Dallas VAMC Utility Tunnel Pumproom Chilled Water Pumps Replacement and Upgrades In Accordance with the Statement of Work (SOW).
The contractor shall furnish all labor, engineering, materials, rigging, demolition, installation, testing, startup, commissioning, training and warranty for replacement of seven chilled-water pumps with bases, vibration isolation, valves, strainers, gauges, flow meters and piping modifications, five new VFDs with bypass packages and circuit breakers, Siemens electronic control valves and Apogee/Desigo BAS integration with graphics, alarms and trending, plus leak, electrical and functional performance testing and PE-sealed closeout documentation within 270 days.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""36C25727Q0097.pdf"619843"file"".pdf""1""2026-11-13T17:55:57.868+00:00""8b76309399894601a041db2b96bf7a4f""public""0""public""a593647c2a874f29b9e28d95fb4ebc18""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b458a55a68254471a20b39660b0c980f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.