Read this notice and pull out the scope, the deadlines and what you have to submit.
This project consists of a bridge replacement of the SR 2018 structure over Otter Creek with a single-span prestressed concrete spread box beam bridge. Work also includes minor approach work, guide rail updates, roadway reconstruction, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 2018, SECTION 016, in YORK COUNTY, CHANCEFORD TOWNSHIP, from Segment 0080 Offset 0490 to Segment 0080 Offset 0937 for an overall project length of 350 linear feet (0.066 mile).
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
We post new excavating opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_117655_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.