- Docs
- Label
- BROOKFIELD ER P23-1(668)
- Label
- Geotechnical Data Report
- Kind
- construction
- Due Raw
- 12/4/2026
- Pdf Docs
- 3
- Pdf Text
- VERMONT CA-96
Contract Number: C03301
Contract Name: BROOKFIELD ER P23-1(668)
VERMONT
AGENCY OF TRANSPORTATION
PROPOSAL
STANDARD SPECIFICATIONS FOR CONSTRUCTION
DATED 2024 SHALL APPLY TO THIS CONTRACT
SPECIAL PROVISIONS
SCHEDULE OF ITEMS
ELECTRONIC BID BOND to be submitted in the amount of 5% of the Contractor's bid.
BIDDING PROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregular if they are not in compliance with Agency specifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
System services.
VTrans Mission and Vision
Through excellent customer service, provide for the safe and efficient movement of people and goods.
A safe, reliable, and multimodal transportation system that grows the economy, is affordable to use and
operate, and serves vulnerable populations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
527-0002 LOCAL ROADWAY MAINTENANCE _____________________________________11
404 Corps of Engineers Permit ____________________________________________________ 14
ANR RME Consultation _________________________________________________________ 59
Impact Plans ___________________________________________________________________ 61
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 66
USDOL Davis Bacon Wage Rates 2026 - Orange County _______________________________ 78
Bidding Requirements and Conditions ______________________________________________ 82
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 94
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 99
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 109
Standard Federal EEO Construction Contract Specifications _____________________________ 112
Contractor EEO Certification Form - CA109 _________________________________________ 119
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 120
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 124
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 125
Proposal Schedule of Pay Items ____________________________________________________ 126
Brookfield ER P23-1(668)
PIN Number(s): 24d007 Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS – CONTRACT COMPLETION DATE. This contract shall be completed
on or before October 1, 2027.
2. NOTICE TO BIDDERS – INCENTIVE/DISINCENTIVE (I/D). In accordance with Subsection
108.10 and as described below, there shall be an Incentive/Disincentive period on this Contract.
(a) Dates and Meetings. The allowable I/D work period shall start at 7:00 a.m. and end 14 days
later by 6:59 p.m. This 14 day work period is herein defined as the I/D period. The begin
construction date for the I/D period shall be determined by the Contractor. However, in no
case shall the I/D period begin before 7:00 a.m. on July 1, 2027, and it shall end no later
than 6:59 pm, on August 20, 2027.
During the I/D period, the Contractor will be allowed to work during daylight hours, 7 days
per week, including holiday periods. Night work will not be allowed during the I/D period.
See Notice to Bidders No. 5 and Notice to Bidders No. 6 for additional information and
requirements regarding night work and noise restrictions.
For this Contract, a pre-I/D period meeting shall be held prior to the start of the I/D period,
as described in Subsection 108.10(b).e
(b) Identified Work. All work identified below shall be completed before the end of the I/D
period:
(1) Removal of the existing twin metal culvert pipes, headwalls and wingwalls.
(2) Installation of the new precast concrete box culvert including headwalls and
wingwalls.
(3) Placement of sheet membrane waterproofing.
(4) Backfilling of structure and full placement and compaction of the subbase and
aggregate surface course.
No daily lane closures will be allowed until 14 calendar days prior to the start of the I/D
period, except to progress work for EPSC and traffic control.
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 2
During the 14 calendar days prior to the I/D period the Contractor will be allowed to
maintain a minimum of one-lane (12 foot lane and two 1 foot shoulders) alternating traffic
during daytime hours in order to perform preparatory work. No night work will be allowed
during this window, and two-lane, two-way traffic must be maintained on the existing
alignment during nighttime hours.
(c) Pay Schedule. The Contractor will receive a lump sum compensation of $19,500 for
completing the identified work before the end of the I/D period. If the identified work is
not completed before the end of the I/D period, no portion of the lump sum incentive will
be paid.
In addition to the lump sum payment, the Contractor will also be compensated at a rate of
$650 per hour each hour that the identified work is completed prior to the end of the I/D
period, up to a maximum total payment of $58,500 (including the lump sum payment).
Only whole hours will count toward this extra incentive payment. No incentive payment
will be made for hours during which the Contractor is not allowed to work.
For each hour after the end of the I/D period that the identified work remains uncompleted,
the Contractor will be assessed a disincentive at a rate of $650 per hour. The full hourly
disincentive amount will be assessed for each allowable working hour during which the
identified work is not completed for any portion of the hour. No disincentive will be
charged for hours during which the Contractor is not allowed to work. There shall be no
maximum on the disincentive amount.
This assessed disincentive is separate from, and will be imposed in addition to, liquidated
damages which may be imposed for failure to complete the Contract on time.
Payment for incentive or deduction for disincentive will be made under pay item 199.8101
3. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process.
4. NOTICE TO BIDDERS – NIGHT WORK. The Contractor is hereby notified that night work will
not be permitted on this Contract. Night will be as defined in Subsection 101.02.
5. NOTICE TO BIDDERS – NOISE RESTRICTIONS. The Contractor is hereby notified that, in
addition to the requirements of Subsection 105.14(c), no work shall be performed between 7:00
p.m. and 6:00 a.m. that creates a noise level exceeding 75 decibels. The decibel level shall be
measured from the point of activity to the nearest occupied residence.
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 3
The Contractor shall provide the Engineer, for the duration of the work, with a Rion NL-20,
CESVA SC160, Extech 407780A, or an approved equivalent sound level meter capable of meeting
IEC 61672, Class 2 standards.
The cost for providing this equipment and meeting the specified noise level criteria will not be
paid for separately but will be considered incidental to all other Contract items.
6. NOTICE TO BIDDERS – ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://vtrans.vermont.gov/sites/aot/files/documents/VTrans%20Guidance%20for%20Contractor
s%20and%20Suppliers.pdf
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
7. NOTICE TO BIDDERS – CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time
on November 18, 2026. Inquiries received prior to this time will receive a response from the
Agency. Inquiries received after this time may receive a response at the Agency’s discretion
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 4
8. NOTICE TO BIDDERS – OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
404 Corp of Engineer Permit
ANR RME Consultation
Impact Plans
FHWA 1273 – Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis-Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A, E
Standard Federal Equal Employee Opportunity Construction Contract Specifications CA26
Contractor Equal Employment Opportunity Certification Form – CA109
Vermont Agency of Transportation Certificate of Compliance – CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates – CA101
Commodity Index Prices – CA170
Schedule of Pay Items
9. NOTICE TO BIDDERS – BIDDERS LIST FORM. The Contractor is hereby notified that the
Agency is required by the U.S. Department of Transportation to develop and maintain a list of
information about all firms that bid on federally funded Contracts in accordance with 49 C.F.R. §
26.11. The Agency has developed a new electronic form to collect this information. The Contractor
shall fill out this form as part of their project-specific prequalification for every Contract that they
bid on. A link to this form is provided in the prequalification form available through iCX and the
Agency’s website.
10. NOTICE TO BIDDERS – DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
11. NOTICE TO BIDDERS – GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following
address: https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
12. NOTICE TO BIDDERS – STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 5
13. NOTICE TO BIDDERS – INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
(b) Geotechnical Report
14. NOTICE TO BIDDERS – SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. § 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting.
15. NOTICE TO BIDDERS – ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of state and federal listed bats. No suitable bat habitat is present within the project limits
and no Time-of-Year (TOY) restrictions are required.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees ≥ 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site Activity
Areas.
16. NOTICE TO BIDDERS – UTILITIES. Existing aerial facilities owned by Green Mountain Power,
EC Fiber, FirstLight Fiber, and Fidium will be adjusted, as necessary, by employees or agents of
the above companies in accordance with the “Approximate Aerial Utility Relocation Route”
shown in the Contract Plans. The Contractor is cautioned to protect these facilities from damage.
Contacts for the above listed companies are as follows:
Green Mountain Power Ian Treadway (802) 353-5079
EC Fiber Jason Brewer (802) 431-8297
FirstLight Fiber Heather Araujo (978) 302-9334
Fidium Tucker Peterson (802) 735-7550
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 6
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures. The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
“204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I).”
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
The Contractor shall notify the utility pole owner if excavation will be within 10 feet of an existing
pole. The pole owner may choose to be onsite for this activity. There will be no excavation allowed
within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 (“Dig Safe”) requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of- way, the Contractor must contact the Agency’s Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency’s underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is hereby notified that many towns are not members of Dig Safe. It is the
Contractor’s responsibility to check with towns prior to excavation and protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor’s Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations, and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
17. NOTICE TO BIDDERS – CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 7
TABLE 1 – CONCURRENT CONSTRUCTION PROJECTS
Project Contractor
Anticipated Contract
Completion Date
BROOKFIELD STP SURF(77) TBD Summer 2027
BROOKFIELD IM DECK(53) TBD Fall 2028
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
18. NOTICE TO BIDDERS – SPECIAL CONSTRUCTION REQUIREMENTS.
(a) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable
Changeable Message Signs will be paid for under Contract item 641.1500 or 641.1700, as
applicable. The Contractor shall also install and maintain appropriate construction signing
warning the traveling public of the expected roadway surface conditions.
(b) Prior to final acceptance of the project, all drop inlets, within the project limits shall be
cleaned and all material within the drop inlets. Costs for this work will not be paid for
directly but will be considered incidental to all Contract items.
Brookfield ER P23-1(668) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 8
(c) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor’s part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to
Bidders. There will be no extra compensation paid to the Contractor for any inconvenience
caused by working around any listed or unlisted special events. For more information about
area special events, contact the following:
Carol Monness, Town Clerk
Town of Brookfield, VT
40 Ralph Road, Brookfield, VT
townclerk@brookfieldvt.org
802-276-3352
19. NOTICE TO BIDDERS – SUBSECTION 101.02. Subsection 101.02 is hereby modified
by revising the definition of “Contract” to add the phrase “General Special Provisions”
immediately following the phrase “Standard Specifications”.
20. NOTICE TO BIDDERS – SUBSECTION 728.02. When material is supplied in accordance with
Subsection 728.02(b) or Subsection 728.02(e), material in accordance with AASHTO M 180-18 or
AASHTO M 180-23 may be substituted in place of material meeting AASHTO M 180-23.
Special Provisions Part II – Special Specifications
SECTION 527-0002 – LOCAL ROADWAY MAINTENANCE
527-0002.01 DESCRIPTION. This work shall consist of maintaining the pre-closure roadway conditions
along the detour route specified on the Plans.
The work under this section shall be performed in accordance with these specifications and the Plans, and
Section 527.
527-0002.02 MATERIALS. Materials shall meet the requirements of the following subsections:
Performance-Graded Asphalt Binder .........................................................................702.01
Emulsified Asphalt.....................................................................................................702.02
Warm-Mix Asphalt Technologies..............................................................................702.03
Anti-Strip Additives ...................................................................................................702.04
Aggregate for Bituminous Concrete Mixtures ...........................................................704.10
Aggregate Surface Course .........................................................................................704.12(a)
Aggregate Shoulders ..................................................................................................704.12(c)
Aggregate Shoulders, RAP ........................................................................................704.12(d)
Recycled Asphalt Materials .......................................................................................704.22
Joint Sealer, Hot Poured ............................................................................................707.02(a)
Polyurea Pavement Markings ....................................................................................708.07(a)
Epoxy Paint ................................................................................................................708.07(b)
Thermoplastic Pavement Markings, Type A .............................................................708.08(a)
General Bituminous Concrete Mixture Design Requirements ..................................716.02(a)
Superpave Mixtures ...................................................................................................716.02(b)
Bituminous Mixing Plant and Laboratory .................................................................716.03
Preparing and Mixing Bituminous Concrete Mixtures ..............................................716.04
Optics .........................................................................................................................754.01
Topsoil .......................................................................................................................755.02
Seed ............................................................................................................................755.04
Agricultural Limestone ..............................................................................................755.08
Liquid Lime ...............................................................................................................755.09
Hay Mulch .................................................................................................................755.10(a)
527-0002.03 ROUTE SURVEY REQUIREMENTS. The Contractor shall conduct pre- and post-closure
surveys using video, pictures, and written notes to document the roadway condition prior to and following
the closure period designated in the Contract. The Contractor shall provide the opportunity for the
Engineer and a representative from each town the detour route passes through to participate in each survey.
(a) The pre-closure survey shall occur a minimum of 7 calendar days prior to the beginning of the
closure period. The Contractor shall provide the pre-closure survey to the Engineer a maximum of
5 calendar days following performance of the pre-closure survey.
Special Provisions Part II – Special Specifications
(b) The post-closure survey shall occur a maximum of 5 calendar days following the end of the closure
period. The Contractor shall provide the post-closure survey to the Engineer a maximum of 2
calendar days following performance of the post-closure survey.
Route survey video shall be recorded in high definition (1280 × 720 pixels) or better in the MP4 file
format, and, to the satisfaction of the Engineer, have sufficient quality to determine the roadway condition.
Picture and written note submittals shall meet the requirements of Subsection 105.06(a).
527-0002.04 REPAIR REQUIREMENTS. The Engineer and town representatives will monitor the
condition of the detour route. Any work required during and after the closure period shall be performed
by the Contractor within 2 calendar days of being notified by the Engineer. As determined by the Engineer,
roadway damage not attributable to the use of the roadway as a detour route shall not be repaired.
Roadway maintenance shall return the roadway to its pre-closure condition, as directed by the Engineer.
This work shall include, but not be limited to:
(a) Pavement maintenance, including pothole, raveling, and cracking repairs. Bituminous concrete
pavement shall be installed in accordance with Section 406. Mixture type, number of gyrations,
binder grade, and traffic designation for local roadway maintenance shall be as listed on the Plans.
If the mixture type, gyration, binder grade, or traffic designation are not included on the Plans,
they shall be Type IVS, 50 or 65 gyration, and 58S-28. Acceptance testing will not be required for
bituminous concrete pavement placed under this item.
(b) Any aggregate surfaces that have been damaged shall be repaired and re-graded in accordance with
Section 401.
(c) Pavement markings that have been visibly degraded shall be restored using epoxy paint, polyurea,
or extruded thermoplastic in accordance with Section 646.
(d) Any roadway shoulders that have been damaged shall be repaired and regraded in accordance with
Section 402.
(e) Any areas adjacent to the roadway that have been disturbed (e.g. by truck turning movements)
shall be re-graded and turf shall be re-established in accordance with Section 651.
(f) Other repairs, as directed by the Engineer.
Work and materials used for local roadway maintenance shall meet all applicable requirements of the
appropriate sections of the Standard Specifications.
527-0002.05 METHOD OF MEASUREMENT. The quantity of Local Roadway Maintenance (N.A.B.I.)
to be measured for payment will be the cost, in dollars, for maintaining and repairing local roadways used
as a detour during the closure period. Costs will be calculated on a force account basis in accordance with
Subsection 109.06.
Special Provisions Part II – Special Specifications
527-0002.06 BASIS OF PAYMENT. The accepted quantity of Local Roadway Maintenance (N.A.B.I.)
will be paid as specified for force account work in Subsection 109.06. Payment will be drawn against the
Contract dollar amount. To provide a common proposal for all bidders, the Agency has entered an amount
in the proposal to become part of the Contractor’s total bid. However, the Contractor will be reimbursed
for the actual cost of maintaining the local roadway as determined in accordance with Subsection 109.06.
The costs of performing the pre- and post-closure surveys, providing documentation to the Engineer, and
other coordination required for reviewing roadway conditions will not be paid for directly but will be
considered incidental to all Contract items.
Payment will be made under:
Pay Item Pay Unit
527.1000002 Local Roadway Maintenance (N.A.B.I.) ............................................Dollar
State of Vermont Agency of Transportation
Highways- PDB Environmental Section
219 N. Main Street
Barre, VT 05641
Memorandum
To:
From:
Date:
Subject:
Project File
US Corps of Engineers (USCOE) General Permit Self Verification Memo
I have reviewed project for potential impacts to USCOE jurisdictional areas (wetlands
and waterways). I have determined the project qualifies for Self-Verification (SV) under the COE VT General
Permit NAE-2022-00024. All General Conditions (conditions 1-38 pages 27-38,) of the VTGP apply to this
project and a copy of the permit will need to be included in the contract documents. Respective Contractors
completing work authorized under this VTGP need to be familiar with all conditions of this permit. Please pay
particular attention to conditions 19 & 20 as there are important in-stream time of year restrictions and culvert
requirements under the SV process, as well as other special requirements. The VTGP is effective from
December 6, 2022, through December 6, 2027.
If the Contractor proposes modified or additional project limits, the project may no longer qualify for coverage
under the SV process. It is the Contractor’s responsibility to seek coverage of any project changes under the SV
process, VTGP, or with a USCOE Individual Permit. Please contact the USCOE at (802) 872-2893 for any
questions.
Attached
COE VT GP NAE 2022-00024
USCOE VT Project Office Contact:
U.S. Army Corps of Engineers
New England District,
Vermont Project Office
11 Lincoln Street, Room 210
Essex Junction, Vermont 05452
(802) 872-2893, (802) 879-7638 fax
www.nae.usace.army.mil/missions/regulatory
cenae-r-vt@usace.army.mil10/6/25Jessie Johnson, VTrans BiologistBrookfield ER P23-1(668)
General Permit No.: NAE-2022-00024 Effective Date: December 6, 2022
Applicant: General Public in the State of Vermont Expiration Date: December 6, 2027
DEPARTMENT OF THE ARMY GENERAL PERMITS
FOR THE STATE OF VERMONT
The New England District of the U.S. Army Corps of Engineers (USACE) hereby issues
twenty-one (21) regional general permits (GPs) for activities subject to USACE jurisdiction
in waters of the United States (WOTUS), including navigable waters, within the boundaries
of the state of Vermont. These GPs are issued in accordance with USACE regulations at
33 CFR 320–332 (see 33 CFR 325.2(c)(1)). These GPs will provide protection to the
aquatic environment and the public interest while effectively authorizing activities that have
no more than minimal individual and cumulative adverse environmental effects.
This document contains the following sections: Page
SECTION I. JURISDICTION/AUTHORITY TO ISSUE PERMITS 2
SECTION II. REVIEW CATEGORIES AND APPLICATION PROCEDURES 2-4
SECTION III. GENERAL PERMITS 4-26
SECTION IV. GENERAL CONDITIONS 27-38
SECTION V. CONTACTS 39
SECTION VI. DEFINITIONS 40-44
In issuing these GPs, the Federal Government does not assume any liability for the
following: (a) damages to the permitted project or uses thereof as a result of other permitted
or unpermitted activities or from natural causes; (b) damages to the permitted project or
uses thereof as a result of current or future activities undertaken by or on behalf of the U.S.
in the public interest; (c) damages to persons, property or to other permitted or unpermitted
activities or structures caused by the activity authorized by any of the GPs; (d) design or
construction deficiencies associated with the permitted work; or (e) damage claims
associated with any future modification, suspension or revocation of these permits.
________________________________________ __December 6, 2022___________
Tammy R. Turley Date
Chief, Regulatory Division
2
SECTION I. JURISDICTION/AUTHORITY TO ISSUE PERMITS
1. A Department of the Army Permit is required from USACE for the following regulated
activities:
a. The construction of any structure in, over, or under any navigable water of the U.S.
(see 33 CFR 328), the excavating or dredging from or depositing of material in such waters,
or the accomplishment of any other work affecting the course, location, condition, or capacity
of such waters. The USACE regulates these activities under Section 10 of the Rivers and
Harbors Act of 1899 (see 33 CFR 322); and
b. The discharge of dredged or fill material and certain discharges associated with
excavation into WOTUS including wetlands. The USACE regulates these activities under
Section 404 of the Clean Water Act (see 33 CFR 323).
2. Related laws: 33 CFR 320.3 includes a list of related laws including, but not limited to,
Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408, “Section 408”), Section 401
of the Clean Water Act, Section 402 of the Clean Water Act, Section 307(c) of the Coastal
Zone Management Act of 1972, Section 106 of the National Historic Preservation Act of
1966, Section 7 of the Endangered Species Act, the Fish and Wildlife Coordination Act of
1956, the Magnuson-Stevens Fishery Conservation and Management Act, Section 302 of
the Marine Protection, Research and Sanctuaries Act of 1972, and Section 7(a) of the Wild
and Scenic Rivers Act.
3. In order for an authorization under these GPs to be valid, a Water Quality
Certification (WQC) under Section 401 of the CWA (33 USC 1341) or waiver thereof
must be obtained from the Vermont Agency of Natural Resources (VT ANR),
Watershed Management Division prior to the commencement of work in USACE
jurisdiction. The VT ANR has granted an Individual WQC for all activities authorized
under these GPs provided those activities meet the criteria as contained in these GPs
and USACE notifies VT ANR of projects obtaining written verification under these
GPs. The VT ANR will respond within the same response times required of the
Federal resource agencies.
SECTION II. REVIEW CATEGORIES AND APPLICATION PROCEDURES
1. In order for activities to qualify for these GPs, they shall meet the terms and conditions
of this document, including the eligibility criteria listed in Section III and the general
conditions (GCs) listed in Section IV. The USACE will consider any activity requiring USACE
authorization to be unauthorized if that activity is under construction or completed and does
not comply with all of the terms and conditions of the GPs. The USACE will evaluate
unauthorized activities for enforcement action under 33 CFR part 326. Any activity not
specifically listed may still be eligible for authorization under these GPs; prospective
permittees are advised to contact USACE for specific eligibility determinations.
2. Project proponents are encouraged to contact the USACE Vermont Project Office
(VPO) with questions at any time (mailing address: 11 Lincoln Street, Room 210, Essex
Junction, Vermont 05452; email: cenae-r-vt@usace.army.mil; phone: (802) 872-2893).
Pre-application meetings (see 33 CFR 325.1(b)), whether arranged by USACE or
requested by applicants, are encouraged to facilitate the review of projects. Pre-
application meetings and/or site visits can help streamline the permit process by alerting
the applicant to potentially time-consuming concerns that may arise during the evaluation
3
of a project (e.g., avoidance, minimization and compensatory mitigation requirements,
historic properties, and endangered species).
3. Federal and state jurisdiction may differ in some instances. Applicants are
responsible for applying for and obtaining all required federal, state or local approvals
(see GC 1). A permit from USACE may be required for specific activities regardless of
state of Vermont jurisdiction.
These GPs may also be used to authorize projects that are not regulated by the state
of Vermont.
4. How to Obtain/Apply for Authorization:
Project proponents must read each GP and the GCs to see if an activity is eligible for
authorization.
a. Self-Verification (SV):
May proceed without application or notification to USACE provided the project proponent
verifies that the activity will meet the terms and conditions of applicable GPs. Project
proponents shall comply with other federal laws such as the National Historic Preservation
Act (NHPA), the Endangered Species Act (ESA) and the Wild and Scenic Rivers Act
(WSRA). Consultation with outside experts, such as the State Historic Preservation Officer
(SHPO), federally-recognized tribes in the state of Vermont (Tribal Historic Preservation
Officers, or THPOs), National Park Service (NPS), and the U.S. Fish and Wildlife Service
(USFWS) listed in Appendix V may also be necessary. The USACE relies on the VT ANR
Environmental Notice Bulletin (ENB) for notification of SV projects, as applicable.
b. Pre-Construction Notification (PCN):
i. For activities that do not qualify for SV, the applicant must submit a PCN to obtain
written verification from USACE before starting work in USACE jurisdiction. Digital submissions
are encouraged and preferred and can be submitted directly to USACE staff by email, or at
cenae-r-vt@usace.army.mil. Applicants must submit at least the following information:
• A completed USACE application form (ENG Form 43451).
• Plans that illustrate the proposed work in reference to the limits of USACE
jurisdiction as applicable. Plans should show existing and proposed conditions
and contain all other appropriate information.
• Federal wetland delineation documentation (i.e., Wetland Determination Data
Forms).
• Any information on federally listed endangered and threatened species and
critical habitat that occur or may occur in the project area (See GC 12).
• Any correspondence with the SHPO and THPOs indicating coordination with
these entities to ensure compliance with GC 11. Applicants are encouraged to
submit a copy of their application materials to the SHPO and the THPOs, at the
1 Located at www.nae.usace.army.mil/regulatory under “Useful Documents, Forms and
Publications.”
4
same time, or before, they apply to USACE to be reviewed for the presence of
historic, archaeological or tribal resources in the permit area that the proposed
work may affect.
The USACE will coordinate review of all PCN activities with the interagency review team
(IRT) comprised of federal and state agencies and federally recognized tribes to ensure that
the proposed activity results in no more than a minimal impact to the aquatic environment.
This may require project modifications involving avoidance, minimization, and/or
compensatory mitigation for unavoidable impacts to ensure the net effects of a project are
minimal.
ii. Emergency Situations: Contact USACE immediately in the event of an emergency to
obtain information on the verification process and coordination requirements. The USACE
regulation at 33 CFR 325.2(e)(4) states that “an “emergency” is a situation which would result
in an unacceptable hazard to life, a significant loss of property, or an immediate, unforeseen
and significant economic hardship if corrective action requiring a permit is not undertaken
within a time period less than the normal time needed to process the application under
standard procedures.” Emergency work is subject to the same terms and conditions of these
GPs as non-emergency work, and similarly, must qualify for authorization under these GPs;
otherwise, an individual permit (IP) shall be required. Upon notification, USACE will determine
if a project qualifies for emergency procedures under the GPs and whether work may proceed
prior to submittal of an application. Where an application is required, USACE staff will work
wi