Install temporary work zone traffic control, remove and construct concrete curb ramps, sidewalks, and curbs, remove and replace asphalt, remove and install striping, legends, pavement bars, remove and install signs, install flashing beacon located at US101 and Market Avenue in Coos County Oregon.
Pre-Bid Conference: A mandatory pre-bid conference will be held on November 3, 2026 at 11:00 AM (Pacific), located at Market Avenue and US101 (US 101 MP 238.17). Parking is available on US101 across from Wells Fargo between Commercial Ave and Market Ave.
The work includes, but is not limited to: install temporary work zone traffic control, remove and construct concrete curb ramps, sidewalks, curbs, remove and replace asphalt, remove and install striping, legends, pavement bars, remove and install signs, install flashing beacons. The project also includes providing temporary work zone traffic control, installing and maintaining erosion control, removal of concrete curb ramps, sidewalks, curbs as shown on the plans, constructing concrete curb ramps, sidewalks and curbs as shown on the plans, removal and replacement of asphalt as shown on plans, removal of striping, legends, pavement bars as shown on plans, installation of striping, legends, pavement bars as shown on plans, removal of existing signs as shown on plans, installation of signs as shown on plans, and installation of flashing beacon as shown on plans.
We post new asphalt opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OregonBuys (bid S-73000-00018254), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.