Read the notice and its 7 attached documents and pull out the scope, the deadlines and what you have to submit.
Estimated value: $14,000,000.
SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform renovation services to the restrooms and breakrooms at the William P. Clements State Office Building, floors 1-12 and 14 located at 300 W 15th Street, Austin, Texas 78701 hereinafter described as TFC Project #26-005-4203 (the Project). This Project will be administered by TFC. This procurement will be a two-step award process with a two-part work requirement.
a) Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements.
b) Step Two of the solicitation will include only the highest ranked five or fewer Respondents from Step One who will be asked to provide pricing.
SECTION II - PROJECTDESCRIPTION
PROJECT DESCRIPTION: The project consists of renovations of the existing restrooms, adding additional restrooms, and renovations of the existing breakrooms on floors 1-12 and 14. The renovations will include upgrading the existing sanitary sewer lines on floors 1-12 and 14. The project is located within the William P. Clements State Office Building located at 300 W 15th St., Austin Texas.
ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ.
THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning (BECx and CxA), and Construction Materials Testing.
SECTION III - SCOPE OF WORK
SERVICES: CMR services shall be comprehensive in nature and will include but not be limited to: pre-construction services, estimation services, participation in constructability reviews, development/management of complex critical path schedules and bidding multiple packages as necessary to execute the project scope of work. The number of bid packages and Guaranteed Maximum Price amendments to be determined by TFC in cooperation with the A/E and CMR
PART ONE: Collaborate with TFC and its Architect and Engineer Firm (A/E) and third-party consultants, and stakeholders during the completion of construction documents including review and comments at each negotiated milestone prior to completion of Construction Documents. The Respondent’s expertise will be used to affect value engineering, establish a project schedule and ultimately determine the GMP. The services include attending meetings, consultation of plan reviews, constructability reviews, and cost estimating. Provide CMR services from pre-design through construction close-out, as described in Attachment G – CMR Contract Template.
PART TWO: In accordance with the approved schedule and GMP, the Contractor is responsible for managing the competitive solicitation process for subcontractors and helping the owner/client select those subcontractors, while complying with all VetHUB requirements and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E & TFC.
SUBCONTRACTORS: Subcontractors providing services shall meet the same requirements and level of experience as required of the Respondent. No subcontract shall relieve the primary Respondent of responsibility for the service. If the Respondent uses a subcontractor for any or all of the work required, the following conditions shall apply under the listed circumstances:
a) Respondents planning to subcontract all or a portion of the work shall identify the proposed subcontractors on the Attachment B – Subcontracting Plan Forms.
b) Subcontracting shall be at the Respondent’s expense.
c) TFC retains the right to check a subcontractor’s background and make a determination to approve or reject the use of submitted subcontractors.
d) The Respondent shall be the only contact for TFC and subcontractors. Respondent shall list a designated point of contact for all TFC and subcontractor inquiries.
SATISFACTORY UNDERSTANDING: Respondents will be held to have satisfactory understanding regarding all existing conditions and to have included in the proposal an amount sufficient to cover all work including permits, fees, etc.
CONTRACT TERM: Construction is required tocommence within five (5) calendar days after the Notice to Proceed forConstruction is issued. For planning purposes, the pre-construction time periodis estimated to be one hundred and eighty (180) calendar days. The construction contract period is projectedfor a term of three hundred and sixty-five (365) calendar days except as may beotherwise amended or negotiated.
MANDATORYPRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will be held onMonday, November 30, 2026, at 10:00am and Tuesday December 01, 2026, at 2:00pm.Pre-registration is required to participate in the teleconference. Respondents must have an employee of theirfirm attend at least one (1) of the two (2) pre-submittal conferences. TFCshall reject qualifications submitted by firms that did not attend one of themandatory pre-submittal conferences.
EVENT
DATE
Issue RFQ
11/17/2026
Mandatory Pre-Submittal Teleconferences
1st Pre-Submittal Conference
OR
2nd Pre-Submittal Conference
11/30/2026, 10:00 AM
OR
12/01/2026, 02:00 PM
Deadline for SP Good Faith Effort Notification Emails
12/03/2026
Deadline for Submission of Questions
12/09/2026, Noon
TFC’s Response to Questions
12/11/2026, 5:00 PM
Deadline for Submission of Qualifications and SP
12/15/2026, 3:00 PM
Notification of Short List Selection
12/28/2026
Optional Site Visit
01/05/2027, 10:00 AM
Deadline for Submission of Step 2 Pricing Proposals
01/08/2027, 3:00 PM
If interviews are NOT required by TFC
Award by Commission
02/18/2027, 9:00 AM
Execute Contract
03/01/2027
If interviews are required by TFC
Notification of Interview Selection
01/12/2027
Interviews
01/20/2027
Award by Commission
02/18/2027, 9:00 AM
Execute Contract
03/01/2027
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Texas SmartBuy (ESBD) (solicitation 0010246), retrieved via the Texas Comptroller Electronic State Business Daily. View the official posting, and always confirm requirements and deadlines with the issuing agency.