Pre-Bid Conference: Preproposal Conference will be conducted via Microsoft Teams on Wednesday, October 14, 2026, at 11:00 am. See Pre-Proposal Invite in Attachments.
The contractor shall furnish all professional services, labor, materials, equipment, supervision, transportation, software, licenses, permits, testing, and incidentals necessary to provide complete operational systems at both locations. At Market Square East, St. Thomas, the work includes designing and installing a hurricane-rated solar PV parking canopy (≥42 kW DC), a 200-300 kWh battery energy storage system (BESS) with minimum 100 kW continuous AC discharge, and a 100-150 kW aggregate DC fast charging system with two CCS1/NACS-compatible connectors, including payment processing. At the VIYA Building, St. Croix, the work includes a 200-300 kWh BESS with minimum 100 kW continuous AC discharge, a minimum 100 kW aggregate DC fast charging system with two connectors, and coordination with the existing solar carport (no new PV). Both sites require microgrid operation with islanded charging capability during utility outages, an energy management system (EMS) to enforce a maximum 100 kW grid-import limit, OCPP-capable chargers, and secure web-based monitoring. The contractor must provide complete site surveys, design packages (30%, 60%, 90%, and Issued-for-Construction), permits, commissioning, operator training, and first-year operations and maintenance.
We post new electrical opportunities in Virgin Islands as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: VI Dept. of Property and Procurement (solicitation BD-26-270-2702-3179), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.