- Docs
- Label
- CHESTER ER P23-1(319) & CHESTER ER P23-1(320)
- Label
- Geotechnical Data Report - 23d794
- Label
- Geotechnical Data Report - 23d795
- Label
- TMP Checklist - 23d794
- Label
- TMP Checklist - 23d795
- Kind
- construction
- Due Raw
- 12/11/2026
- Pdf Docs
- 3
- Pdf Text
- VERMONT CA-96
Contract Number: C03304
Contract Name: CHESTER ER P23-1(319) & CHESTER ER P23-1(320)
VERMONT
AGENCY OF TRANSPORTATION
PROPOSAL
STANDARD SPECIFICATIONS FOR CONSTRUCTION
DATED 2024 SHALL APPLY TO THIS CONTRACT
SPECIAL PROVISIONS
SCHEDULE OF ITEMS
ELECTRONIC BID BOND to be submitted in the amount of 5% of the Contractor's bid.
BIDDING PROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregular if they are not in compliance with Agency specifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
System services.
VTrans Mission and Vision
Through excellent customer service, provide for the safe and efficient movement of people and goods.
A safe, reliable, and multimodal transportation system that grows the economy, is affordable to use and
operate, and serves vulnerable populations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
ANR RME Consultation - 23d794 __________________________________________________ 13
ANR RME Consultation - 23d795 __________________________________________________ 15
404 Corps Of Engineers Permit - 23d794 ____________________________________________ 17
404 Corps Of Engineers Permit - 23d795 ____________________________________________ 62
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 107
USDOL Davis Bacon Wage Rates 2026 - Windsor County ______________________________ 119
Bidding Requirements and Conditions ______________________________________________ 123
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 135
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 140
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 150
Contractor EEO Certification Form - CA109 _________________________________________ 153
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 154
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 158
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 159
Proposal Schedule of Pay Items ____________________________________________________ 160
Chester ER P23-1(319), Chester ER P23-1(320)
PIN Number(s): 23D794, 23D795 Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS – CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 15, 2027.
2. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process.
3. NOTICE TO BIDDERS – WORK OUTSIDE OF THE CONSTRUCTION SEASON. The
Contractor is hereby notified that limited work outside of the construction season, as defined in
Subsection 101.02, will be permitted on this Contract. Only activities necessary to clear trees, as
determined by the Engineer, will be allowed to be performed outside the construction season. The
Contractor shall notify the Engineer at least 14 calendar days before work outside the construction
season is to begin.
Allowance of work outside of the construction season does not relax or waive any applicable
specification requirements, including requirements and limitations related to workmanship,
weather, temperature, materials, or any other conditions for any item of work.
4. NOTICE TO BIDDERS – NIGHT WORK. The Contractor is hereby notified that night work will
not be permitted on this Contract. Night will be as defined in Subsection 101.02.
5. NOTICE TO BIDDERS – ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 2
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://vtrans.vermont.gov/sites/aot/files/documents/VTrans%20Guidance%20for%20Contractor
s%20and%20Suppliers.pdf
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
6. NOTICE TO BIDDERS – ELECTRONIC TICKETING VTRANS PORTAL. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the VTrans
Portal and use the application for distribution and management of electronic tickets (e-tickets).
VTrans Portal is a state cloud-based e-ticket database, including a web-based user interface and a
jobsite mobile e-ticket application. VTrans Portal will interface with the Contractor’s supplier
existing point of sales or e-ticketing platform and will allow VTrans to manage bituminous
material e-tickets.
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22/
7. NOTICE TO BIDDERS – CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on
December 2, 2026. Inquiries received prior to this time will receive a response from the Agency.
Inquiries received after this time may receive a response at the Agency’s discretion.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 3
8. NOTICE TO BIDDERS – OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
ANR RME Consultation – 23b794
ANR RME Consultation – 23b795
404 Corps of Engineers Permit – 23b794
404 Corps of Engineers Permit – 23b795
FHWA 1273 – Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements – CR-110
Attachment C – Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A and E
Contractor Equal Employment Opportunity Certification Form – CA109
Vermont Agency of Transportation Certificate of Compliance – CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates – CA101
Commodity Index Prices – CA170
Schedule of Pay Items
9. NOTICE TO BIDDERS – BIDDERS LIST FORM. The Contractor is hereby notified that the
Agency is required by the U.S. Department of Transportation to develop and maintain a list of
information about all firms that bid on federally funded Contracts in accordance with 49 C.F.R. §
26.11. The Agency has developed a new electronic form to collect this information. The Contractor
shall fill out this form as part of their project-specific prequalification for every Contract that they
bid on. A link to this form is provided in the prequalification form available through iCX and the
Agency’s website.
10. NOTICE TO BIDDERS – DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
11. NOTICE TO BIDDERS – GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
12. NOTICE TO BIDDERS – STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/user_files/cadd_help/WebFiles/Downloads/Standards/VAO
TconSTD_Owner.xml?_gl=1*1bgjbkk*_ga*MTE4ODI3MzMyMy4xNzcwOTA3Mzk4*_ga_V9
WQH77KLW*czE3OTAyMDEzNjYkbzEyOCRnMCR0MTc5MDIwMTM3MyRqNTMkbDAk
aDA.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 4
13. NOTICE TO BIDDERS – INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist – 23d794
(b) Traffic Management Plan (TMP) Checklist – 23d795
(c) Geotechnical Report – 23d794
(d) Geotechnical Report – 23d795
14. NOTICE TO BIDDERS – SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. § 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
15. NOTICE TO BIDDERS – ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of the northern long-eared bat and tricolored bat. The Contractor shall ensure all personnel
working on the project site are aware of all environmental commitments related to the
northern long-eared bat and tricolored bat.
All trees shall be clearly demarcated prior to removal. The removal of trees shall be
completed between OCT 1- APR15, inclusive.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees ≥ 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site Activity
Areas.
(b) Invasive Material. If invasive species are delineated on the Plans or found in the project
area and confirmed by the Engineer, the invasive species, and any soil excavated from
areas that contained the invasive species, will be termed invasive material.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 5
The Contractor shall handle the invasive material in accordance with the VTrans State
Highway System Roadside Terrestrial Invasive Plants Best Management Practices
(BMPs). The Contractor shall stockpile the invasive material separately from other soil
stockpile areas. A ground barrier and perimeter containment system shall be in place
around the area intended for stockpiling the invasive material. Equipment shall be cleaned
of all soil and plant matter prior to arriving on site in accordance with Subsection 107.06.
The equipment used for excavation and transport of invasive material shall be cleaned of
all soil and plant matter before being used for work in other areas in accordance with the
BMPs.
To the extent possible, invasive material shall be reused on site. Invasive material shall
only be reused on site in areas where the presence of the invasive species were clearly
evident. If there is an excess of invasive material, it shall be wasted in accordance with the
BMPs.
The cost of excavating invasive material will be paid for under the appropriate Contract
excavation items. When invasive species are delineated on the Plans, the additional cost
for handling invasive material, following the BMPs, cleaning equipment, and wasting
excess invasive material will be incidental to all other Contract items. When invasive
species are not delineated on the Plans, and compensation is not otherwise provided for in
the Contract, the work of handling invasive material, following the BMPs, cleaning
equipment, and wasting excess invasive material will be considered extra work in
accordance with Subsection 104.03 and will be paid for in accordance with Subsection
109.06.
16. NOTICE TO BIDDERS – UTILITIES ER P23-1(319). Existing aerial facilities owned by Green
Mountain Power, Comcast Communications, and Vermont Telephone will be adjusted, as
necessary, by employees or agents of the above companies in accordance with the “Approximate
Aerial Utility Relocation Route” shown in the Contract Plans.
Contacts for the above listed companies are as follows:
Green Mountain Power Greg Heaton (802) 770-0134
Comcast Communications Craig Kemp (603) 494-9555
Vermont Telephone Company Judy Paton (802) 885-7757
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09 Cooperation with Utilities.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 6
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
“204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I).”
The Contractor shall notify the aerial utility pole owner if excavation is within 10 feet of an existing
pole. That pole owner may choose to be onsite for this activity. There will be no excavation
allowed within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 (“Dig Safe”) requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays, and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency’s Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency’s underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor’s
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12 Protection and Restoration of
Utilities and Services
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor’s Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
17. NOTICE TO BIDDERS – UTILITIES ER P23-1(320). Existing aerial facilities owned by Green
Mountain Power, Vermont Telephone Company, and Comcast Communications will not require
adjustment. The Contractor is cautioned to protect these facilities from damage.
Contacts for the above listed companies are as follows:
Green Mountain Power Greg Heaton (802) 770-0134
Comcast Communications Craig Kemp (603) 494-9555
Vermont Telephone Company Judy Paton (802) 885-7757
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 7
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09 Cooperation with Utilities.
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
“204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I).”
The Contractor shall notify the aerial utility pole owner if excavation is within 10 feet of an existing
pole. That pole owner may choose to be onsite for this activity. There will be no excavation
allowed within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 (“Dig Safe”) requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays, and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency’s Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency’s underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor’s
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12 Protection and Restoration of
Utilities and Services
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor’s Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 8
18. NOTICE TO BIDDERS – CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 – CONCURRENT CONSTRUCTION PROJECTS
Project Contractor Anticipated Contract
Completion Date
Andover ER P23-1(223) TBD Fall 2027
Chester BO 1442(39) TBD Fall 2027
Chester STP BP17(4) TBD Winter 2027
Statewide STP CRAK(47) TBD Fall 2026
Ludlow ER P23-1(341) TBD Spring 2028
Ludlow ER P23-1(340) TBD Fall 2028
Cavendish ER P23-1(233) TBD Fall 2027
Chester REGM2335 TBD Spring 2027
Chester REGM2346 TBD Winter 2027
Cavendish STP 2032(10) TBD Summer 2027
Cavendish STP 2032(11) TBD Fall 2027
Cavendish STP 2032(12) TBD Fall 2027
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
19. NOTICE TO BIDDERS – SPECIAL CONSTRUCTION REQUIREMENTS.
(a) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 13 feet. This paved width shall remain free of
obstructions and obstacles at all times.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 9
(b) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs will be paid for under Contract item 641.1500. The Contractor shall also
install and maintain appropriate construction signing warning the traveling public of the
expected roadway surface conditions.
(c) Prior to final acceptance of the project, all drop inlets, bridge downspouts, and bridge joints
within the project limits shall be cleaned and all material within the drop inlets and bridge
joints shall be removed. All paved areas adjacent to curbs shall be swept and cleaned of all
extraneous material. Costs for this work will not be paid for directly but will be considered
incidental to all Contract items.
(d) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor’s part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any listed or unlisted special events.
For more information about area special events, contact the following:
Chester: Preston Bristow
Town Planner
Town of Chester
556 Elm Street
Preston.bristow@chestervt.gov
(802) 875-2173
20. NOTICE TO BIDDERS – SUBSECTION 101.02. Subsection 101.02 is hereby modified by
revising the definition of “Contract” to add the phrase “General Special Provisions” immediately
following the phrase “Standard Specifications”.
Chester ER P23-1(319), Chester ER P23-1(320) Advertised November 18, 2026
Special Provisions Part I – Notices to Bidders Page 10
21. NOTICE TO BIDDERS – SUBSECTION 726.08. Subsection 726.08(a) is hereby modified by
being deleted in its entirety and replaced with the following:
(a) Waterproofing Membrane System, Type I. Type I waterproofing membrane system shall
be a Type I cold applied elastomeric system in accordance with ASTM D6153, except as
modified below.
(1) Permeability. The system shall have a maximum water vapor permeance of 1.0
perm, as determined in accordance with ASTM E96.
22. NOTICE TO BIDDERS – SUBSECTION 728.02. When material is supplied in accordance with
Subsection 728.02(b) or Subsection 728.02(e), material in accordance with AASHTO M 180-18 or
AASHTO M 180-23 may be substituted in place of material meeting AASHTO M 180-25.
From: AOT - Power Automate
To: Goldstein, Lee; Ramsey, Jeff; Held, JulieAnn; Keedy, Mike
Cc: Gingras, Glenn; Eldridge, William; Pfeiffer, Rebecca; Jensen, Scott; Buckley, Courtney; Good, Shawn
Subject: ChesterERP23-1(319) - [Project] 19 Review
Date: Monday, March 16, 2026 2:06:40 PM
Do not reply to this email.
**This item has been updated.**
Project ChesterERP23-1(319) has been approved by scott.jensen@vermont.gov. The
following Standard Conditions apply: .
Title-19 Standard Conditions:
1. A) The project shall be constructed as defined in the documents linked to the
ChesterERP23-1(319) project in this Title 19 Share Point site. B) Any amendment to the
plans which in any way affects surface waters and/or riparian corridors shall be
reviewed by this office and approval received by VTrans prior to construction. C) Any
construction modifications that deviate from the approved plans which in any way
affects surface waters and/or riparian corridors shall be reviewed by this office and
approval received by VTrans prior to the construction activity.
2. That the contractor's schedule of accomplishment of water quality related work to be
submitted prior to the start of construction, and as required under general specification
#105.23(a) shall include site-specific methods of operation. Temporary construction
fills, check dams, silt barriers and other erosion control works shall be described and
shown on pertinent plans. 4>That the Vermont Agency of Transportation general
specification #105.23 addressing the control of erosion and siltation be carefully
adhered to in order to minimize turbidity and other adverse impacts.
3. That the Vermont Agency of Transportation general specification #105.24 addressing
pollution control be carefully followed in order to limit, if not prevent altogether, the
discharge of fuel, grease, oil, raw concrete, paint, chemicals, and debris to any waters of
the state.
4. An on-site pre-construction conference between the contractor, VTrans Resident
Engineer and the River Management Engineer (scott.jensen@vermont.gov) shall be held
prior to commencement of any in-stream construction. Please contact the ANR River
Management Engineer listed at the top of this email to schedule the conference.
5. Approved in-stream working dates on this project are from June 1 - October 1 .
Contractor proposals for construction activities in or adjacent to flowing water during
the restricted period must be isolated from stream flow and must receive prior approval
from the River Management Engineer.
6. The provisions of this approval shall be made a part of the construction contract.
EA: P231319 100
Stream alteration; Agency of Transportation reviews; bridge, culvert, and high risk projects:
$350.00.
ANR Permit Number: 4680
Project GUID:
From: AOT - Power Automate
To: Goldstein, Lee; Ramsey, Jeff; Held, JulieAnn; Keedy, Mike
Cc: Gingras, Glenn; Eldridge, William; Pfeiffer, Rebecca; Jensen, Scott; Buckley, Courtney; Good, Shawn
Subject: ChesterERP23-1(320) - [Project] 19 Review
Date: Monday, March 16, 2026 1:12:13 PM
Do not reply to this email.
**This item has been updated.**
Project ChesterERP23-1(320) has been approved by scott.jensen@vermont.gov. The
following Standard Conditions apply: .
Title-19 Standard Conditions:
1. A) The project shall be constructed as defined in the documents linked to the
ChesterERP23-1(320) project in this Title 19 Share Point site. B) Any amendment to the
plans which in any way affects surface waters and/or riparian corridors shall be
reviewed by this office and approval received by VTrans prior to construction. C) Any
construction modifications that deviate from the approved plans which in any way
affects surface waters and/or riparian corridors shall be reviewed by this office and
approval received by VTrans prior to the construction activity.
2. That the contractor's schedule of accomplishment of water quality related work to be
submitted prior to the start of construction, and as required under general specification
#105.23(a) shall include site-specific methods of operation. Temporary construction
fills, check dams, silt barriers and other erosion control works shall be described and
shown on pertinent plans. 4>That the Vermont Agency of Transportation general
specification #105.23 addressing the control of erosion and siltation be carefully
adhered to in order to minimize turbidity and other adverse impacts.
3. That the Vermont Agency of Transportation general specification #105.24 addressing
pollution control be carefully followed in order to limit, if not prevent altogether, the
discharge of fuel, grease, oil, raw concrete, paint, chemicals, and debris to any waters of
the state.
4. An on-site pre-construction conference between the contractor, VTrans Resident
Engineer and the River Management Engineer (scott.jensen@vermont.gov) shall be held
prior to commencement of any in-stream construction. Please contact the ANR River
Management Engineer listed at the top of this email to schedule the conference.
5. Approved in-stream working dates on this project are from May 1 - December 1 .
Contractor proposals for construction activities in or adjacent to flowing water during
the restricted period must be isolated from stream flow and must receive prior approval
from the River Management Engineer.
6. The provisions of this approval shall be made a part of the construction contract.
EA: P231320 100
Stream alteration; Agency of Transportation reviews; bridge, culvert, and high risk projects:
$350.00.
ANR Permit Number: 4679
Project GUID:
State of Vermont Agency of Transportation
Highways- PDB Environmental Section
219 N. Main Street
Barre, VT 05641
Memorandum
To:
From:
Date:
Subject:
Project File
US Corps of Engineers (USCOE) General Permit Self Verification Memo
I have reviewed project for potential impacts to USCOE jurisdictional areas (wetlands
and waterways). I have determined the project qualifies for Self-Verification (SV) under the COE VT General
Permit NAE-2022-00024. All General Conditions (conditions 1-38 pages 27-38,) of the VTGP apply to this
project and a copy of the permit will need to be included in the contract documents. Respective Contractors
completing work authorized under this VTGP need to be familiar with all conditions of this permit. Please pay
particular attention to conditions 19 & 20 as there are important in-stream time of year restrictions and culvert
requirements under the SV process, as well as other special requirements. The VTGP is effective from
December 6, 2022, through December 6, 2027.
If the Contractor proposes modified or additional project limits, the project may no longer qualify for coverage
under the SV process. It is the Contractor’s responsibility to seek coverage of any project changes under the SV
process, VTGP, or with a USCOE Individual Permit. Please contact the USCOE at (802) 872-2893 for any
questions.
Attached
COE VT GP NAE 2022-00024
USCOE VT Project Office Contact:
U.S. Army Corps of Engineers
New England District,
Vermont Project Office
11 Lincoln Street, Room 210
Essex Junction, Vermont 05452
(802) 872-2893, (802) 879-7638 fax
www.nae.usace.army.mil/missions/regulatory
cenae-r-vt@usace.army.mil11/17/25Jessie Johnson, VTrans BiologistChester ER P23-1(319)Chester ER P23-1(319)
General Permit No.: NAE-2022-00024 Effective Date: December 6, 2022
Applicant: General Public in the State of Vermont Expiration Date: December 6, 2027
DEPARTMENT OF THE ARMY GENERAL PERMITS
FOR THE STATE OF VERMONT
The New England District of the U.S. Army Corps of Engineers (USACE) hereby issues
twenty-one (21) regional general permits (GPs) for activities subject to USACE jurisdiction
in waters of the United States (WOTUS), including navigable waters, within the boundaries
of the state of Vermont. These GPs are issued in accordance with USACE regulations at
33 CFR 320–332 (see 33 CFR 325.2(c)(1)). These GPs will provide protection to the
aquatic environment and the public interest while effectively authorizing activities that have
no more than minimal individual and cumulative adverse environmental effects.
This document contains the following sections: Page
SECTION I. JURISDICTION/AUTHORITY TO ISSUE PERMITS 2
SECTION II. REVIEW CATEGORIES AND APPLICATION PROCEDURES 2-4
SECTION III. GENERAL PERMITS 4-26
SECTION IV. GENERAL CONDITIONS 27-38
SECTION V. CONTACTS 39
SECTION VI. DEFINITIONS 40-44
In issuing these GPs, the Federal Government does not assume any liability for the
following: (a) damages to the permitted project or uses thereof as a result of other permitted
or unpermitted activities or from natural causes; (b) damages to the permitted project or
uses thereof as a result of current or future activities undertaken by or on behalf of the U.S.
in the public interest; (c) damages to persons, property or to other permitted or unpermitted
activities or structures caused by the activity authorized by any of the GPs; (d) design or
construction deficiencies associated with the permitted work; or (e) damage claims
associated with any future modification, suspension or revocation of these permits.
________________________________________ __December 6, 2022___________
Tammy R. Turley Date
Chief, Regulatory Division
2
SECTION I. JURISDICTION/AUTHORITY TO ISSUE PERMITS
1. A Department of the Army Permit is required from USACE for the following regulated
activities:
a. The construction of any structure in, over, or under any navigable water of the U.S.
(see 33 CFR 328), the excavating or dredging from or depositing of material in such waters,
or the accomplishment of any other work affecting the course, location, condition, or capacity
of such waters. The USACE regulates these activities under Section 10 of the Rivers and
Harbors Act of 1899 (see 33 CFR 322); and
b. The discharge of dredged or fill material and certain discharges associated with
excavation into WOTUS including wetlands. The USACE regulates these activities under
Section 404 of the Clean Water Act (see 33 CFR 323).
2. Related laws: 33 CFR 320.3 includes a list of related laws including, but not limited to,
Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408, “Section 408”), Section 401
of the Clean Water Act, Section 402 of the Clean Water Act, Section 307(c) of the Coastal
Zone Management Act of 1972, Section 106 of the National Historic Preservation Act of
1966, Section 7 of the Endangered Species Act, the Fish and Wildlife Coordination Act of
1956, the Magnuson-Stevens Fishery Conservation and Management Act, Section 302 of
the Marine Protection, Research and Sanctuaries Act of 1972, and Section 7(a) of the Wild
and Scenic Rivers Act.
3. In order for an authorization under these GPs to be valid, a Water Quality
Certification (WQC) under Section 401 of the CWA (33 USC 1341) or waiver thereof
must be obtained from the Vermont Agency of Natural Resources (VT ANR),
Watershed Management Division prior to the commencement of work in USACE
jurisdiction. The VT ANR has granted an Individual WQC for all activities authorized
under these GPs provided those activities meet the criteria as contained in these GPs
and USACE notifies VT ANR of projects obtaining written verification under these
GPs. The VT ANR will respond within the same response times required of the
Federal resource agencies.
SECTION II. REVIEW CATEGORIES AND APPLICATION PROCEDURES
1. In order for activities to qualify for these GPs, they shall meet the terms and conditions
of this document, including the eligibility criteria listed in Section III and the general
conditions (GCs) listed in Section IV. The USACE will consider any activity requiring USACE
authorization to be unauthorized if that activity is under construction or completed and does
not comply with all of the terms and conditions of the GPs. The USACE will evaluate
unauthorized activities for enforcement action under 33 CFR part 326. Any activity not
specifically listed may still be eligible for authorization under these GPs; prospective
permittees are advised to contact USACE for specific eligibility determinations.
2. Project proponents are encouraged to contact the USACE Vermont Project Office
(VPO) with questions at any time (mailing address: 11 Lincoln Street, Room 210, Essex
Junction, Vermont 05452; email: cenae-r-vt@usace.army.mil; phone: (802) 872-2893).
Pre-application meetings (see 33 CFR 325.1(b)), whether arranged by USACE or
requested by applicants, are encouraged to facilitate the review of projects. Pre-
application meetings and/or site visits can help streamline the permit process by alerting
the applicant to potentially time-consuming concerns that may arise during the evaluation
3
of a project (e.g., avoidance, minimization and compensatory mitigation requirements,
historic properties, and endangered species).
3. Federal and state jurisdiction may differ in some instances. Applicants are
responsible for applying for and obtaining all required federal, state or local approvals
(see GC 1). A permit from USACE may be required for specific activities regardless of
state of Vermont jurisdiction.
These GPs may also be used to authorize projects that are not regulated by the state
of Vermont.
4. How to Obtain/Apply for Authorization:
Project proponents must read each GP and the GCs to see if an activity is eligible for
authorization.
a. Self-Verification (SV):
May proceed without application or notification to USACE provided the project proponent
verifies that the activity will meet the terms and conditions of applicable GPs. Project
proponents shall comply with other federal laws such as the National Historic Preservation
Act (NHPA), the Endangered Species Act (ESA) and the Wild and Scenic Rivers Act
(WSRA). Consultation with outside experts, such as the State Historic Preservation Officer
(SHPO), federally-recognized tribes in the state of Vermont (Tribal Historic Preservation
Officers, or THPOs), National Park Service (NPS), and the U.S. Fish and Wildlife Service
(USFWS) listed in Appendix V may also be necessary. The USACE relies on the VT ANR
Environmental Notice Bulletin (ENB) for notification of SV proje
- Enriched
- Yes
- Pdf Pages
- 184
- Vtrans Id
- C03304
- Categorized By
- llm
- Questions Due Raw
- 12/2/2026