No Right-of-Way Acquisition Services are expected for the projects under this agreement.
No further information on this project beyond what is contained in the advertisement will be made available from the Department.
Please submit questions to the Department through the ECMS Forum feature.
The Department anticipates the delivery method as design-bid-build; however, the Department reserves the right to convert any portion of the project to design-build (DB) at any time during the project delivery process.
All equipment (including MPT) necessary to complete design of the project shall be furnished by the consultant.
Firms are not expected/encouraged to visit these bridges prior to submitting a Statement of Interest
Please see the attachment for a list of potential projects, anticipated SOW, and additional information.
The anticipated date of selection for this agreement is 01/13/2027, with a NTP on the first work order anticipated for 02/01/2027.
The Department of Transportation will retain an engineering firm for a project specific Open-end agreement for the services indicated below:
During the life of this Project Specific Open-End Agreement, the District intends to execute work orders for structure improvements to be completed by County Maintenance forces.
The engineering work and services that may be required under this Project Specific Open End agreement may include, but are not limited to: general engineering studies, traffic studies, perform field surveys, plot topography and cross sections, prepared submission for utility verification and relocations engineering, prepare all pertinent submissions and materials necessary for the Department to prepare the application to PUC and for the PUC field conference, attend and supply and required information for all PUC meetings and hearings during the design of the project, develop erosion control details and narrative, prepare right of way plans, complete structure designs include type, size and location reports, core boring layouts and foundation designs and reports, develop traffic control plans with narratives, conduct soils investigations and prepare soil reports, investigate utility involvement on the projects, provide material for and participate in value engineering reviews, coordinate contracts with railroad officials and procure railroad related costs, permits, and insurance, collect signal timing, accident data and other traffic flow data, document engineering study findings and activities, perform alternative analysis to assess and mitigate impacts, and prepare construction plans, specifications, and estimates. These engineering services identified are the general work activities that can be expected under this Project Specific Open-End Agreement. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Project Specific Open End Agreement.
The areas of environmental study which may be required under this Project Specific Open End agreement may include, but are not limited to: air quality, noise energy vibration, hazardous waste, surface water and ground water quality, surface water and ground water hydrology, terrestrial ecology including threatened and endangered species, wetlands, soils, geology, farmlands, visual, quality socioeconomic resources, cultural resources, Section 4(f) Evaluations, early coordination and scoping correspondence meeting, minutes, public meeting and hearing presentations, visualization materials, handouts, and displays, technical basis reports (TBRs), and/or technical files, NEPA environmental documents, Section 106 documents, mitigation plans and reports, wetland and floodplain findings, and preliminary engineering plans, and remote sensing/mapping innovations. The format and content of all documents will be consistent with applicable State and Federal regulations, policies and guidelines. These environmental studies identified are the general work activities that can be expected under this Project Specific Open-end Agreement. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Project Specific Open-end Agreement.
No additional structures can be added other than the ones listed in the attachment.
The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking.
The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:
All questions and answers are required to go through ECMS's "Questions and Responses" forum.
The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is 5 years.
The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below.
The engineering services and environmental studies identified above are the general work activities that can be expected under this Open-end Contract. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Open-end Contract.
Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the [General Requirements](SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Non Construction Inspection Services&FILE_DATE=06/26/2026) document.
During the 5-year agreement the District will execute work orders for structure improvements completed by County Maintenance forces, with engineering services including general and traffic studies, field surveys, topography, utility verification and relocations, PUC submissions and meetings, erosion control, right-of-way plans, structure type-size-location reports, boring layouts, foundation and soils reports, traffic control plans, value engineering, railroad coordination, signal and accident data, alternatives analysis, and PS&E packages, plus environmental studies covering air, noise, hazardous waste, water quality and hydrology, ecology, wetlands, soils, farmlands, socioeconomics, cultural resources, Section 4(f), NEPA and Section 106 documents, mitigation, and mapping, limited to the BRKEY structures listed in the attachment with design-bid-build delivery and consultant-furnished equipment.
We post new architecture and design opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_ADV_19368), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.