Project generally consists of approximately 1,120-ft of water line replacement, nine (9) pressure reducing valve assemblies, individual pressure reducing valve installation at 160 customer meters, high service pump replacement and associated yard piping, electrical, instrumentation, and SCADA integration.
Type of work: Water lines, pressure reducing assemblies, high service pump station, electrical & instrumentation control
Engineer's estimate: $3,600,000
Pre-bid meeting: November 19, 2026 at 1:30 PM (Chicago) — 18236 Lakepoint Cove, Point Venture, TX 78645 — Pre-Bid meeting will be held at the WCID Point Venture Water Treatment Plant
Bid opening: December 3, 2026 at 2:00 PM (Chicago) — 18606 Venture Drive, Point Venture, TX 78645 — Bid opening in person at WCID Point Venture's Main Office
Questions due: November 30, 2026 at 2:00 PM (Chicago)
Bid documents (download requires a free CivCast account):
Project generally consists of approximately 1,120-ft of water line replacement, nine (9) pressure reducing valve assemblies, individual pressure reducing valve installation at 160 customer meters, high service pump replacement and associated yard piping, electrical, instrumentation, and SCADA integration.
We post new electrical opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aea1e12251dba42419c9a30), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.