition of the Vermont Agency of Transportation’s Standard
Specifications for Construction in effect on the date of the advertisement for bids.
(c) General Statement of Conditions Causing Railroad Hazards.
(1) Scope. Provisions for safeguards to the property and operations of Railroad during
construction by the State’s Contractor.
(2) General. The Contractor shall meet all requirements as specified in Section
632 and Subsection 104.04(b) of the latest edition of the Vermont Agency of
Transportation’s Standard Specifications for Construction in effect on the date of
the advertisement for bids.
The Contractor shall reimburse the Railroad for all necessary flagging and
inspection services required by these specifications. Final settlement with the
Contractor shall be contingent on certification that the Railroad has been
reimbursed.
The Contractor will install, maintain and remove any temporary crossings,
if required, at the expense of the Contractor.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 7
(3) Train Delays/Liquidated Damages. The Contractor shall pay liquidated damages to
the Operating Railroad as specified in Section 199 of the last edition of the Vermont
Agency of Transportation’s Standard Specifications for Construction in effect on
the date of the advertisement for bids. The Operating Railroad shall notify the
Engineer immediately if a train delay has occurred. The Operating Railroad shall
contact the Engineer in writing within 24 hours of the delay occurring to begin the
delay documentation process. If VTrans notes a delay and the Operating Railroad
has not begun the documentation process, the Engineer will contact
the Rail Director to initiate the documentation process. The Engineer will work
with the Operating Railroad to verify the duration and details of the delay. The
Operating Railroad shall, within thirty (30) calendar days of the delay, provide
the Engineer an invoice addressed to the Agency outlining the details of the delay.
After the documentation is received and approved for payment, the Engineer
will initiate the payment process in the next biweekly estimate. The amount owed
to the Operating Railroad will be deducted from the amount due to the Contractor
from the State and will be paid to the Operating Railroad within 30 calendar days
after the delay documentation has been finalized.
TABLE 1 – RAILROAD DELAY PENALTIES
Type of Delay Description Damages
Initial
Each delay that does not exceed a
maximum duration of five minutes
per train
$4,000.00
Incremental
Each additional delay that extends
beyond five minutes to 20 minutes
per train
$2,000.00
Successive Each additional 15-minute period
of time delay per train $1,500.00
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 8
TABLE 2 – EXAMPLE LIQUIDATED DAMAGES CALCULATION
(4) Hazards. For emergency use only, immediately call 888-265-2735.
An operating track shall be considered fouled and subject to hazard when any object
or operation is brought closer than twenty-five (25) feet to the centerline of the
tracks.
A signal line or communication line shall be considered fouled and subject to
hazard when any object is brought closer than four (4) feet to any wire of the
line. An electrical supply line shall be considered fouled and subject to hazard
when any object is brought closer than ten (10) feet to any wire of the line.
Cranes, trucks, power shovels or any other equipment shall be considered as fouling
a track, signal line, communication or electric supply line when working in such a
position that failure of equipment with or without load could foul the track, signal
line, communication or electric supply line. None of these or similar operations
shall be carried on during the approach or passing of a train.
In the construction of staging, false work or forms, the Contractor shall maintain
a minimum vertical clearance of twenty-two (22) feet above the top of high rail and
a minimum side clearance of twenty-five (25) feet from the center line of track
during the approach or passing of a train.
Example of Liquidated Damages for a 65-minute Delay
Minutes of Delay Added Cost Total Time Past Work Window
First 5 minutes $4,000.00 5 minutes
Subsequent 15 minutes $2,000.00 20 minutes (5+15)
An additional 15 minutes $1,500.00 35 minutes (20+15)
An additional 15 minutes $1,500.00 50 minutes (35+15)
An additional 15 minutes $1,500.00 65 minutes (50+15)
$10,500.00 Total for a 65-minute delay
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 9
(d) Periods During Which the State’s Contractor Shall Have Exclusive and Uninterrupted
Access to the Railroad Right-Of-Way. The Operating Railroad grants the State and/or the
State’s Contractor the right of entrance to the railroad right-of-way so that the Project
fieldwork may be completed between April 1, 2027 and October 1, 2027. The temporary
rights shall include exclusive and uninterrupted occupancy of the railroad right-of-way to
access the Project during the following time segments:
(1) Saturday – Sunday 0001 hrs through 2359 hrs each day
(2) One (1) 114 hour closure at the discretion of the operating railroad.
The Contractor is hereby advised that the Operating Railroad’s schedule is subject to
revision. It is not the intention of the Operating Railroad to interrupt any defined
occupancy period events during the contract period. However, in the event
of extraordinary circumstances, the Operating Railroad may request passage of train(s)
through the project limits, in which case, the Contractor will receive verbal notice from the
Operating Railroad at least sixty (60) minutes prior to the train’s arrival. The Contractor
shall allow train passage and shall not be reimbursed for any incurred expense.
Furthermore, no Liquidated Damages will be assessed the Contractor for any delays
occurring within this exclusive and uninterrupted access period.
(e) Periods During Which the State’s Contractor Shall Have Non-Exclusive and Interruptible
Access to the Railroad Right-Of-Way. The Operating Railroad grants the State and/or the
State’s Contractor right of entrance to the railroad right-of-way so that the Project
fieldwork may be completed between April 1, 2027, and October 1, 2027. The State’s
Contractor must confirm temporary work windows with the Operating Railroad prior to
scheduling the work. Temporary work windows shall be non-exclusive and interruptible
occupancy of the railroad right-of-way to access the Project during the following time
segments:
(1) Monday – Friday 0001 hrs through 2359 hrs each day. Expect two trains per
day.
The Contractor is hereby advised that the Operating Railroad’s schedule is subject to
revision. It is not the intention of the railroad to interrupt any defined occupancy period
events during the contract period but from time to time it may be necessary to allow
passage of a train(s) through the project limits. The Contractor will receive verbal notice
communicated by the Operating Railroad at least sixty (60) minutes prior to the train’s
arrival. The Contractor shall allow train passage and shall not be reimbursed for any
incurred expense.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 10
While additional periods of exclusive and non-exclusive track occupancy may be
available, the Operating Railroad does not make any representations to the State as to such
availability. The specified non-exclusive and interruptible occupancy intervals will be
subject to revision.
(f) Vermont Rail System Flagging Service Rates.
(1) Contractor shall request flagger services at least ten days prior to mobilization data
and shall be requested via https://vtrans.vermont.gov on the Rail, Property
Management site.
(2) Flagger time begins and ends at assigned Vermont Rail System (VRS) Terminal.
(3) Cancellation or modification of flagging services assignment must be submitted in
writing and received by VRS at least twenty-four hours prior to start of assigned
time.
(4) Weekday Rates (Monday through Friday):
a. Regular (up to eight (8) hours/day) $88.00 per hour
b. Overtime (after eight (8) hours) $113.00 per hour
c. Mileage: Per GSA published rate at time of advertisement for bids
(5) Weekend (Saturday through Sunday) and Holiday Rates (Holiday schedule per The
State’s labor contract):
a. Per each hour employed $140.00 per hour
b. Mileage: $0.78 per mile
(6) Minimum charge for the flagging work is 4 hours straight time.
(7) The Contractor shall contact Shane Filskov, General Manager, at 802-775-4356 or
at sfilskov@vrs.us.com to coordinate any approved shutdown on the railroad.
The Contractor shall provide, as required by the Operating Railroad, information necessary for
invoicing purposes.
15. NOTICE TO BIDDERS – FEDERAL RAILROAD ADMINISTRATION REGULATIONS. The
Contractor is hereby notified that the Contractor and their subcontractors are required to follow
the requirements of the Code of Federal Regulations (CFR), specifically Title 49, Subtitle B,
Chapter II related to the Federal Railroad Administration, Department of Transportation
Regulations. Particular attention is called to the following Parts:
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 11
(a) Part 213 – Track Safety Standards. The Contractor and subcontractors conducting track
work activities shall be required to comply with 49 CFR 213. When track work activities
are being completed, the Contractor or its subcontractor shall provide a 49 CFR 213
qualified individual to inspect and approve that the track is compliant with track safety
standards prior to train traffic. For further guidance on the requirements of Part 213 – Track
Safety Standards, please go to the following web link: https://www.ecfr.gov/current/title-
49/subtitle-B/chapter-II/part-213?toc=1.
(b) Part 214 – Railroad Workplace Safety. The Contractor and subcontractors shall comply
with 49 CFR Part 214. Any relevant training certifications shall be provided to the
Operating Railroad in advance of construction operations. Recommendations of entities
that provide railroad worker protection safety training will be provided to the Contractor
at the preconstruction conference. Workers without training certification will be required
to take part in a job specific safety briefing with the Operating Railroad prior to the start of
construction operations. Daily job briefings shall be documented by the Contractor and
submitted to the Engineer weekly. For guidance on the requirements of Part 214 – Railroad
Workplace Safety, please go to the following web link: https://www.ecfr.gov/current/title-
49/subtitle-B/chapter-II/part-214.
(c) Part 219 – Control of Alcohol and Drug Use. The Contractor and subcontractors shall
comply with 49 CFR Part 219. For guidance on requirements of Part 219 – Control of
Alcohol and Drug Use, please go to the following web link:
https://www.ecfr.gov/current/title-49/subtitle-B/chapter-II/part-219.
(d) Part 243 – Training, Qualification, and Oversight for Safety Related Railroad Employees.
The Contractor and subcontractors shall comply with 49 CFR Part 243. Any relevant
training certifications shall be provided to the Operating Railroad in advance of
construction operations. For guidance on the requirements of Part 243 – Training,
Qualification, and Oversight for Safety-Related Railroad Employees, please go to the
following web link: https://www.ecfr.gov/current/title-49/subtitle-B/chapter-II/part-243.
16. NOTICE TO BIDDERS – RAILROAD FIRE PREVENTION PLAN. The Contractor is hereby
notified of the Operating Railroad’s requirement for a fire prevention plan. Prior to performing
any construction activities that include an open flame or that may produce sparks in the vicinity of
bridge timbers or timber bridge elements, the Contractor shall provide a fire prevention plan to the
Operating Railroad. This plan shall, at a minimum, include the following components:
(a) General Statement of Fire Safety.
(b) Job Safety Briefings.
(c) Fire Risk Assessment.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 12
(d) Fire Prevention. Fire prevention shall, at a minimum, include measures to soak the area of
work with water and monitor the area for flames for 2 hours after sparks are generated.
(e) Fire Suppression.
17. NOTICE TO BIDDERS – CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 – CONCURRENT CONSTRUCTION PROJECTS
Project Contractor Anticipated Contract
Completion Date
NA NA NA
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
18. NOTICE TO BIDDERS – SPECIAL CONSTRUCTION REQUIREMENTS.
(a) The Contractor shall maintain a safe access to all public roadways, private driveways,
business entrances and public access areas at all times during the construction of this
project.
(b) In no case shall any travel way width for traffic be reduced to less than 14 feet. The travel
way width shall remain free of obstructions and obstacles at all times.
(c) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor’s part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any listed or unlisted special events.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 13
For more information about area special events, contact the following:
Newbury Town Office
4982 Main Street
Newbury, VT 05051
802-866-5521
19. NOTICE TO BIDDERS – AFAD. The Contractor is hereby notified that Automated Flagger
Assistance Devices (AFADs) are remotely operated devices that enable a certified flagger to be
positioned out of the lane of traffic and are used to control motorists through work zones.
AFADs shall only be used in situations where there is no more than one lane of approaching traffic
that needs to be controlled. Additionally, since AFADs are not traffic control signals, they shall
not be used to replace traffic signals or other continuously operating traffic control devices.
These devices may be used as a safety enhancement to flaggers on an hour-for-hour basis. AFADs
shall meet the following requirements:
(a) All AFAD applications shall meet the requirements of the applicable sections of the current
edition of the Manual on Uniform Traffic Control Devices (MUTCD).
(b) All AFAD applications shall be in accordance with NCHRP Report 350 or the MASH for
the applicable test level and device weight. Documentation of the crashworthiness of the
device shall be submitted to the Engineer for approval prior to use on the project.
(c) AFAD applications shall always be controlled by a flagger who has been trained in the
operation of the AFAD and who meets the requirements of Section 630. The flagger shall
not flag traffic and operate an AFAD at the same time.
(d) Should an AFAD malfunction or otherwise not function as intended they shall be replaced
by another AFAD or flagger(s) or work shall cease and the roadway shall be opened to
unrestricted traffic flow immediately.
(e) Each AFAD will be considered equivalent to one flagger and will be measured and paid
for on an hourly basis under Item 630.1500 Flaggers. One hour of AFAD use shall be paid
for as one hour of flagging.
(f) Flaggers will only be measured for payment when actually performing flagging duties.
Flaggers controlling AFADs but not actually flagging will not be measured for payment,
but will be considered incidental to the Contract lump sum price for Item 641.1000 Traffic
Control, or Item 641.1100 Traffic Control, All-Inclusive, as applicable.
(g) The use of AFADs may be suspended at the discretion of the Engineer.
Newbury WCRL(20) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 14
20. NOTICE TO BIDDERS – SUBSECTION 101.02. Subsection 101.02 is hereby modified by
revising the definition of “Contract” to add the phrase “General Special Provisions” immediately
following the phrase “Standard Specifications”.
21. NOTICE TO BIDDERS – SUBSECTION 728.02. When material is supplied in accordance with
Subsection 728.02(b) or Subsection 728.02(e), material in accordance with AASHTO M 180-18 or
AASHTO M 180-23 may be substituted in place of material meeting AASHTO M 180-25.
Special Provisions Part II – Special Specifications
SECTION 662-0001 – TIMBER DECK AND BACKWALLS, RAILROAD BRIDGE
662-0001.01 DESCRIPTION. This work shall consist of constructing a new timber deck and installing
new timber backwalls on a railroad bridge at the locations indicated on the Plans and as directed by the
Engineer.
662-0001.02 MATERIALS. Materials shall meet the requirements of the following subsections:
Mortar, Type IV ..................................................................................................................707.01(e)
Railroad Ties ..............................................................................................................709.04
Bridge Tie Connection Hardware ..............................................................................715.08(i)
Other Bridge Tie Accessories ....................................................................................715.08(j)
Timber Preservative ...................................................................................................726.01
(a) Tie Spacer Curbs. Tie spacer curbs shall be solid sawn treated timber from mixed hardwoods in
accordance with AREMA Chapter 7, Section 1.7 and shall be of the sizes specified on the Plans.
(b) Tie Spacer Blocks. Tie spacer blocks shall be solid sawn treated timber from mixed hardwoods in
accordance with AREMA Chapter 7, Section 1.7 and shall be of the sizes specified on the Plans.
(c) Timber Backwalls. Timber backwalls shall be No. 1 Grade or better solid sawn treated oak in
accordance with AREMA Chapter 7, Section 1.7 and shall be of the sizes specified on the Plans.
662-0001.03 CONSTRUCTION REQUIREMENTS. The Contractor shall remove and properly dispose
of all existing bridge ties, tie spacer blocks, tie spacer curbs, and timber backwalls as shown on the Plans.
New timber bridge ties, tie spacer curbs, tie spacer blocks, and timber backwalls, including tie attachment
hardware, shall be installed as detailed on the Plans and as directed by the Engineer.
Installation of new timber bridge ties, tie spacer blocks, tie spacer curbs, and timber backwalls shall be
performed in accordance with AREMA Chapter 7, Section 1.7.8; AREMA Chapter 7, Part 4; and AREMA
Chapter 15, Section 8.3.
Timber bridge ties and tie spacer blocks shall be installed over the superstructure members. Tie spacer
blocks shall be placed on stringer, beam or girder top flanges between bridge ties and shall be adjusted as
necessary to provide a maximum nominal clear distance between ties of 6 inches for structural ties, 6
inches for bearing ties on steel beams or girders, and 8 inches for bearing ties on timber stringers. At a
minimum, the bridge ties shall be securely fastened to the superstructure every fourth tie, and every other
tie on curved track, or as directed by the Engineer.
Timber backwalls shall be installed as shown on the Plans, followed by the tie spacer curb at the edges of
the deck. Tie spacer curb lengths shall be adjusted as necessary during construction.
Tie spacer blocks and tie spacer curbs shall be securely fastened with 16d galvanized nails directly to all
ties and backwall timbers.
Special Provisions Part II – Special Specifications
Holes for bolts connecting bridge ties to stringers shall be drilled the same diameter as the hex-head bolts
or hook bolts. Bridge tie to stringer connectors shall be installed in accordance with the manufacturer’s
instructions. Holes for all lag screws or lag bolts shall be predrilled with a bit not larger than the body of
the screw at the base of the thread.
All field cut ends and connection holes in timber members shall be treated with a field-applied preservative
treatment in accordance with Subsection 726.01, and as approved by the Engineer.
662-0001.04 METHOD OF MEASUREMENT. When specified to be measured as a lump sum, the
quantity of Timber Deck and Backwalls, Railroad Bridge to be measured for payment will be on a lump
sum basis in the complete and accepted work.
When specified to be measured by the linear foot, the quantity of Timber Deck and Backwalls, Railroad
Bridge to be measured for payment will be the number of linear feet of timber deck installed in the
complete and accepted work, measured along the centerline of the tracks between the backs of abutment
backwalls.
The quantity of Timber Backwall, Railroad Bridge to be measured for payment will be the number of each
timber backwall installed in the complete and accepted w